    North Sea I, South, Offshore Wind Farm

    Energistyrelsen

    North Sea I, South, Offshore Wind Farm

    1. Competition notice published

      Nov 20, 10:07 AMNovember 20, 2025 10:07 AM
    2. Questions deadline

      Oct 2, 9:55 PMOctober 2, 2028 9:55 PM
    3. Tender submission deadline

      Oct 23, 12:00 PMOctober 23, 2028 12:00 PM
    4. Opening date

      Oct 23, 12:05 PMOctober 23, 2028 12:05 PM
    5. Tender validity period

      Jun 23, 12:00 PMJune 23, 2029 12:00 PM

    Brief

    Tender search/Energistyrelsen/North Sea I, South, Offshore Wind Farm
    Brief

    Elektrisk utstyr og belysning

    Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

    About the bid

      The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, South, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, South Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 6.6 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. Reference is made to the Annex F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference) for an overall description of the principles in capability-based two-way CfD scheme. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). Please note that the name of the offshore wind farm can be changed by the Danish Energy Agency (“DEA”). Such change will not affect the geographical location of the offshore wind farm. The North Sea I, South will in the following be called “the Offshore Wind Farm”. The minimum capacity of the Offshore Wind Farm shall be established no later 31 December 2034. The concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the concessionaire. The Concession Agreement further enables the Concessionaire to establish overplanting capacity in excess of the required minimum capacity within the concession area, i.e. it is optional for Concessionaire to establish more than 1 GW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include but is not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit and/or procurement material. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance" as well as in the procurement material Appendix 2 (Location of the Concession Area). Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specification), and the procurement material as a whole.

      Contact name
      Camilla Juel Irmark
      Contact phone
      +4533922347
      Contact email
      owfprocurement@ens.dk
      Address
      Carsten Niebuhrs Gade 43, 1577 København V

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Award of the Concession Agreement to the most economically advantageous tender will take place on the basis of the award criterion, “price”. The award criterion, “price”, will be assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price must constitute a price per unit of electricity in “DKK”/MWh excl. VAT, which the Tenderer will be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer will constitute the so-called “strike price” under the Concession agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area).

      Evaluation Method

      The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area.

    Qualification requirements

    • Description

      The Tenderer must fulfil the following minimum requirement in order to demonstrate the ability to perform the Concession Agreement: 1. At least one (1) reference covering a largescale offshore project in relation to energy production, completed within the last ten (10) years. A largescale offshore project in relation to energy production must, as a minimum, have the following characteristics in order to be considered: a. Construction costs (CAPEX) of minimum DKK 500,000,000, b. be fixed to the seabed, at least at 10 meters sea depth in average across the site, and c. have a duration of contract, permit, licence, approval or the like of min. 25 years. The reference must show experience with at least three (3) of the six (6) following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation, or 6) quality control. The Tenderer may document experience with the above in a minimum of three (3) key areas via one (1) or more references, provided that each reference covers a largescale offshore project in relation to energy production. Only references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be accepted. As regard the assessment of whether a largescale offshore project is completed within the latest ten (10) years, the DEA will accept the following examples (which are not exhaustive): • An offshore wind farm with an A/C substation where the last turbine has delivered the first kWh to the grid (fully commissioned offshore wind farm). • An offshore oil- and gas development project including installation of fixed installations and commissioning and subsequent production/operation.

      Documentation Requirement

      Information regarding the references should be specified in part IV, section C of the ESPD. If the Tenderer prefers to submit the list of references as a separate document, this is accepted as well. However, illustrations, photographs etc. will not be taken into account. Re (1) For each project used as a reference (at least one (1), maximum five (5) references), the Tenderer must provide the following description: a. Name of largescale offshore project b. Description of main elements of the largescale offshore project including where relevant grid connection (AC-substation, etc.) from the offshore project to onshore/offshore point of connection; c. Contact person at the contracting entity and/or the authority who awards the permit/licence/approval or the like (preferably including phone number and email address); d. Contract signing date or the date of issuing the permit/licence/approval etc. (with the minimum duration of 25 years); e. Location of the largescale offshore project; f. The Tenderer's/the supporting entity’s role (i.e. developer, owner, main consultant, sub-contractor, financial investor, or other); g. The Tenderer's/the supporting entity’s contribution to the project within the following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation and/or 6) quality control; h. Time of completion of the project (within the last 10 years). If more than a total of five (5) references completed within the latest ten (10) years before the expiry of the deadline for submission of tender are submitted by a Tenderer, including where a Tenderer is a group of economic entities, e.g. a consortium or joint venture, only the five (5) newest references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be considered. If it is not possible to identify the five (5) newest references, the five (5) newest references will be selected by drawing of lots of the references submitted by the remaining entities in the group of Tenderers or from the supporting entities which has been completed within the latest ten (10) years before the expiry of the deadline for submission of tender. Upon request, the Tenderer to whom the DEA intends to award the Concession Agreement must submit documentation regarding the information stated in the ESPD, cf. section 151 of the Danish Public Procurement Act. The list of references, that the Tenderer specifies in the ESPD will constitute the final documentation for the Tenderer's information about the technical and professional capacity. Reference is further made to the Procurement Specifications, section 11.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Energistyrelsen
    Title
    North Sea I, South, Offshore Wind Farm
    Type
    CompetitionPrequalification
    Main code
    45000000Construction work
    Supplemental codes
    31121320Wind turbines31121330Wind turbine generators31121340Wind farm31160000Parts of electric motors, generators and transformers31170000Transformers31213400Distribution system31300000Insulated wire and cable45244000Marine construction works45244100Marine installations
    Location
    Vestjylland
    Estimated value
    DKK 6,600,000,000.00
    Duration
    40 years

    Active similar competitions

    • Energinet Systemansvar A/S.

      Bank- og finansformidlingstjenester

      Procurement Countertrade Energy Services - 26/16015

      Energinet Systemansvar A/S. in Denmark needs services related to the procurement of energy in the intraday market for a duration of 8 years, with an estimated total value of 10,000,000 EUR. The services include receiving countertrade volumes, netting countertrade requests, procuring energy on the intraday market, data logging and reporting, secure operation, REMIT compliant setup, 24/7/365 backup support, and confirmation of traded and netted energy. The award criteria are Quality of the Trading Service (55%), Price (30%), Implementation and Delivery (10%), and IT-security (5%). Qualification requirements include an equity of at least 1.25 million EUR and an equity ratio of at least 20% from the latest annual report, and prior experience with procurement of energy on a power exchange, documented by up to 2 relevant references from the past 3 years.

      Competition with qualificationAug 20, 2026
      Sep 22, 2026(1 day)
      €10,000,000
    • Metroselskabet I/S

      Jernbane- og infrastrukturbygging

      Copenhagen - New Metroline, M5 Civil Works South

      Metroselskabet I/S needs civil works for the M5 Metroline South package in Copenhagen, Denmark, over a period of 9 years. This design & build contract, under ABT18 terms, involves the construction of approximately 6.5 km of twin bored TBM tunnels, 5 underground stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, and short embankment sections. The M5 line is a fully automated driverless metro system designed to enhance passenger service and extend connectivity to emerging urban development areas. The contract will be awarded based on Price (50%) and Quality (50%), with Quality sub-criteria including Technical solution and planning (16%), Management and collaboration (16%), Organization and key personnel (10%), and Carbon (8%). To qualify, applicants must have completed one project demonstrating experience with design, construction, and project management of an underground metro project in the EEA and/or the UK, and one project demonstrating experience with design, construction, and project management of an above-ground metro project in the EEA and/or the UK, both within the last 15 years. Additionally, applicants must have an equity of no less than EUR 100,000,000.00 and a total annual turnover of at least EUR 1,700,000,000.00 in each of the last three completed financial years.

      Competition with qualificationSep 10, 2026
      Oct 13, 2026(22 days)
    • Energinet Eltransmission A/S

      Veg- og baneinfrastruktur

      HDD Landfall Bornholm -25/18035

      Energinet Eltransmission A/S har brug for op til 8 HDD-boringer fra ca. 250 meter inde i landet fra kystlinjen på Bornholm og ud til havet, inklusive klargøring af område og adgangsveje, konstruktion af HDD'er (inklusive onshore og offshore spreads), forsegling og retablering. Kontrakten løber i 3 år. Tildelingskriterierne er pris (40%), teknisk og organisatorisk løsning (40%), tidsplan (10%) og kontraktvilkår (10%). Kvalifikationskrav inkluderer en egenkapital på mindst 2.000.000 EUR og en egenkapitalandel på mindst 20% (eller 15-20% hvis egenkapitalen overstiger 6.000.000 EUR), samt en omsætning på mindst 10.000.000 EUR fra seneste årsrapport. Derudover kræves mindst én reference med HDD landfall-boring udført inden for de seneste 7 år med en kontraktværdi på mindst 5.000.000 EUR.

      Competition with qualificationSep 9, 2026
      Oct 6, 2026(15 days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Framework agreement - Purchase of fittings for glass insulator strings - 26/17723

      Energinet Eltransmission A/S har brug for at indkøbe komplette glasisolatorstrenge gennem en rammeaftale med en varighed på 4 år, som kan forlænges to gange med hver 2 år, hvilket giver en potentiel samlet varighed på 8 år. Den forventede samlede værdi af rammeaftalen er 6.700.000 EUR, men den maksimale totalværdi kan være op til 16.050.000 EUR. Aftalen er opdelt i to delaftaler: Lot 1 for komplette glasisolatorstrenge til luftledninger (forventet forbrug 6.150.000 EUR) og Lot 2 for komplette glasisolatorstrenge til transformerstationer (forventet forbrug 535.000 EUR). Tilbud evalueres ud fra pris (30%), løsningsbeskrivelse (50%) og leveringstid (20%). Som kvalifikationskrav skal ansøgere for Lot 1 have en egenkapital på mindst 1.470.000 EUR og en egenkapitalprocent på mindst 20%, eller en egenkapitalprocent mellem 15% og 20% hvis egenkapitalen overstiger 4.400.000 EUR. For begge lots kræves 3-5 referencer fra de seneste 5 år for leverancer af isolatorstrenge til transmissionssystemer med spændingsniveauer fra 132 kV til 450 kV, samt producentens anvisninger for håndtering, opbevaring og sikkerhedsudstyr.

      Framework agreement with qualificationSep 4, 2026
      Sep 25, 2026(4 days)
      €16,050,000
    • Nordværk Affaldsenergi A/S

      Anleggsmaskiner og utstyr

      Procurement procedure for a new Fly Ash Separation System to Waste-to-Energy Plant in Hjørring

      Nordværk Affaldsenergi A/S søger en leverandør til design, fremstilling, levering, opførelse, idriftsættelse, test og overtagelse af et nyt flyveaskeseparationssystem til deres affaldsenergianlæg i Hjørring, Nordjylland. Kontrakten er nødvendig for at opfylde miljøtilladelsen og omfatter også ansvar i garantiperioden. Udbuddet gennemføres som en udbud med forhandling i flere faser, hvor prisen vægtes 40 % og kvaliteten 60 %. Kvalitetskriterierne omfatter den tekniske løsnings egnethed, robusthed, energieffektivitet og brugervenlighed. Virksomheder skal have positiv egenkapital i de seneste to regnskabsår, en soliditetsgrad på mindst 10 % i mindst to af de seneste tre regnskabsår og fremlægge minimum to og maksimum fem relevante referencer fra lignende opgaver udført inden for de seneste tre år.

      Competition with qualificationAug 25, 2026
      Oct 1, 2026(10 days)