Search
  • Search


Denmark: Tenders/Energistyrelsen/North Sea I, South, Offshore Wind Farm
  1. Competition notice published

    Nov 20, 2025 10:07 AMNovember 20, 2025 10:07 AM
  2. Questions deadline

    Oct 2, 2028 9:55 PMOctober 2, 2028 9:55 PM
  3. Tender submission deadline

    Oct 23, 2028 12:00 PMOctober 23, 2028 12:00 PM
  4. Opening date

    Oct 23, 2028 12:05 PMOctober 23, 2028 12:05 PM
  5. Tender validity period

    Jun 23, 2029 12:00 PMJune 23, 2029 12:00 PM

Brief

North Sea I, South, Offshore Wind Farm

Deadline
Oct 23, 2028Questions by Oct 2, 2028
Award
Price only
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
DKK 6.6Bover 40 years

Brief

Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

Elektrisk utstyr og belysning

Register interest in EU Supply

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    The Tenderer must fulfil the following minimum requirement in order to demonstrate the ability to perform the Concession Agreement: 1. At least one (1) reference covering a largescale offshore project in relation to energy production, completed within the last ten (10) years. A largescale offshore project in relation to energy production must, as a minimum, have the following characteristics in order to be considered: a. Construction costs (CAPEX) of minimum DKK 500,000,000, b. be fixed to the seabed, at least at 10 meters sea depth in average across the site, and c. have a duration of contract, permit, licence, approval or the like of min. 25 years. The reference must show experience with at least three (3) of the six (6) following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation, or 6) quality control. The Tenderer may document experience with the above in a minimum of three (3) key areas via one (1) or more references, provided that each reference covers a largescale offshore project in relation to energy production. Only references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be accepted. As regard the assessment of whether a largescale offshore project is completed within the latest ten (10) years, the DEA will accept the following examples (which are not exhaustive): • An offshore wind farm with an A/C substation where the last turbine has delivered the first kWh to the grid (fully commissioned offshore wind farm). • An offshore oil- and gas development project including installation of fixed installations and commissioning and subsequent production/operation.

    Documentation Requirement

    Information regarding the references should be specified in part IV, section C of the ESPD. If the Tenderer prefers to submit the list of references as a separate document, this is accepted as well. However, illustrations, photographs etc. will not be taken into account. Re (1) For each project used as a reference (at least one (1), maximum five (5) references), the Tenderer must provide the following description: a. Name of largescale offshore project b. Description of main elements of the largescale offshore project including where relevant grid connection (AC-substation, etc.) from the offshore project to onshore/offshore point of connection; c. Contact person at the contracting entity and/or the authority who awards the permit/licence/approval or the like (preferably including phone number and email address); d. Contract signing date or the date of issuing the permit/licence/approval etc. (with the minimum duration of 25 years); e. Location of the largescale offshore project; f. The Tenderer's/the supporting entity’s role (i.e. developer, owner, main consultant, sub-contractor, financial investor, or other); g. The Tenderer's/the supporting entity’s contribution to the project within the following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation and/or 6) quality control; h. Time of completion of the project (within the last 10 years). If more than a total of five (5) references completed within the latest ten (10) years before the expiry of the deadline for submission of tender are submitted by a Tenderer, including where a Tenderer is a group of economic entities, e.g. a consortium or joint venture, only the five (5) newest references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be considered. If it is not possible to identify the five (5) newest references, the five (5) newest references will be selected by drawing of lots of the references submitted by the remaining entities in the group of Tenderers or from the supporting entities which has been completed within the latest ten (10) years before the expiry of the deadline for submission of tender. Upon request, the Tenderer to whom the DEA intends to award the Concession Agreement must submit documentation regarding the information stated in the ESPD, cf. section 151 of the Danish Public Procurement Act. The list of references, that the Tenderer specifies in the ESPD will constitute the final documentation for the Tenderer's information about the technical and professional capacity. Reference is further made to the Procurement Specifications, section 11.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Award of the Concession Agreement to the most economically advantageous tender will take place on the basis of the award criterion, “price”. The award criterion, “price”, will be assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price must constitute a price per unit of electricity in “DKK”/MWh excl. VAT, which the Tenderer will be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer will constitute the so-called “strike price” under the Concession agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area).

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Energistyrelsen

From the notice

  • The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, South, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, South Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 6.6 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. Reference is made to the Annex F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference) for an overall description of the principles in capability-based two-way CfD scheme. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). Please note that the name of the offshore wind farm can be changed by the Danish Energy Agency (“DEA”). Such change will not affect the geographical location of the offshore wind farm. The North Sea I, South will in the following be called “the Offshore Wind Farm”. The minimum capacity of the Offshore Wind Farm shall be established no later 31 December 2034. The concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the concessionaire. The Concession Agreement further enables the Concessionaire to establish overplanting capacity in excess of the required minimum capacity within the concession area, i.e. it is optional for Concessionaire to establish more than 1 GW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include but is not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit and/or procurement material. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance" as well as in the procurement material Appendix 2 (Location of the Concession Area). Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specification), and the procurement material as a whole.

  • Contact

    Camilla Juel Irmarkowfprocurement@ens.dk
  • Type
    Competition
  • Location
    Vestjylland
  • Main code
    Construction work
    45000000
  • 31121320Wind turbines31121330Wind turbine generators31121340Wind farm31160000Parts of electric motors, generators and transformers31170000Transformers31213400Distribution system31300000Insulated wire and cable45244000Marine construction works45244100Marine installations

Similar active competitions

  • Energinet Eltransmission A/S

    Bygningsarbeid og installasjoner

    Entreprisekontrakt om udførelse af bygge-og anlægsarbejder på Station Lyngerup og Station Ølstykkegaard -25/12717 - 23/03693

    Energinet Eltransmission A/S søger en entreprenør til en toårig bygge- og anlægskontrakt i Nordsjælland med en maksimal samlet værdi på 70 millioner DKK. Opgaven omfatter opførelse af 132 kV-stationen Lyngerup med terrænarbejder, fundamenter og AC-bygning samt nedtagning af den eksisterende station, og opførelse af 132 kV-stationen Ølstykkegaard med terrænarbejder, en to-etagers GIS-bygning og to transformerfundamenter. Tilbudsgivere skal byde på begge delaftaler, som tildeles samlet til én leverandør. Udvælgelsen omfatter højst fem referencer fra de seneste fem år, herunder mindst én reference fra arbejde på en 132/150 kV-højspændingsstation i drift. Tilbuddet vurderes på pris (60 %), CV’er og projektorganisation (30 %) samt tidsplan (10 %); der kræves detaljerede CV’er for nøglemedarbejdere og en realistisk, robust plan for udførelsen af begge projekter sideløbende.

    Competition with qualification
    Dec 3, 2026(15 days)
    DKK 70,000,000
  • Næstved Kommune

    Oppføring av bygninger

    Ny daginstitution Næstved Nord – totalentreprise

    Næstved Kommune søger et totalentrepriseteam til projektering og opførelse af en ny daginstitution i Næstved Nord med tilhørende udearealer. Kontrakten har en maksimal samlet værdi på 57 mio. DKK og en varighed på 37 måneder. Opgaven omfatter bygge- og anlægsarbejder samt arkitekt-, landskabsarkitekt- og ingeniørrådgivning, herunder certificering af statik og brand, idriftsættelse, pleje af beplantning og 1-årsgennemgang. Institutionen skal rumme 10 grupperum og udformes med natur, kreativitet og fantasi som bærende elementer; byggeriet skal Svanemærkes. Udbuddet gennemføres med prækvalifikation og efterfølgende forhandling, men kommunen kan tildele på baggrund af de indledende tilbud. Tildelingen vægter pris 25 %, arkitektur, funktion, kvalitet og bæredygtighed 60 % samt organisation og nøglepersoner 15 %. Udvælgelsen kan omfatte op til fire ansøgere. Der kræves mindst én reference fra et afsluttet offentligt byggeprojekt udført i totalentreprise inden for de seneste fem år samt mindst én reference fra projektering af en daginstitution, hvor tilbudsteamets arkitektvirksomhed havde en væsentlig rolle; der kan indsendes op til syv referencer.

    Competition with qualification
    Dec 17, 2026(29 days)
    DKK 57,000,000
  • A/S Storebælt

    Asfalt og veioverflater

    Udbud af Hovedentrepriseaftale for Opgradering af havne

    A/S Storebælt skal bruge en hovedentreprenør til at opgradere Halsskov Havn og Knudshoved Havn i Vest- og Sydsjælland samt på Fyn, så der kan indsættes færger mellem havnene efter en mobiliseringsperiode på fire uger; kontrakten løber i 18 måneder, og der er ikke oplyst en kontraktværdi. Arbejdet omfatter etablering af arbejdsplads og adgangsforhold, uddybning af havnebassiner, opfyldning og fundering af nye kajanlæg med spuns, pæle og ankre, nye stenkastninger, reparation af en eksisterende mole, et opmarchområde samt nedrivning af eksisterende anlæg. Udbuddet gennemføres som en forhandlet procedure, hvor tilbudsgiverne kan blive bedt om at afgive flere indledende tilbud, inden deres bedste og endelige tilbud vurderes. Kvalifikationskrav omfatter mindst 600 mio. kr. i årlig omsætning og mindst 125 mio. kr. i egenkapital i hvert af de tre seneste disponible regnskabsår samt dokumentation gennem referencer for erfaring med nedbringning af spuns i hård moræneler, spunsarbejde fra pram eller anden metode i vand, spunsjern over 20 meter og udgravning fra pram eller anden metode i vand. Tilbuddene vurderes på pris (40 %), organisation og CV’er for nøglepersoner (20 %) samt opgaveløsning (40 %).

    Competition with qualification
    Nov 26, 2026(8 days)