Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_1 concrete lot
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Oct 30, 2022Expired
- Procedure
- With negotiationTwo stages
- Agreement
- Construction work
Brief
Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_1 concrete Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces
Building and Construction - Erection and Construction of Buildings
Result
- 0Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ørsted Wind Power A/S
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_1 concrete Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces
Contact
Christian Dreyerchrdh@orsted.com- Result · PrequalificationType
- 45000000Main codeConstruction work
- 45223000Structures construction work45223800Assembly and erection of prefabricated structures45223810Prefabricated constructions45223820Prefabricated units and components45262310Reinforced-concrete work45262423Deck-fabrication work45262424Offshore-module fabrication work