Search
  • Search


Ireland: Tenders/Meath County Council/Meath Co Co- MH-TRA-25-09 - Single-Party Framework Agreement for the construction and delivery of Meath County Council Chamber and Offices (Buvinda House) and associated projects/works.
  1. Competition notice published

    Apr 17, 2025 9:26 AMApril 17, 2025 9:26 AM
  2. Qualification deadline

    Not stated
  3. Tender submission deadline

    May 26, 2025 11:00 AMMay 26, 2025 11:00 AM

Brief

Meath Co Co- MH-TRA-25-09 - Single-Party Framework Agreement for the construction and delivery of Meath County Council Chamber and Offices (Buvinda House) and associated projects/works.

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
May 26, 2025Expired
Procedure
With prequalificationTwo stages
Agreement
Framework agreement
Estimated value
€30M

Brief

Proposed Development / Works: The project comprises the proposed extension and alterations to the northern side of the existing Buvinda House office building, consisting of a new Council Chamber, Councillors’ areas, and office workspaces over three floors (3220 m2), including meeting rooms and support spaces, along with new links, associated landscaping, site drainage, services, and related site development works. The project aims to be an ambitious exemplar in its materiality and environmental consideration. A climate-responsive design approach has been adopted to create a healthy building that utilizes Passive Design strategies to reduce both embodied carbon and energy demands, aiming to exceed NZEB requirements. Reflecting the materiality of the Buvinda House fit-out (completed in 2017) the new extension will establish a material resonance between the existing and new structures. Timber will serve as the primary structure throughout. Glulam columns and beams, along with CLT floors, will be exposed to the interior, reducing embodied carbon, improving air quality, and minimising the required foundation size. Low embodied-carbon materials, such as terracotta tiles, natural fiber-based insulations, timber-framed glazing, and charred timber cladding, will further reduce the project’s carbon footprint. The extension will strengthen the civic presence of Meath County Council by positioning the new Council Chamber in a prominent location north of the existing building. The double-height Chamber will address a new public entrance and landscaped forecourt, establishing a democratic space of civic scale and importance for the Council. Office areas will be distributed in an open-plan layout through the three storeys, supported by dedicated storage and breakout spaces. The building will integrate carefully with the existing Buvinda House through link and bridge connections at the east and west ends of the structure. This will be a universally accessible environment for MCC staff, optimising connectivity to foster collaboration between departments. A raised west-facing bridge will accommodate office breakout spaces, offering views over the River Boyne.

Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Meath County Council

From the notice

  • Proposed Development / Works: The project comprises the proposed extension and alterations to the northern side of the existing Buvinda House office building, consisting of a new Council Chamber, Councillors’ areas, and office workspaces over three floors (3220 m2), including meeting rooms and support spaces, along with new links, associated landscaping, site drainage, services, and related site development works. The project aims to be an ambitious exemplar in its materiality and environmental consideration. A climate-responsive design approach has been adopted to create a healthy building that utilizes Passive Design strategies to reduce both embodied carbon and energy demands, aiming to exceed NZEB requirements. Reflecting the materiality of the Buvinda House fit-out (completed in 2017) the new extension will establish a material resonance between the existing and new structures. Timber will serve as the primary structure throughout. Glulam columns and beams, along with CLT floors, will be exposed to the interior, reducing embodied carbon, improving air quality, and minimising the required foundation size. Low embodied-carbon materials, such as terracotta tiles, natural fiber-based insulations, timber-framed glazing, and charred timber cladding, will further reduce the project’s carbon footprint. The extension will strengthen the civic presence of Meath County Council by positioning the new Council Chamber in a prominent location north of the existing building. The double-height Chamber will address a new public entrance and landscaped forecourt, establishing a democratic space of civic scale and importance for the Council. Office areas will be distributed in an open-plan layout through the three storeys, supported by dedicated storage and breakout spaces. The building will integrate carefully with the existing Buvinda House through link and bridge connections at the east and west ends of the structure. This will be a universally accessible environment for MCC staff, optimising connectivity to foster collaboration between departments. A raised west-facing bridge will accommodate office breakout spaces, offering views over the River Boyne.

  • Contact

    procurement@meathcoco.ie
  • Type
    Competition · Framework agreement · Prequalification
  • Main code
    Building construction work
    45210000

Similar active competitions

  • Meath County Council

    Arkitekttjenester

    Meath Co Co - MH-PLA-26-07 - Establishment of a Single Party Framework for the Provision of Consultancy Services

    Meath County Council seeks consultancy services through a single-party framework covering two lots: planning for the New Urban Centre at Navan Central and the Meath 2050 vision for the county’s future growth. The framework will run for 4 years, with a maximum total value of €1 million, and services will be delivered in the Mid-East region of Ireland. The council intends to appoint one supplier to both lots to ensure continuity and coordination; tenders will be assessed lot by lot, with the final selection based on the combined requirements of both lots.

    Framework agreement
    Dec 10, 2026(21 days)
    €1,000,000
  • Coillte CGA

    Rådgivende ingeniørtjenester for bygg og anlegg

    Single Party Framework for the Provision of LOT 1 – Project Management Services LOT 2 – Quantity Surveying Services, for the delivery of both Minor and Major Works Projects.

    Coillte CGA needs two separate single-party framework agreements for end-to-end project management and quantity surveying services, each lasting 5 years, with a combined maximum total value of €8 million. The services will support minor and major works in Dublin, from individual reactive or planned works to larger, more complex projects, covering activities such as identifying, assessing, prioritising, scoping, commissioning, coordinating and delivering works. They must provide a flexible, appropriately scaled approach that takes account of programme, resources, statutory obligations, health and safety, quality, value for money, and procurement and governance requirements.

    Framework agreement with qualification
    Nov 24, 2026(5 days)
    €8,000,000
  • Health Service Executive (HSE)

    Arkitekttjenester

    Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW04: Acute Healthcare Capital Works – project value €15M - €60M excl. VAT for Dublin North, Swords Office

    The Health Service Executive (HSE) seeks design team services through a four-year, multi-party framework for acute healthcare capital projects valued at €15 million–€60 million excluding VAT in the Dublin North area, administered by its Swords office. The initial indicative project is a new Adult Inpatient Unit at Connolly Hospital, Blanchardstown. The framework has a maximum total estimated value of €600 million and is divided into nine lots: architect (including planning and BIM information management), quantity surveyor, building services engineer, civil/structural engineer, fire safety consultant, Project Supervisor Design Process, Employer’s Representative, Energy Efficient Design Facilitator and Assigned Certifier. The procurement uses a restricted procedure, with expressions of interest invited from suitably qualified providers.

    Framework agreement with qualification
    Dec 3, 2026(14 days)
    €600,000,000