Medium Voltage Switchgear and Busbar
Cancelled
The competition has been cancelled.
- Qualification deadline
- Jun 25, 2025Expired
- Procedure
- With negotiationTwo stages
- Agreement
- Buying goods
Brief
Helen Oy har inngått en avtale med Siemens Osakeyhtiö om levering av mellomspenningsbrytere og samleskinner til to produksjonssteder i Helsinki-området, Finland, for å øke kapasiteten for ikke-forbrenningsbasert fjernvarmeproduksjon. Avtalen har en total verdi på 2 766 600 euro. Leveransen omfatter 10kV brytere og samleskinner for Hanasaari produksjonssted (ca. 220 MW kapasitet) og Patola produksjonssted (ca. 140 MW kapasitet).
Elektrisk utstyr og belysning
Result
- Reason for cancellationAnnet
- 2Number of bids
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Helen Oy
From the notice
Helen Ltd ("The Client" or "The Contracting unit") aims to be carbon neutral energy company by 2030. In order to achieve its carbon neutrality targets, Helen is currently seeking to increase non-combustion-based energy solutions for its energy production. In this procurement The Contracting unit seeked 1-2 suppliers for medium voltage switchgear and busbar, preliminary to two different production locations in Helsinki area, Finland, as described in this EU Procurement Notification and its Annexes. The main driver for electrode boiler investments is to increase the capacity of non-fossil-based district heat production. The Contracting unit will make a separate project execution decision for both projects, Hanasaari (A1), and Patola (A2). The procurement consists of 2 parts, which may be quoted as follows: ALTERNATIVE A (parts quoted separately): A1. 10kV switchgears and busbars for Hanasaari production site for approximately 220 MW capacity A2. 10kV switchgears and busbars for Patola production site for approximately 140 MW capacity ALTERNATIVE B (combination of parts mentioned in the alternative A): Alternative B allows Tenderer to take synergy advantages into consideration and give more competitive pricing for bigger entity i.e., both projects. The Candidate could send the application to tender for part A1 and part A2. The Candidate could send the application for Alternative B but must have then applied and tendered for same parts separately (Alternative A) as well. The Supplier or Suppliers were be chosen based on the final evaluation. The economically most advantageous quotation or combination of the quotations was be chosen.Main features of the procedureThe procurement procedure was a negotiated procedure as defined in the Finnish Act on Public Contracts and Concessions of entities operating in the water, energy, transport and postal services sectors (1398/2016).
Contact
Hanna-Mari Harjuhanna-mari.harju@hankintajuristit.fi- Result · PrequalificationType
- Helsinki-UusimaaLocation
- 31200000Main codeElectricity distribution and control apparatus