Search

  • Search


    MOST FOOTBRIDGE: New connection of the city, landscape and the lake

    Statutární město Most

    MOST FOOTBRIDGE: New connection of the city, landscape and the lake

    1. Competition notice published

      Apr 10, 5:06 AMApril 10, 2026 5:06 AM
    2. Questions deadline

      Jul 6, 9:59 PMJuly 6, 2026 9:59 PM
    3. Tender submission deadline

      Jul 23, 12:00 PMJuly 23, 2026 12:00 PM

    Brief

    Czechia: Tenders/Statutární město Most/MOST FOOTBRIDGE: New connection of the city, landscape and the lake

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Arkitekttjenester

    The city of Most needs architectural and landscape design services for a new pedestrian and cycle bridge connecting the city center with Lake Most, including the revitalization of the Museum Park. The project aims to create a new urban axis and a significant architectural landmark, with proposals for surrounding public spaces, including a new Museum Park and landscape connections to Lake Most. The competition seeks a single multidisciplinary team to design both the footbridge and the park, though the jury may select two separate winners, leading to two separate negotiated procedures for the footbridge and the park. The selected design will proceed to a negotiated procedure for the award of a contract to complete all subsequent stages of project documentation and designer's supervision.

    About the bid

      The subject of the competition is a design for a new pedestrian and cycle bridge that will overcome the historically formed barrier between the town of Most and the new landscape of Lake Most, created by the convergence of road infrastructure, railway and tram lines, and the modified riverbed of the Bílina river. The aim is not only to physically connect the two parts of the city, but also to symbolically and mentally reunite them. The footbridge is set to become a key element of a new urban axis connecting the city centre, the museum, the recreational area around the lake and the site near the relocated Church of the Assumption of the Virgin Mary; at the same time, it will become a significant architectural landmark and a new gateway to the city when approaching from Litvínov. The competition brief also includes a proposal for the surrounding public spaces in front of the footbridge. On the town side, a new Museum Park is to be created – a dignified forecourt for the museum which, in synergy with cultural institutions and memorial sites, will form a high-quality urban space with significant landscape, recreational and social value. On the lake side, competition entries are to propose a landscape connection and pedestrian and cycle links between the footbridge and Lake Most, and to design a clear and attractive entry point to this area. The site is divided into sections. The subject of the subsequent tender is the complete project documentation of the footbridge itself, including the approach areas, and the new Museum Park. At a conceptual level, the competition entries should explore the possibility of creating a wider linear park connecting the Museum and also the State District Archives, as well as a concept for a landscape connection towards Lake Most. The aim is to create a coherent, clear and long-term sustainable framework for the gradual transformation of this key area. The aim of the competition is to treat the site as a single entity and to select a single multidisciplinary team to design both the footbridge and the park. However, where justified, the jury may decide to select two separate winners, which may lead to two subsequent separate Negotiated procedures without prior publication (JRBU) for the footbridge and the park.Main features of the procedureThe City of Most has announced a single-phase, open, anonymous architectural and landscape design competition in accordance with Act No. 134/2016 Coll. The objective is to select a design for a new pedestrian and cycle bridge connecting the city centre with Lake Most, including the revitalization of the Museum Park. The competition will be followed by a negotiated procedure without prior publication (JŘBU) with the winner(s) for the award of a contract to complete all subsequent stages of project documentation and designer’s supervision.

      Contact name
      Public procurement department
      Contact phone
      +420477001358
      Contact email
      katerina.kolaci@mesto-most.cz
      Address
      Radniční 1, 43401 Most

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Statutární město Most
    Title
    MOST FOOTBRIDGE: New connection of the city, landscape and the lake
    Type
    CompetitionPrequalification
    Main code
    71240000Architectural, engineering and planning services
    Supplemental codes

    No supplemental codes from buyer…

    Location
    Ústecký kraj