Ireland: Tenders/Donegal County Council_1193/Muckish Railway Walk - Phase 3
  1. Supplier selection

    Jul 30, 12:00 AMJuly 30, 2026 12:00 AM
  2. Contract signed

    Jul 31, 12:00 AMJuly 31, 2026 12:00 AM
  3. Result notice published

    Aug 28, 8:22 AMAugust 28, 2026 8:22 AM

Brief

Muckish Railway Walk - Phase 3

Awarded

The competition has ended and a winner has been selected.

Award
Quality 30%
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€0over 6 months

Brief

Donegal County Council has entered into an agreement with W Doherty Construction Ltd for works on Phase 3 of the Muckish Railway Walk, which includes replacing a bridge structure, providing two small car parks, extensive drainage improvements, new surfacing, safety fencing, access controls, information panels, seating, cycle stands, and all ancillary works. The project is located in the Border region of Ireland, has a duration of 6 months, and a final contract value of 689,638 EUR. The award criteria were 70% price and 30% quality, and 13 bids were received.

Veibygging og asfaltarbeid

Result

TED
  • W Doherty Construction Ltd
    Winner
  • Number of tenders received
    13
  • Contract value
    €689,638

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    70

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    30

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Donegal County Council_1193

From the notice

  • Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings

  • Contact

    procurement@donegalcoco.ie
  • Type
    Result
  • Location
    Border
  • Main code
    Works for complete or part construction and civil engineering work
    45200000
  • 14213200Tarmac45111240Ground-drainage work45213312Car park building construction work45213316Installation works of walkways45220000Engineering works and construction works45221110Bridge construction work45233162Cycle path construction work

Similar active competitions

  • Údarás Na Gaeltachta_289

    Anleggs- og infrastrukturbygging

    Bealach Seanadh Mhach- Phase 2

    Údarás na Gaeltachta needs construction works for Phase 2 of the Bealach Seanadh Mhach Trails Project in Ireland’s Mid-West, with a maximum total contract value of €450,000 and a duration of 1 year. The project comprises approximately 325 metres of recycled-plastic boardwalk, 140 metres of geogrid walkway and three bridge crossings, together with associated civil engineering, structural and ancillary works.

    Competition
    Dec 9, 2026(20 days)
    €450,000
  • Donegal County Council_1193

    Riverine Community Park Project

    Donegal County Council_1193 is planning the procurement of works for the Riverine Community Park Project, which includes the construction of new community park infrastructure, multi-purpose facilities, and a 120m span cycle and pedestrian bridge across the River Foyle. The project requires a contractor to provide design/consultancy services within their team, specifically a Bridge Designer, Archaeologist, and Ecology consultant. McAdam Design Ltd currently holds a contract for Integrated Consultancy Team Services for the Riverine Community Park.

    Planning
    Nov 20, 2026(1 day)
    €12,000,000
  • Ballybofey and Stranorlar Integrated Community Company

    Arkitekttjenester

    Lifford- Stranorlar Community Trails Plan

    Ballybofey and Stranorlar Integrated Community Company seeks a suitably qualified and experienced consultant to develop and deliver a Community Trails Plan for the Lifford-Stranorlar Municipal District in County Donegal, Ireland. The services are expected to run for 6 months, with a maximum total contract value of €24,500.

    Competition
    Nov 24, 2026(5 days)
    €24,500