National road 555 Nygårdstunnelen - upgrading of tunnels
Elektroinstallasjon i bygninger
Statens vegvesen needs works for the upgrading of Nygårdstunnelen in Bergen, Vestland, over 21 months. The project involves replacing and upgrading equipment in and outside the tunnel to meet current safety regulations, including a new ventilation system, lighting installations, extinguishing water, emission and tunnel washing water handling system, signage, emergency stations, cameras, a new technical building, and a new stop section, as well as the demolition of the existing air treatment plant. Award criteria include Tender Sum, Organisation and offered key personnel, and Implementation of the assignment. Qualification requirements include having equity of minimum 50 million NOK, an equity ratio of at least 10%, and an average annual turnover of minimum 120 million NOK in the last three financial years. Suppliers must also provide a list of 5 to 18 relevant contracts executed in the last five years, and be certified in accordance with ISO 14001 (2015) and ISO 9001 (2015).
Om anbudet
- Kontakt navn
- Stine Henstein
- Kontakt telefon
- +47 22073000
- Kontakt e-post
- firmapost@vegvesen.no
- Adresse
- Skoggata 19, 1500 Moss
Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at Nygårdstangen. The annual daily traffic is approx. 45,000. The tunnel shall be upgraded in accordance with the tunnel safety regulations and equipment in and outside the tunnel shall be replaced and replaced with new equipment that meets the current requirements. This includes, among other things: • New ventilation system. • New lighting installations with both new lights in the tunnel roof and continuous evacuation lights. • Extinguishing water shall be set up for the fire brigade. New system for handling emissions and tunnel washing water that fulfils emission requirements. • New signage with barriers, lane signal and variable signs. • Emergency stations with fire extinguishers and telephones. • Camera with coverage throughout the entire tunnel, which gives an alarm during events. • New technical building in the tunnel in the existing mountain room. • A new stop section shall be established at the technical building. • Demolition of existing air treatment plant.
Egne vurderingskriterier
Start gratis prøveperiode for å stille egne spørsmål om anbudet og få KI-genererte svar.
Tildelingskriterier
Beskrivelse
K1: Tender Sum
Beskrivelse
K2 Organisation and offered key personnel.
Beskrivelse
K3 Implementation of the assignment
Beskrivelse
See the exception justifications attached to the tender documentation.
Kvalifikasjonskrav
Beskrivelse
The contractor shall be a legally established company or consist of a community of contractors who are legally established companies. The requirement also applies to entities that the contractor will use, cf. point 4.1 below. The contractor shall not be a unit affected by the ban in the sanctions regulations of Ukraine § 8n, nor should it rely on entities in violation of § 8n.
Dokumentasjonskrav
1. Certificate from the Register of Business Enterprises or an equivalent certificate of statutory registration in the country where the contractor or the entities that will jointly constitute the contractor, cf. B2 point 4.2, has been established, as well as an equivalent certificate for all entities that the contractor will use to be qualified, cf. B2 point 4.1. 2. Completed table in chapter E1 point 3.2, possibly completed points 3.3 and 3.4. 3. A completed self-declaration on the relation to applicable sanctions law, cf. E1 point 3.6. 4. Upon request from the builder, the contractor shall document who are real right holders in the contractor, companies in the contractor's group or companies that the contractor has controlling ownership or authority in, companies that the contractor will use, contractors and any other in the supplier chain, as well as information on who is the general manager, chairman and other senior employees at the contractor.
Beskrivelse
Tenderers shall have equity of minimum NOK 50 million.
Dokumentasjonskrav
1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers. 2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. The account shall also include any events of significance that occurred after the last revised annual accounts. 3. An overview of any recently executed, ongoing or pending tax or public reviews of the contractor's activities. 4. Completed table in chapter E1 point 4. If the contractor has a justifiable reason for not submitting the documentation that the builder has demanded, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy and which the builder deems suitable. The contractor shall justify why he cannot present the documentation the builder has demanded.
Beskrivelse
Tenderers shall have an equity ratio of at least 10%.
Dokumentasjonskrav
1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers. 2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. The account shall also include any events of significance that occurred after the last revised annual accounts. 3. An overview of any recently executed, ongoing or pending tax or public reviews of the contractor's activities. 4. Completed table in chapter E1 point 4. If the contractor has a justifiable reason for not submitting the documentation that the builder has demanded, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy and which the builder deems suitable. The contractor shall justify why he cannot present the documentation the builder has demanded.
Beskrivelse
Tenderers shall have an average annual turnover of minimum NOK 120 million in the last three financial years.
Dokumentasjonskrav
1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers. 2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. The account shall also include any events of significance that occurred after the last revised annual accounts. 3. An overview of any recently executed, ongoing or pending tax or public reviews of the contractor's activities. 4. Completed table in chapter E1 point 4. If the contractor has a justifiable reason for not submitting the documentation that the builder has demanded, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy and which the builder deems suitable. The contractor shall justify why he cannot present the documentation the builder has demanded.
Beskrivelse
Tenderers shall have sufficient experience with management and execution of road projects of a relevant nature and degree of difficulty. The contractor shall, in addition, have sufficient experience of a relevant nature and degree of difficulty from the following central works: 1. Electric power in road tunnel 2. EKOM and Automation in road tunnels. 3. Water and frost protection in the road tunnel. 4. Blasting work in road tunnels. 5. Demolition of concrete constructions 6. Assembly of prefabricated concrete elements 7. Form work and concrete work 8. Ground works 9. Work notification and securing of road work. The contractor shall have experience from the execution of the central works as mentioned above. If the contractor only has experience from, for example, managing contract helpers, the contractor must rely on other entities that have the necessary experience from the execution of the relevant central works, see B2 point 4.1.
Dokumentasjonskrav
1. A list of up to 18 and not less than 5 contracts that the contractor has carried out or execute during the last five years calculated from the deadline for submitting requests for participation in the competition. The minimum and maximum limit applies to the total number of reference projects, and is the same regardless of whether the tenderer fulfils the qualification requirement alone or relies on others to fulfil the qualification requirement. The listed reference projects shall together document fulfilment of the qualification requirement. The list shall, cf. the form included in chapter E1 point 5.1, contain the following for each of the contracts: • Name of the recipient (contracting authority) • A description of what the contract work was like, including relevance to the qualification requirement. • What work was carried out by the contractor himself and what work was carried out by sub-suppliers. • Date of the delivery. • The contract ́s value. • Reference person/gender neutral preferred at the contracting authority with contact data (telephone number and email address) and a statement of the person in question ́s role at the contracting authority during the contract. The gender neutral preferred may be contacted in order to verify that the information in the form is correct. The contractor will be responsible for ensuring that the reference person is available. 2. Completed form in chapter 2. E1 point 5.1.
Beskrivelse
Tenderers shall be certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Management), or The Eco-Lighthouse Scheme, with relevance to equivalent transport projects.
Dokumentasjonskrav
1. Certificate issued by an independent body that documents that the contractor is certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Managment) or The Environmental Lighthouse Scheme. The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries. 2. Other documentation for equivalent environmental management measures will be accepted if the contractor is unable to obtain such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to the requested environment systems or standards. The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.
Beskrivelse
The contractor shall be certified in accordance with ISO 9001 (2015), of relevance for equivalent transport projects.
Dokumentasjonskrav
1. Certificate issued by an independent body that documents that the tenderer is certified in accordance with ISO 9001 (2015). The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries. 2. Other documentation for equivalent quality assurance measures will be accepted if the contractor is unable to get such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to ISO 9001 (2015). The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.
Tidligere kontraktsvinnere
Start gratis prøveperiode for å se hvem som har vunnet lignende anbud hos denne oppdragsgiveren.
Se hele utlysningen
- Innkjøper
- Statens vegvesen
- Tittel
- National road 555 Nygårdstunnelen - upgrading of tunnels
- Type
- Hovedkode
- Tilleggskoder
- Lokasjon
- Vestland
- Varighet
- 21 måneder