Search

  • Search


    New Heating Buildings

    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    New Heating Buildings

    1. Planning notice published

      Feb 6, 1:52 PMFebruary 6, 2026 1:52 PM
    2. Planned competition start

      Mar 27, 12:00 AMMarch 27, 2026 12:00 AM

    Brief

    Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/New Heating Buildings

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') está planificando la adquisición de obras civiles y de acabado, así como obras de infraestructura para los nuevos edificios de agua de refrigeración (B63), ECH (B18), ICH (B20) y los puentes ECH e ICH.

    About the bid

      The scope concerns the civil and finishing works and infrastructure works for the new cooling water building (B63), the new ECH buildings (B18), the new ICH building (B20) and the new ECH and ICH bridges.

      Contact name
      Rodia Tsitsikli
      Contact phone
      +34933201800
      Contact email
      rodia.tsitsikli@f4e.europa.eu
      Address
      C/Josep Pla, 2, Torres Diagonal Litoral, edificio B3, 08019 Barcelona

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
    Title
    New Heating Buildings
    Type
    Planning
    Main code
    45210000Building construction work
    Supplemental codes

    No supplemental codes from buyer…

    Location
    Bouches-du-Rhône

    Active similar competitions

    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Kjøle- og ventilasjonsteknologi

      Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle

      The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') en España necesita el diseño, fabricación, montaje, pruebas de aceptación en fábrica, transporte y entrega de un Sistema de Refrigeración de Helio (HRS) para el Sistema de Separación de Isótopos (ISS) dentro de la Planta de Tritio en ITER, basado en tecnología Reversed Turbo-Brayton. El HRS suministrará una potencia de enfriamiento neta de aproximadamente 1500 W a 18.5 K para el ISS de la Planta de Tritio de ITER. El contrato tiene una duración de 60 meses y un valor máximo total de 9.300.000 EUR. La evaluación de las ofertas se basará en el precio (50%) y la propuesta técnica (50%).

      Competition with qualificationAug 31, 2026
      Oct 9, 2026(0 days)
      €9,300,000
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Laboratorie-, optisk- og presisjonsutstyr

      REMS Procurement and related services (Integrator)

      The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) is planning the procurement of components for the ITER Radiological and Environmental Monitoring System (REMS), including ancillary services like qualification activities and specific engineering support. Suppliers are invited to provide feedback and input to the buyer.

      PlanningSep 28, 2026
      Nov 12, 2026(33 days)
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Elektrisk utstyr og belysning

      Supply of the Injector for IFMIF - DONES

      The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) is planning the procurement of an Injector for IFMIF DONES, which includes its design, manufacturing, delivery, installation, and commissioning. This supply contract is expected to last 80 months.

      PlanningSep 29, 2026
      Nov 13, 2026(34 days)
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Reisebyrå- og turisttjenester

      Provision of Project Management Services

      The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') needs project management services for a framework contract over 4 years, with a maximum total value of 14,000,000 EUR. The services are specifically related to Schedule, Cost and Risk Management, Project Controls or Performance Management and Reporting for Program and Project Teams. Deloitte Consulting SLU has a similar contract today. Offers will be evaluated based on Technical Score (60%) and Financial Score (40%).

      Framework agreementSep 29, 2026
      Oct 13, 2026(3 days)
      €14,000,000
    • Communauté d'Agglomération de Bastia

      Kjøle- og ventilasjonsteknologi

      Marché d'exploitation des installations thermiques, de production ECS, de ventilation, de climatisation et du traitement de l'eau et de l'air des bâtiments communautaires de la CAB

      La Communauté d'Agglomération de Bastia a besoin de services pour l'exploitation des installations thermiques, de production d'ECS, de ventilation, de climatisation et du traitement de l'eau et de l'air des bâtiments communautaires. Ces services, relevant de la catégorie CPV "Réparation et maintenance de systèmes de chauffage central", seront livrés en Haute-Corse.

      CompetitionSep 28, 2026
      Oct 30, 2026(20 days)