NL-Petten: The supply and installation of air handling units, replacing the existing ones in buildings 308 and 309.
Planned
The competition has not been announced yet.
- Deadline
- 2. juliExpired
- Agreement
- Buying goods
- Estimated value
- €700Kover 1 year
Brief
The European Commission, DG JRC - Joint Research Centre is planning the procurement of the supply and installation of new, highly energy-efficient air handling units and associated HVAC infrastructure, including heat recovery systems, to replace existing obsolete units in buildings 308 and 309. The contract also covers the adaptation of the hydraulic system, installation of humidification systems, structural supports, electrical works, and integration with the existing Siemens Building Management System (BMS). The estimated maximum total contract value is 700,000 EUR for a duration of 12 months.
Construction machinery and equipment
Previous winners
Who are you up against?
The suppliers who have won similar contracts at European Commission, DG JRC - Joint Research Centre
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The European Commission's Joint Research Centre (JRC) in Petten intends to replace the existing Air Handling Units (AHUs) and associated HVAC infrastructure located in buildings 308 and 309. The current ventilation systems are obsolete and have reached the end of their operational lifespan. Furthermore, preliminary technical assessments have indicated that the existing air renewal capacity is insufficient to maintain optimal indoor air quality for the occupants. To ensure a healthy, safe, and productive working environment, this procurement aims to upgrade the facilities. The primary objective is to improve indoor air quality, while simultaneously improving the overall energy efficiency of the buildings. The scope of this contract encompasses the supply, installation, and comprehensive commissioning of the new air handling systems and related infrastructure to provide a fully functional delivery. This includes the safe removal and disposal of the existing AHUs, roof support frames, humidification systems, and redundant cabling or piping, ensuring continuous operation of the buildings during the transition. The technical project involves replacing the units with new, highly energy-efficient equipment featuring heat recovery systems. Additionally, the contract covers the complete adaptation of the hydraulic system to operate under a new, lower-temperature regime, the installation of humidification systems, installing structural supports on the roofs, and the execution of all necessary electrical works. Finally, it requires the full integration of the new instrumentation and controls with the existing Siemens Building Management System (BMS), alongside essential auxiliary tasks such as ductwork cleaning.
Contact
jrc-ptt-procurement@ec.europa.eu- PlanningType
- 42500000Main codeCooling and ventilation equipment
- 51100000Installation services of electrical and mechanical equipment