Liikenne- ja viestintävirasto has entered into an agreement with Arctia Meritaito Oy for the delivery of areal hydrographic surveying services, including data processing and deliveries, in the Northern Savonia region of Finland. The services will cover lake basins such as Konnevesi, Pohjois-Konnevesi, Kiesimä, Sonkari, Vesantojärvi, Niinivesi, Pohjois-Niinivesi, Iisvesi, Virmasvesi, Rasvanki, Kuttajärvi, Nilakka and Pielavesi. The contract has a fixed price of 700,000 EUR for work to be carried out in 2026, with an option for additional work in 2027 valued at approximately 300,000 EUR, bringing the total maximum estimated value to 1,000,000 EUR. The hydrographic surveys must be performed using a professional quality MBES system and adhere to FIS-44/2021 Order 1b requirements. Four bids were received for this contract.
Kartlegging og geospatiale tjenester
Result
- Arctia Meritaito OyWinner
- 4Number of bids
- €1,000,000Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Look at the invitation to tender document section "Other information, "Grounds for decision" (Muut tiedot, Päätöksenteon perusteet).
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Liikenne- ja viestintävirasto Traficom
From the notice
The Finnish Transport and Communications Agency Traficom is updating inland nautical charts of lake basins located in Northern Savonia (Konnevesi, Pohjois-Konnevesi, Kiesimä, Sonkari, Vesantojärvi, Niinivesi, Pohjois-Niinivesi, Iisvesi, Virmasvesi, Rasvanki, Kuttajärvi, Nilakka and Pielavesi). Carrying out the update requires procuring comprehensive depth information of the lakes. The purpose of this procurement is to carry out an areal hydrographic surveying including data processing and deliveries in the areas specified in the invitation to tender. The tenderer is asked to give a tender for: 1) Fixed price (French type) -procurement and 2) Option work: daily rate price (12h) of field survey work and respective data processing. NOTE 1: The minimum amount of areas to be offered for an accepted tender is defined in Attachment 9, Quotation Form (minimum bid). NOTE 2: The price for Option work is required to be offered for a tender to be accepted. 1) FIXED PRICE Tenderer is asked to bid surveying areas for the given fixed price. The bidded areas will be given in the Attachment 9, Quotation form. The last bidded area can be given as a percentage of the area, so that the total price of tender equals to the fixed price. Fixed price is 700 000,00 euro (VAT 0%). All the field survey work of bidded areas must be carried out during 2026. Part of the data shall be delivered in the end of 2026 and all data deliveries shall be finalized 2027 according the contract. The schedule for the survey work and deliveries is stated in the contract -attachment (attachment 11). The selection criteria for the winning bid is presented in the section "Other information, Grounds for decision". The areas to be bidded are defined in attached charts and shape-files (Attachment 1). The purpose is to perform hydrographic surveys inside the given area borders. Areas shallower than 2,5 m in given vertical reference are not required to be surveyed. 2) OPTION Tenderer is asked to give a daily rate price (12 h) of field survey work and respective data processing as option work. The price will be given in the Attachment 9, Quotation form. Option work, field survey work and data deliveries, shall be carried out during 2027. Approximately 300 000,00 (VAT 0%) euro is planned to be reserved for option in 2027. Tenderer shall establish one water level-station in Kiesimä area. A sufficient equipment type is a water level scale, which shall be leveled to the N2000-vertical reference frame. The required leveling distances are about 0.5 km for each water level scale. For Konnevesi area there is already an existing water level station which is operated by the Finnish Environmental Institute. All the field survey work and data processing shall be performed following FIS-44/2021 Order 1b requirements as stated in the technical specifications. The hydrographic surveys are to be performed with a professional quality MBES system and in a professional manner.Main features of the procedure1. GENERAL The procurement is subject to legislation on public procurement. The competitive tendering will be carried out using an open procedure as referred to in section 32 of the Act on Public Procurement and Concession Contracts (1397/2016). 2. CONTRACT NOTICE A contract notice on the procurement has been published online at www.hankintailmoitukset.fi. A contract award notice will also be issued about the procurement decision. 3. GROUP PARTICIPATION AND SUBCONTRACTOR RELATIONSHIPS The contract will be concluded with the supplier (company) under the name of which the tender was submitted. This supplier is responsible for all contractual obligations even when using subcontractors. Conditions concerning subcontractor relationships are laid down in the draft contract included as an annex to the invitation to tender. 4. USING THE RESOURCES OF OTHER ENTITIES: The tenderer may use the resources of other entities for carrying out the contract, irrespective of the legal character of the relations between them. The tenderer must actually have access to the other entities’ resources during the contract. Traficom reserves the right to demand evidence (such as commitments and agreements between companies) of the fact that the tenderer has access to the other entities’ resources. Such resources can include: 1) experience in providing the services being procured of a company that belongs to the same group as the supplier or some other company, provided that this unit is named as the supplier’s subcontractor for these services in the tender 2) professional competence of personnel in another company’s employ, provided that these persons factually take part in providing the service 3) resources related to financial standing 4) resources related to technical performance, provided that these resources are actually utilised for carrying out the contract. 5. PROCESSING OF TENDERS 5.1. Suitability of tenderers The tenderers’ fulfilment of set requirements related to financial standing, technical performance and professional competence will be assessed prior to the processing of tenders. The tenderers’ suitability will be assessed with the help of the information provided in the tender (ESPD form and eForms and other requested information). Tenderers are asked to check before submitting their tenders that the information in the service is correct. Tenderers that have been found guilty or whose personnel exercising power of representation, decision or supervision have been found guilty of one or more of the crimes mentioned in Article 57(1) of the Public Procurement Directive (2014/24/EU) or extortionate work discrimination as referred to in chapter 47, section 3a of the Criminal Code of Finland will be excluded from the tendering procedure (grounds for mandatory exclusion). Tenderers that are subject to other grounds for exclusion referred to in procurement legislation may be excluded from the tendering procedure (grounds for discretionary exclusion). 5.2. Compliance of tenders with the invitation to tender Offered services must comply with the invitation to tender and its annexes. Tenderers must answer all the questions that they are asked and attach all the requested documents to their tender. Tenders that do not comply with the invitation to tender will be excluded from the tendering procedure. 5.3. Comparison of tenders The comparison of tenders will be carried out as described under the section “Decision-making grounds” below. 5.4. Procurement decision and communication thereof The procurement decision will be communicated electronically to all tenderers. The public contract is not concluded with the communication of the procurement decision, but with a separate written contract. The public contract can be concluded once the procurement decision has become legally valid or a court has allowed the execution of the procurement. The procurement has not been divided into parts, because in terms of the end result and the execution of the work, it is justified to order work from the same supplier. Dividing the procurement to several suppliers would also increase management costs and the need for work supervision resources significantly.
Contact
Jyrki Mononennosa2026areal@traficom.fi- ResultType
- 71353100Main codeHydrographic surveying services