Nová huť – Melt Shop Technology
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- May 19,Expired
- Award
- TOTAL CAPEX & FINANCIAL COST (15 years) 45%
Brief
NOVÁ HUŤ s.r.o. needs to procure an electric arc furnace (EAF) with a 200-ton capacity and all associated steelmaking facilities, including an external scrap pre-heating facility, a new twin ladle furnace, and a new twin VD station. The furnace must be flexible, accommodating a charge mix of 100% scrap, 75% scrap + 25% DRI/HBI, or 50% scrap + 50% DRI/HBI. The steel produced will be dispatched to existing continuous casting machines (CCM1 or CCM2) or a future new billet CCM (CCM4). The award criteria are Total CAPEX & Financial Cost (15 years) (45%) and OPEX Evaluation (15 Years) (55%).
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
This evaluation criterion is specified in more detail in the Tender Documentation.
Source
No source found in the documents. Check the weight against the tender documents.
Description
This evaluation criterion is specified in more detail in the Tender Documentation.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at NOVÁ HUŤ s.r.o.
From the notice
The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1. Secondary metallurgy shall be handled via min. one new twin ladle furnace and via a new twin VD station (twin tank, twin cover, one common set of mechanical pumps).
Contact
Roland Hinterreiterroland.hinterreiter@novahut.cz- Competition · PrequalificationType
- Moravskoslezský krajLocation
- 42330000Main codeSmelting furnaces