    Finland: Tenders/NPHarvest Ltd./NPHarvest Demo Unit - Ammonia recovery Process
    1. Competition notice published

      Aug 5, 2024 11:01 AMAugust 5, 2024 11:01 AM
    2. Change in competition

      Aug 13, 2024 9:29 AMAugust 13, 2024 9:29 AM
    3. Questions deadline

      Aug 16, 2024 9:00 AMAugust 16, 2024 9:00 AM
    4. Change in competition

      Aug 19, 2024 12:31 PMAugust 19, 2024 12:31 PM
    5. Tender submission deadline

      Aug 30, 2024 9:00 AMAugust 30, 2024 9:00 AM
    6. Opening date

      Aug 31, 2024 9:01 AMAugust 31, 2024 9:01 AM
    7. Contract start date

      Sep 30, 2024 12:00 AMSeptember 30, 2024 12:00 AM
    8. Tender validity period

      Sep 30, 2024 9:00 AMSeptember 30, 2024 9:00 AM
    9. Contract end date

      Mar 31, 2025 12:00 AMMarch 31, 2025 12:00 AM

    Brief

    NPHarvest Demo Unit - Ammonia recovery Process

    Expired

    The competition has expired without a winner being announced.

    Deadline
    Aug 30, 2024Expired
    Award
    References 20% and 2 more
    Procedure
    OpenSingle stage
    Agreement
    Construction workuntil Mar 2025

    Brief

    The ammonia recovery system is a wastewater treatment process equipment fitted into two maritime containers. The designs, PID, equipment lists, control description and automation description have been prepared by Ramboll Finland. This project is for the construction of the Demo unit. Overview: The nitrogen recovery system is designed to remove nitrogen from wastewater and store it in a product recovery tank for further processing to dried form. The system consists of a series of membrane modules that operate in the presence of acid to separate nitrogen from water. The acid is recirculated through an acid-active tank to capture the separated nitrogen. A concentrated acid tank provides fresh acid when acid in circulation has been exhausted. The wastewater is fed from a feed tank and undergoes pH correction by lime or sodium hydroxide dosing systems before entering the membrane feed system. The product recovery system collects the nitrogen-rich stream from the membrane modules and transfers it to a product recovery tank. The acid refill system replenishes the acid in the concentrated acid tank when the pH changes to a set point. Process description: Nitrogen Nutrient Recovery The nitrogen nutrient recovery process is designed to recover ammonia from the wastewater using membrane separation technology. The system configuration is provided in Table 1, Plant Configuration. The wastewater is fed to the wastewater feed tank (P2-TNK01) via inlet flow control valve P2-HV02 through a direct connection from the wastewater pumping network or the bottom of the wastewater buffer tank from the client premises. If the source of wastewater is from an underground tank, ditch, or some sewer channel, then the same can be pumped via feed pump P2-CP01. The tank P2-TNK01 is equipped with a level controller and level switches, which help in maintaining the level of wastewater in the tank. The tank also has a turbidity analyzer and an ammonia analyzer. The wastewater from the feed tank P2-TNK01 is transferred to the membrane recovery system via pump P2-CP02 and flow control valve P2-HV01. The pH of the wastewater is adjusted by dosing lime or NaOH in a static mixer, which is fixed on the discharge line of the membrane feed pump P2-CP02. The Lime dosing system consists of a dosing tank P4-TNK02, which stores the Lime. The capacity is sufficient for one week of chemical requirement. The Lime is dosed in the wastewater line based on the pH of the wastewater via dosing pumps P4-KP02A/B. The dosing rate can be adjusted by changing the frequency on the variable frequency drive (VFD) installed on the dosing pump. Similarly, the pH can be adjusted by dosing lime solution in the wastewater. The lime dosing system consists of a lime storage silo P24-K01, a lime conveyor system P4-K02, a lime slurry preparation and storage tank P4-TNK01, which has a mixer P4-SK01 installed for slurry preparation, and lime dosing pumps P4-KP01A/B. The pH can be adjusted by either of the chemicals based on the operator's choice. The wastewater is fed to the membrane modules, which consist of four trains MB06 to MB010, each having five sets of membrane modules. The wastewater is fed to the membrane modules via a set of solenoid valves, which help in series and parallel flow configuration and bypass specific modules. Each of the membrane modules has a wastewater inlet and outlet, where the wastewater flows by the hollow membrane fibers in the module (wastewater is outside the membrane fiber). The solenoid valves P2-SV01 to P2-SV069 are used to control the flow of wastewater to each module and to bypass any module that is not in operation. The solenoid valves are operated by the programmable logic controller (PLC) based on the operator's input. The membrane modules also have an acid inlet and outlet, where a up to 98% sulfuric acid solution is circulated to extract the ammonia from the wastewater. The acid solution flows through the inside of the membranes. Ammonia that passes through the membrane fiber wall reacts with the acid inside the fiber, forming an ammonia salt. This means that ammonia concentration is zero inside the fiber. This creates a concentration (partial pressure) gradient that drives the ammonia transfer across the membrane pores. The pressure-reducing valves P3-PRV-01 to P3-PRV20 are installed on the acid inlets of each module to prevent pressure buildup inside the membrane fibers as too high pressure would lead to membrane rupturing. The acid recirculation process is repeated until the acid solution reaches a certain pH level, indicating that the available acid in the circulation has been exhausted and has captured as much ammonia as it can. The acid active tank is equipped with a pH sensor and a level sensor, which monitor the pH and the volume of the acid solution. When the pH sensor detects that the pH of the acid solution has increased to a preset value, the PLC stops the acid recirculation process and initiates the ammonium salt transfer process. The pump P3-KP01 then transfers the ammonium salt solution from the acid active tank P3-TNK-01 to the product storage tank P3-TNK03, where the ammonium salt is stored until further processing. The level sensor in the acid-active tank signals the PLC when the tank is empty, and the PLC then starts the acid replenishment process. The pump P3-KP02 transfers fresh concentrated acid from the strong acid tank P3-TNK02 to the acid active tank P3-TNK01. It is also possible to inject water into active tank P3-TNK01 if a diluted acid concentration is desired. When this is implemented, water is injected first, and concentrated acid is injected slowly to control the exothermic reaction. The level sensor in the acid active tank signals the PLC when the tank is full, and the PLC then resumes the acid recirculation process for the nitrogen nutrient recovery.

    Avløpshåndtering

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      The offers are pre-evaluated for technical compatibility (pass/fail) and then evaluated for their price (60), references (20), schedule (10) and risks (10).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The offers are pre-evaluated for technical compatibility (pass/fail) and then evaluated for their price (60), references (20), schedule (10) and risks (10).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The offers are pre-evaluated for technical compatibility (pass/fail) and then evaluated for their price (60), references (20), schedule (10) and risks (10).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The offers are pre-evaluated for technical compatibility (pass/fail) and then evaluated for their price (60), references (20), schedule (10) and risks (10).

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at NPHarvest Ltd.

    From the notice

    • The ammonia recovery system is a wastewater treatment process equipment fitted into two maritime containers. The designs, PID, equipment lists, control description and automation description have been prepared by Ramboll Finland. This project is for the construction of the Demo unit. Overview: The nitrogen recovery system is designed to remove nitrogen from wastewater and store it in a product recovery tank for further processing to dried form. The system consists of a series of membrane modules that operate in the presence of acid to separate nitrogen from water. The acid is recirculated through an acid-active tank to capture the separated nitrogen. A concentrated acid tank provides fresh acid when acid in circulation has been exhausted. The wastewater is fed from a feed tank and undergoes pH correction by lime or sodium hydroxide dosing systems before entering the membrane feed system. The product recovery system collects the nitrogen-rich stream from the membrane modules and transfers it to a product recovery tank. The acid refill system replenishes the acid in the concentrated acid tank when the pH changes to a set point. Process description: Nitrogen Nutrient Recovery The nitrogen nutrient recovery process is designed to recover ammonia from the wastewater using membrane separation technology. The system configuration is provided in Table 1, Plant Configuration. The wastewater is fed to the wastewater feed tank (P2-TNK01) via inlet flow control valve P2-HV02 through a direct connection from the wastewater pumping network or the bottom of the wastewater buffer tank from the client premises. If the source of wastewater is from an underground tank, ditch, or some sewer channel, then the same can be pumped via feed pump P2-CP01. The tank P2-TNK01 is equipped with a level controller and level switches, which help in maintaining the level of wastewater in the tank. The tank also has a turbidity analyzer and an ammonia analyzer. The wastewater from the feed tank P2-TNK01 is transferred to the membrane recovery system via pump P2-CP02 and flow control valve P2-HV01. The pH of the wastewater is adjusted by dosing lime or NaOH in a static mixer, which is fixed on the discharge line of the membrane feed pump P2-CP02. The Lime dosing system consists of a dosing tank P4-TNK02, which stores the Lime. The capacity is sufficient for one week of chemical requirement. The Lime is dosed in the wastewater line based on the pH of the wastewater via dosing pumps P4-KP02A/B. The dosing rate can be adjusted by changing the frequency on the variable frequency drive (VFD) installed on the dosing pump. Similarly, the pH can be adjusted by dosing lime solution in the wastewater. The lime dosing system consists of a lime storage silo P24-K01, a lime conveyor system P4-K02, a lime slurry preparation and storage tank P4-TNK01, which has a mixer P4-SK01 installed for slurry preparation, and lime dosing pumps P4-KP01A/B. The pH can be adjusted by either of the chemicals based on the operator's choice. The wastewater is fed to the membrane modules, which consist of four trains MB06 to MB010, each having five sets of membrane modules. The wastewater is fed to the membrane modules via a set of solenoid valves, which help in series and parallel flow configuration and bypass specific modules. Each of the membrane modules has a wastewater inlet and outlet, where the wastewater flows by the hollow membrane fibers in the module (wastewater is outside the membrane fiber). The solenoid valves P2-SV01 to P2-SV069 are used to control the flow of wastewater to each module and to bypass any module that is not in operation. The solenoid valves are operated by the programmable logic controller (PLC) based on the operator's input. The membrane modules also have an acid inlet and outlet, where a up to 98% sulfuric acid solution is circulated to extract the ammonia from the wastewater. The acid solution flows through the inside of the membranes. Ammonia that passes through the membrane fiber wall reacts with the acid inside the fiber, forming an ammonia salt. This means that ammonia concentration is zero inside the fiber. This creates a concentration (partial pressure) gradient that drives the ammonia transfer across the membrane pores. The pressure-reducing valves P3-PRV-01 to P3-PRV20 are installed on the acid inlets of each module to prevent pressure buildup inside the membrane fibers as too high pressure would lead to membrane rupturing. The acid recirculation process is repeated until the acid solution reaches a certain pH level, indicating that the available acid in the circulation has been exhausted and has captured as much ammonia as it can. The acid active tank is equipped with a pH sensor and a level sensor, which monitor the pH and the volume of the acid solution. When the pH sensor detects that the pH of the acid solution has increased to a preset value, the PLC stops the acid recirculation process and initiates the ammonium salt transfer process. The pump P3-KP01 then transfers the ammonium salt solution from the acid active tank P3-TNK-01 to the product storage tank P3-TNK03, where the ammonium salt is stored until further processing. The level sensor in the acid-active tank signals the PLC when the tank is empty, and the PLC then starts the acid replenishment process. The pump P3-KP02 transfers fresh concentrated acid from the strong acid tank P3-TNK02 to the acid active tank P3-TNK01. It is also possible to inject water into active tank P3-TNK01 if a diluted acid concentration is desired. When this is implemented, water is injected first, and concentrated acid is injected slowly to control the exothermic reaction. The level sensor in the acid active tank signals the PLC when the tank is full, and the PLC then resumes the acid recirculation process for the nitrogen nutrient recovery.Main features of the procedureWe aim for simplicity: 1. The tender becomes public with relevant information for the project 2. Offers are evaluated based on the references, schedule and cost in the offer, presented in attached documents. The offers are pre-evaluated for technical compatibility (pass/fail) and then evaluated for their price (60), references (20), schedule (10) and risks (10). 3. The best overall offer is accepted and collaboration starts

    • Contact

      info@npharvest.fi
    • Type
      Competition
    • Main code
      Construction work
      45000000
    • 90420000Sewage treatment services90510000Refuse disposal and treatment90700000Environmental services

    Similar active competitions

    • Heim Kommune

      Bygg og anlegg - Grunnarbeid, vann og kloakk

      Sandbukta vannbehandlingsanlegg (VBA), Heim kommune - Maskintekniske installasjoner

      Heim kommune trenger komplett leveranse og montering av prosessteknisk utstyr til Sandbukta vannbehandlingsanlegg i Trøndelag. Dette er en totalentreprise hvor entreprenøren skal gi funksjons- og prosessgaranti for anlegget. Tildelingskriteriene er kvalitet (60%) og pris (40%). Kvalifikasjonskrav er beskrevet i konkurransegrunnlaget.

      Competition
      Nov 9, 2026(10 days)
    • Bir AS

      Bygg og anlegg - Grunnarbeid, vann og kloakk

      Kjøp av renseanlegg til BIR Ressurs - Mjelstad deponi

      BIR AS, på vegne av BIR Ressurs avdeling Mjelstad, skal anskaffe et komplett renseanlegg for sigevann fra deponiet i Vestland. Leveransen omfatter nødvendig utstyr, montering, idriftsettelse og opplæring, og skal gjennomføres over 3 år. BIR etablerer selv areal og bygg og anskaffer pumpene separat; leverandøren må derfor oppgi anleggets dimensjoner og tydelig beskrive grensesnittene mot pumpene. Maksimal totalverdi er 10 millioner kroner. Tilbud vurderes på totalkostnad (40 %), miljøhensyn knyttet til vann- og energiforbruk (20 %) og kvalitet (40 %).

      Competition
      Jan 29, 2027(91 days)
      NOK 10,000,000
    • Oslo Kommune Vann- Og Avløpsetaten

      Bygg og anlegg - Grunnarbeid, vann og kloakk

      Kjøp av pilotanlegg for kvartærrensing ved BRA

      Oslo Kommune Vann- Og Avløpsetaten trenger levering av et pilotanlegg for kvartærrensing, bestående av en ozonpilot og filterkolonner, til Bekkelaget renseanlegg i Oslo. Kontrakten har en varighet på 6 måneder og skal muliggjøre testing og sammenligning av ulike rensetrinn for fjerning av mikroforurensninger, spesielt legemiddelrester. Leverandører kan gi deltilbud på ozonpiloten eller filterkolonnene, eller begge deler. Tildelingskriteriene vektlegger pris (70%) og kvalitet (30%). Kvalifikasjonskrav inkluderer erfaring fra leveranser av tilsvarende art og vanskelighetsgrad knyttet til pilotanlegg for ozonering og/eller filtrering i kolonner for avløpsrensing, samt et kvalitetssikringssystem dokumentert med for eksempel ISO 9001-sertifikat.

      Competition
      Oct 30, 2026(0 days)