Finland: Tenders/Tampereen Energia Oy/NSL3 FGC-HP, Heat Pump Plant of Flue Gas Condenser System
  1. Competition notice published

    Sep 9, 2022 8:00 AMSeptember 9, 2022 8:00 AM
  2. Express interest deadline

    Sep 30, 2022 10:00 AMSeptember 30, 2022 10:00 AM
  3. Qualification deadline

    Not stated
  4. Tender submission deadline

    Sep 30, 2022 10:00 AMSeptember 30, 2022 10:00 AM

Brief

NSL3 FGC-HP, Heat Pump Plant of Flue Gas Condenser System

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Sep 30, 2022Expired
Procedure
With negotiationTwo stages
Agreement
Buying goodsover 2 years

Brief

Tampereen Sähkölaitos Oy is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will also renew the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. The Purchaser is named the project NSL3. This Contract Notice is published to purchase NSL3 FGC-HP (Heat Pump Plant of Flue Gas Condensing (FGC) System). The Supply consisting of the full process delivery of the heat pump plant containing all necessary auxiliary equipment with internal piping, instrumentation, electrification and cabling of full operating plant excluding the main pipe works and the civil works.

Anleggsmaskiner og utstyr

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Alle betingelser for deltakelse er presentert i ESPD.

    Documentation Requirement

    ESPD

    Source

    No source found in the documents. Check the requirement against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Tampereen Energia Oy

From the notice

  • Tampereen Sähkölaitos Oy is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will also renew the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. The Purchaser is named the project NSL3. This Contract Notice is published to purchase NSL3 FGC-HP (Heat Pump Plant of Flue Gas Condensing (FGC) System). The Supply consisting of the full process delivery of the heat pump plant containing all necessary auxiliary equipment with internal piping, instrumentation, electrification and cabling of full operating plant excluding the main pipe works and the civil works.

  • Contact

    nsl3hankinnat@sahkolaitos.fi
  • Type
    Competition · Prequalification
  • Main code
    Heat pumps
    42511110

Similar active competitions

  • Electricity Supply Board ( ESB )

    Anleggsmaskiner og utstyr

    HEAT EFFICIENCY SYSTEMS

    Provision of Heat efficiency technology such as heat pump installations on a turnkey basis, design, fully installed and commissioned. The Contractor will be responsible for design, supply, and installation of all materials, and system commissioning including handover to the designated O and M (Operation and Maintenance) and /or Asset owner.

    Qualification system
    Jun 24, 2027(100+ days)
  • Lappeenrannan-Lahden teknillinen yliopisto LUT

    Industrimaskiner

    Circulating Fluidised Bed (CFB) reactor and Heat Recovery Steam Generator (HRSG) pilot plant

    Lappeenrannan-Lahden teknillinen yliopisto LUT needs a 100 kWth circulating fluidized bed (CFB) pilot plant and an attached heat recovery steam generator (HRSG) to be delivered, installed, tested, and commissioned in Etelä-Karjala, Finland. The CFB must be capable of combustion, gasification, and other reaction modes using various feedstocks and process gases, while the HRSG, located downstream, will operate as a once-through unit for steam generation and hot-gas cooling, designed and manufactured according to PED 2014/68/EU using Module G conformity assessment. The award criteria are Price (50%) and Quality (50%).

    Competition
    Nov 10, 2026(10 days)
  • Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

    Anleggsmaskiner og utstyr

    Heat Pumps 50 KW el and 100 KW el

    Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH needs heat pumps for delivery in Main-Taunus-Kreis under a 9-month supply contract. The procurement covers five 50 kW electrical-input heat pumps and five 100 kW electrical-input heat pumps, each lot with two mandatory options; additional quantities of five units for each of Lots 3, 4 and 5 must also be offered, with acceptance conditional. Suppliers must document annual net turnover exceeding €300,000 in heat-pump supply for each of 2023, 2024 and 2025, and provide at least two heat-pump supply references from the previous three years.