Search

  • Search


    Official name: Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 Steel lot

    Ørsted Wind Power A/S

    Official name: Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 Steel lot

    1. Contract signed

      2. mars kl. 00:002. mars 2022 kl. 00:00
    2. Result notice published

      31. okt. kl. 10:0031. oktober 2022 kl. 10:00

    Brief

    Denmark: Tenders/Ørsted Wind Power A/S/Official name: Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 Steel lot

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Anleggs- og infrastrukturbygging

    Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 steel Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces

    Result

    Number of bids
    0
    Contract value
    Not stated

    About the bid

      Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 steel Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces

      Contact name
      Christian Dreyer
      Contact email
      chrdh@orsted.com
      Address
      Kraftvaerksvej 53, DK-7000 Fredericia

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Ørsted Wind Power A/S
    Title
    Official name: Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 Steel lot
    Type
    ResultPrequalification
    Main code
    45000000Construction work
    Supplemental codes
    45223200Structural works45223210Structural steelworks45223800Assembly and erection of prefabricated structures45223810Prefabricated constructions45223820Prefabricated units and components45262421Offshore mooring work45262423Deck-fabrication work45262424Offshore-module fabrication work45262680Welding

    Active similar competitions

    • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

      Bygg og anlegg - Oppføring og konstruksjon av bygninger

      Supplementary notice to notice 2022/S 171-485697 (Works)– Tender for Manufacture and Supply of Foundation Secondary Structures Reference number: 2022/S 171-485697 (Works)

      This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485697 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entity' purchases in EU tender procedures.This notice relates to the contracting entity project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for the Manufacture and Supply of Foundation Secondary Structures. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system no earlier than 21 of June 2024 using product code 4.4.23.

      Qualification system22. mai 2024
      19. juni 2027(100+ days)