Official name: Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 Steel lot
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Oct 30, 2022Expired
- Procedure
- With negotiationTwo stages
- Agreement
- Construction work
Brief
Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 steel Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces
Civil engineering and infrastructure construction
Result
- 0Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ørsted Wind Power A/S
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Manufacture and Supply of Secondary Structures for Borkum Riffgrund 03 Offshore Wind Farm (BKR03) and Gode Wind 03 Offshore Wind Farm (GOW03) Lot_2 steel Lot The secondary Sturctures are to be delivered to two individual sites named Godewind by 24 pieces and Borkum Riffgrund 83 pieces
Contact
Christian Dreyerchrdh@orsted.com- Result · PrequalificationType
- 45000000Main codeConstruction work
- 45223200Structural works45223210Structural steelworks45223800Assembly and erection of prefabricated structures45223810Prefabricated constructions45223820Prefabricated units and components45262421Offshore mooring work45262423Deck-fabrication work45262424Offshore-module fabrication work45262680Welding