PANDORA
Awarded
The competition has ended and a winner has been selected.
- Award
- Preiskriterium 40%
- Procedure
- OpenSingle stage
- Agreement
- Buying servicesuntil sep. 2027
Brief
The German Aerospace Center (DLR) has awarded Stichting Koninklijk Nederlands Lucht- en Ruimtevaartcentrum (NLR) a €718,000 contract for the detailed design and manufacture of an open-rotor wind-tunnel test prototype, including a rotating-shaft balance to measure rotor forces and moments. The work is located in Cologne and includes hardware, analysis models and a CAD representation, as well as on-site support during three weeks of testing. The prototype is designed for low- and high-speed wind-tunnel operation and features a 12-blade rotor with manually actuated variable pitch; the balance must measure all three force and moment components. One bid was received.
Result
- Stichting Koninklijk Nederlands Lucht en Ruimtevaart Centrum (NLR) Anthony Fokkerweg 2 1059 CM AmsterdamWinner
- 1Number of bids
- €718,000Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Provision of one reference is mandatory, either by completing the form template or through other appropriate documentation (e.g. a one-page document with images and a brief description of a project successfully completed in the past). In this reference the successful completion of a comparable project in all aspects is mandatory.
Documentation Requirement
Provision of one reference is mandatory, either by completing the form template or through other appropriate documentation (e.g. a one-page document with images and a brief description of a project successfully completed in the past).
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The supplier shall be certified by ISO / IEC 9001:2015 for quality management.
Documentation Requirement
The supplier shall be certified by ISO / IEC 9001:2015 for quality management.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The supplier shall be certified by AQAP2110:2016 for quality management.
Documentation Requirement
The supplier shall be certified by AQAP2110:2016 for quality management.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Proposal concept: Maximum 40 Points: The proposed offer is presented in a coherent and well-founded manner. All technical requirements from the specification are described in detail and fulfilled. The proposal shall be complete in the sense that all parts of the DL of each WP need to be delivered, proposals covering only parts thereof (e.g. only the rotor blades) shall be excluded. All specifications that need to be addressed and confirmed explicitly are marked in the SoW. Non-compliance will result in down-scoring; Date of delivery: Maximum 20 Points: Compliance with the specified milestones: 4 months and 10 months; submission of the delivery date; PTS_PRICE = 700,000€ / Price * 40
Sub-criteria
- Proposal concept40%
The proposed offer is presented in a coherent and well-founded manner. All technical requirements from the specification are described in detail and fulfilled. The proposal shall be complete in the sense that all parts of the DL of each WP need to be delivered, proposals covering only parts thereof (e.g. only the rotor blades) shall be excluded. All specifications that need to be addressed and confirmed explicitly are marked in the SoW. Non-compliance will result in down-scoring.
- Date of delivery20%
Compliance with the specified milestones: 4 months and 10 months; submission of the delivery date.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Preis 40%
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Deutsches Zentrum für Luft-und Raumfahrt e. V. | TI-ZVM
From the notice
The objective of this activity is to carry out the detailed design and manufacturing of a subassembly for the EU-Horizon 2050 funded project PANDORA (OPEN FAN VALIDATION FOR CARBON-FREE AIRCRAFTS | PANDORA | Projekt | Informationsblatt | HORIZON | CORDIS | Europäische Kommission) Open Fan Wind Tunnel Mode Test Article, whose preliminary design has been carried out by the PANDORA consortium. The status of the design is deemed to be mature enough to proceed to the detailed design phase. The preliminary aerodynamic shape of the rotor is frozen but during the detailed design phase interactions with the subcontractor are expected to ease the detailed mechanical design alleviating stress concentration in selected features of the rotor to maximise rotor life. The rig is expected to operate in two different facilities. The first installation is a low-speed wind tunnel operating at atmospheric conditions. Maximum Mach number is expected to be around 0.25. The second facility is a high-speed wind tunnel opera ng at sub-ambient conditions and a maximum Mach number of around 0.8 The expected outer and inner radii of the rotor are approximately 300 mm and 100 mm, respectively, and thus the blade height is approximately 200 mm. The number of rotor blades has been fixed to 12. The es mated maximum speed is about 7,700 rpm. The rotor is expected to feature a variable pitch mechanism that will be manually actuated at rest. The subcontractor, as responsible of all the rotating parts, will also design and manufacture a device to measure the pitch setting of all the blades before the rig opera on. The contractor will not use Level 2 subcontractors for critical components (most notably the Rotating Sha Balance), but will only utilize subcontractors for small parts or accessories. In the event of any doubts, the contractor will submit proposals in the ROM. DLR will request on-site support to operate the Rotating Shaft Balance during three weeks of testing. In summary, the objective of this contract is to carry out the detailed design of an open rotor prototype, its manufacturing, and the development and integration of a system that allows for the measurement of the three components of rotor forces and moments, namely a Roating Shaft Balance (RSB). The deliverables will include the hardware, analysis models, and a CAD representation of the prototype.
Contact
evergabe@dlr.de- ResultType
- Köln, Kreisfreie StadtLocation
- 73120000Main codeExperimental development services