Search
  • Search


Belgium: Tenders/Elia Transmission Belgium/PDC WAMS
  1. Competition notice published

    Mar 13, 2025 10:00 PMMarch 13, 2025 10:00 PM
  2. Qualification deadline

    May 2, 2025 10:00 AMMay 2, 2025 10:00 AM
  3. Tender submission deadline

    Comes with the invitation
  4. Contract start date

    Jun 1, 12:00 AMJune 1, 2026 12:00 AM

Brief

PDC WAMS

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
May 2, 2025Expired
Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€1M

Brief

The National Control Center department of ELIA Transmission Belgium is looking for a solution to deploy a PDC-WAMS system (Phasor Data Concentrator – Wide Area Monitoring System) to collect, store, post process, analyze and visualize data coming from PMU’s installed in the ELIA grid. The solution shall support power system experts during investigation of the normal behavior of the Belgian grid and post incident (or almost incident) analysis. Power system experts must be able to use the tool that is being procured to perform analysis for phenomena (e.g. interactions, oscillations, ...) happening at a broad range of frequencies from (very) low frequencies up to just below 50Hz (sub synchronous range). Additionally, power systems experts would have to investigate even higher frequency ranges up some kHz (super-synchronous range) using data coming from the waveform recorders installed on the Elia grid. Therefore, the offered solution shall include features like oscillation detection, oscillation location, damping estimation and monitoring plus other analysis functionalities that would allow the experts to ease the detection of interaction between electrical assets and clients (e.g. wind parks, HVDC systems, synchronous generators, large loads, ...). Next to support power system experts, the solution must also support real time operators by offering detailed insights on the actual behavior of the grid. This must allow detection and the resolution of potential issues on the grid in an early stage. The solution being procured will have to offer communication (via standard protocol) with the existing ELIA SCADA/EMS system to exchange selected data, analysis results and alarms to the operators. The tender will have one lot, including: - PDC-WAMS tool selection: product and licenses o In the tender it will be requested that ELIA will be the owner of the licenses - Technical implementation within ELIA Transmission Belgium - Key User Training - Maintenance, Support and SLA contract

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Elia Transmission Belgium

From the notice

  • The National Control Center department of ELIA Transmission Belgium is looking for a solution to deploy a PDC-WAMS system (Phasor Data Concentrator – Wide Area Monitoring System) to collect, store, post process, analyze and visualize data coming from PMU’s installed in the ELIA grid. The solution shall support power system experts during investigation of the normal behavior of the Belgian grid and post incident (or almost incident) analysis. Power system experts must be able to use the tool that is being procured to perform analysis for phenomena (e.g. interactions, oscillations, ...) happening at a broad range of frequencies from (very) low frequencies up to just below 50Hz (sub synchronous range). Additionally, power systems experts would have to investigate even higher frequency ranges up some kHz (super-synchronous range) using data coming from the waveform recorders installed on the Elia grid. Therefore, the offered solution shall include features like oscillation detection, oscillation location, damping estimation and monitoring plus other analysis functionalities that would allow the experts to ease the detection of interaction between electrical assets and clients (e.g. wind parks, HVDC systems, synchronous generators, large loads, ...). Next to support power system experts, the solution must also support real time operators by offering detailed insights on the actual behavior of the grid. This must allow detection and the resolution of potential issues on the grid in an early stage. The solution being procured will have to offer communication (via standard protocol) with the existing ELIA SCADA/EMS system to exchange selected data, analysis results and alarms to the operators. The tender will have one lot, including: - PDC-WAMS tool selection: product and licenses o In the tender it will be requested that ELIA will be the owner of the licenses - Technical implementation within ELIA Transmission Belgium - Key User Training - Maintenance, Support and SLA contract

  • Contact

    ignaas.devalkenaere@elia.be
  • Type
    Competition · Framework agreement · Prequalification
  • Location
    Arr. de Bruxelles-Capitale/Arr. Brussel-Hoofdstad
  • Main code
    IT services: consulting, software development, Internet and support
    72000000

Similar active competitions

  • Elia Asset

    Elektrisitet og energiforvaltning

    Qualification for supply of electrical energy for Grid losses

    Elia, in its role as high-voltage grid operator in Belgium, is looking to purchase electric Energy to offset grid losses generated by the normal operational operation of the high-voltage electric grid.

    Qualification system
    Dec 27, 2027(100+ days)
  • Elia Transmission Belgium

    Onshore Substations in EPCIC-FIM model

    In accordance with the latest Capex Plan, and the on-going energy transition, Elia intends to outsource multiple investment projects for onshore substations in Belgium that were previously realized in-house. The aim is to construct some substations in a EPCIC-FIM model. Meaning that the engineering, procurement (without noble materials/FIM), construction, installation and commissioning will be (partly) tendered in one contract. Only candidates that qualify in the prequalification phase of this EU procurement (see section 5.1.6) of this Qualification System will have access the tender phases.

    Qualification system
    Jun 11, 2027(100+ days)
  • Elia Asset

    Framework agreement - Busbar Protection (BBP) cubicles - 2029-2037

    Elia Asset needs a framework agreement for the design, engineering, manufacture, factory testing, packaging, transport, delivery and unloading of busbar protection (BBP) cubicles, including accessories, spare parts, after-sales service and related substation services, as well as a maintenance contract. The agreement covers delivery in Belgium and has an 8-year duration with a maximum total value of €18 million.

    Framework agreement with qualification
    Jan 14, 2027(57 days)
    €18,000,000