Ireland: Tenders/Medite Europe DAC/PQQ for the Design, Supply, Installation and Commissioning of a Flue Gas Abatement System at Medite Europe DAC

PQQ for the Design, Supply, Installation and Commissioning of a Flue Gas Abatement System at Medite Europe DAC

Expired

The competition has expired without a winner being announced.

Deadline
Jun 26,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€0over 1 month

Brief

Medite Europe DAC needs a flue gas abatement system and associated ancillaries for a biomass boiler installation, including design, supply, installation, and commissioning. The system must treat boiler flue gas to reduce particulate emissions, integrate with existing plant infrastructure, and achieve required emissions performance while maintaining operability and safety. The project duration is 1 month. The successful contractor will undertake detailed engineering, equipment manufacture and supply, delivery, erection, testing, commissioning, performance verification, operator training, and handover of the complete system. The proposed equipment must be proven industrial technology and conform to European legislation and standards.

Mekaniske installasjoner

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Medite Europe DAC

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • MEDITE Europe DAC is invites expressions of interest from experienced and qualified companies for the design, supply, installation and commissioning of a flue gas abatement system and associated ancillaries for a biomass boiler installation. A system will be required to treat the boiler flue gas stream and reduce particulate emissions in order to support safe, reliable and compliant plant operation. The proposed solution shall be suitable for the defined operating conditions, including flue gas flow, temperature, moisture content and dust loading, and shall be capable of integration with the existing boiler, draft system, stack and plant control infrastructure. The scope is expected to include, as applicable, the main abatement equipment, inlet and outlet ductwork interfaces, support steelwork, access platforms, insulation, ash collection and discharge arrangements, instrumentation, controls, electrical integration, and all associated ancillaries necessary for a complete and operable system. The system should be designed to achieve the required emissions performance while maintaining acceptable pressure drop, operability, maintainability and safe access for inspection and maintenance. The proposed equipment must be of proven industrial technology and conform to best practice design principles and all relevant European legislation and standards, including CE marking where applicable. The successful contractor shall be expected to undertake detailed engineering, equipment manufacture and supply, delivery to site, erection, testing, commissioning, performance verification, operator training and handover of the complete system, together with the provision of all relevant drawings, manuals and technical documentation. It is anticipated that this pre-qualification process will be followed by technical proposal evaluation and a subsequent detailed tendering stage for the selected bidders.

  • Contact

    John.Browne@mdfosb.com
  • Type
    Competition
  • Location
    South-East
  • Main code
    Mechanical engineering installation works
    45351000
  • 42160000Boiler installations45220000Engineering works and construction works45331000Heating, ventilation and air-conditioning installation work45331110Boiler installation work71314310Heating engineering services for buildings71320000Engineering design services71333000Mechanical engineering services

Similar active competitions

  • Gas Networks Ireland

    Industrimaskiner

    25/061 - Qualification System for Boiler Package Units

    Gas Networks Ireland needs boiler package units and heat exchangers for a duration of 10 years. The scope includes the design, manufacture, assembly, delivery, and commissioning of complete packaged boiler units comprising natural gas-fired boilers, natural gas-fired generators, associated LPHW systems, control and automation systems, instrumentation, documentation, FAT/SAT, and commissioning support. The procurement may also include additional services, works, and supplies relevant to the Boiler Package Unit site. The services may be required in Northern Ireland and/or Scotland. Offers will be evaluated based on Price and Quality.

    Qualification system
    May 15, 2036(100+ days)
  • Bioenergie Kufstein GmbH

    Kjøle- og ventilasjonsteknologi

    BM-FHKW Kufstein – Rauchgasreinigung und Rauchgaskondensation

    Die Bioenergie Kufstein GmbH benötigt für die Modernisierung und Erweiterung des Rauchgasreinigungs- und Wärmerückgewinnungssystems ihres Biomasseheizkraftwerks die Lieferung, Montage und Inbetriebnahme einer Rauchgasreinigungs- und Rauchgaskondensationsanlage. Der bestehende Nass-Elektrofilter wird demontiert und durch einen Gewebefilter ersetzt; zusätzlich wird eine zweistufige Rauchgaskondensation mit neuer Wärmerückgewinnung errichtet, um mehr Abwärme nutzbar zu machen und die Energieeffizienz zu steigern. Die Bauleistungen sind für das Kraftwerk in Kufstein, Österreich, bestimmt.

    Competition with qualification
    Nov 26, 2026(3 days)
  • Bord na Móna PLC

    Oppføring av bygninger

    SC 07/25 - Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) Qualification System

    Bord na Móna PLC in Ireland is establishing a Qualification System for the provision of Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) works. This system is of indefinite duration, but is anticipated to apply for 10 years with an option to extend. The procurement covers Lot 1 – OCGT Supply OEM and LTSA, Lot 2 – OCGT Balance of Plant Constructor, Lot 3 – OCGT Engineering, Procurement and Construction (EPC) LTSA, and Lot 4 – CCGT Engineering, Procurement and Construction (EPC) + LTSA.

    Qualification system
    Oct 6, 2029(100+ days)