Medite Europe DAC needs electrical contractor services for the construction stage of Project Shine’25, a modernization project for their MDF facility, with a maximum total value of 900,000 EUR over 1 month. The project involves the installation of new equipment, including wet and dry fuel handling systems, an energy plant, and MDF dryers. The electrical contractor's scope of work includes lighting, fire detection, earthing and lightning protection, site services, power distribution, and mechanical wiring for various areas such as the construction compound, energy plant MCC, thermal oil primary and secondary pump rooms, dryer MCC, wet fuel MCC, and the energy plant + ESP. The services are to be delivered in Dublin.
Electrical installation in buildings
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Medite Europe DAC
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
MEDITE Europe DAC have plans to modernize their MDF facility with an investment in new equipment called Project Shine. Project Shine involves the installation of the following: • Wet fuel handling system of which the main components are: • Fuel bins • Conveyors • Hoppers • Silo • Dry Fuel handling system of which the main components are: • Silo’s • Screens • Conveyors • Energy plant of which the main components are: • Infeed system • Main Furnace • Thermal Oil Heater • Electrostatic Precipitator • Steam Generator • Associated fans: ID fans, recirculation, primary + secondary. • MDF dryers of which the main components are: • Hot Gas Duct • Face Dryer • Core Dryer • Associated fans • Services + utilities to the above, mainly: • Thermal oil • Compressed air • Water • Natural Gas • Steam • Storm and foul water • Bunds where necessary Electrical Contractor Scope of Works Project Shine has completed the detailed design phase of the project and proposals are sought for the Electrical Contractor for the Construction Stage of Project Shine. The main requirements of the Electrical Contractor, which is a non-exhaustive list, are outlined below: • Construction Compound o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power Distribution o Office WiFi o Canteen/Showers/Toilets o Access control o Mechanical wiring (for Buyer’s scope mechanical plant) o Testing + commissioning of electrical services • Energy Plant MCC o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power distribution o PFC o 400V transformer o Switchgear o Emergency generator o UPS o Raised floor system o Mechanical wiring (for Buyer’s scope mechanical plant) o Decommissioning existing building o Testing + commissioning of electrical services • Thermal Oil Primary Pump Room o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power distribution o Mechanical wiring (for Buyer’s scope mechanical plant) o Testing + commissioning of electrical services • Thermal Oil Secondary o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power distribution o Mechanical wiring (for Buyer’s scope mechanical plant) o Testing + commissioning of electrical services • Dryer MCC o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power distribution o PFC o 690 + 400V transformers o Switchgear o Emergency generator o UPS o Raised floor system o Mechanical wiring (for Buyer’s scope mechanical plant) o Decommissioning proposed room to facilitate MCC o Testing + commissioning of electrical services • Wet Fuel MCC o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Power distribution o PFC o UPS o Mechanical wiring (for Buyer’s scope mechanical plant) o Modifications to proposed room to facilitate MCC o Testing + commissioning of electrical services • Energy Plant + ESP o Lighting (General + Emergency) services o Fire detection services o Earthing + lightning protection services o Site services o Trace heating (process + fire water) o Mechanical wiring (for Buyer’s scope mechanical plant) o Testing + commissioning of electrical services ** Please see the attached Tender Document for the Full and Complete Scope of Works ***
Contact
John.Browne@mdfosb.com- CompetitionType
- DublinLocation
- 45315100Main codeElectrical engineering installation works
- 45310000Electrical installation work45317000Other electrical installation work51100000Installation services of electrical and mechanical equipment71314100Electrical services71334000Mechanical and electrical engineering services