Medite Europe DAC needs a Civil, Structural and Architectural (CSA) Contractor for the construction stage of Project Shine'25, involving the modernization of their MDF facility in Dublin. The project, valued at a maximum of 3.8 million EUR, is expected to last 1 month and includes extensive civil, structural, and architectural works for new equipment such as wet and dry fuel handling systems, an energy plant, and MDF dryers. This encompasses excavation, earthworks, construction of various pads, bases, structures, and modifications to existing buildings, as well as associated civil works for services and utilities.
Architectural services
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Medite Europe DAC
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
MEDITE Europe DAC have plans to modernize their MDF facility with an investment in new equipment called Project Shine. Project Shine involves the installation of the following: • Wet fuel handling system of which the main components are: • Fuel bins • Conveyors • Hoppers • Silo • Dry Fuel handling system of which the main components are: • Silo’s • Screens • Conveyors • Energy plant of which the main components are: • Infeed system • Main Furnace • Thermal Oil Heater • Electrostatic Precipitator • Steam Generator • Associated fans: ID fans, recirculation, primary + secondary • MDF dryers of which the main components are: • Hot Gas Duct • Face Dryer • Core Dryer • Associated fans • Services + utilities to the above, mainly: • Thermal oil • Compressed air • Water • Natural Gas • Steam • Storm and foul water • Bunds where necessary 2.1 Civil, Structural and Architectural (CSA) Contractor Scope of Works Project Shine has completed the detailed design phase of the project and proposals are sought for the Civil, Structural and Architectural (CSA) Contractor for the Construction Stage of Project Shine. The main requirements of the CSA Contractor, which is a non-exhaustive list, are outlined below: • Construction Compound o Excavation + earthworks o Plinths/Pads/Bases for portacabins o Walkway + pathways o Hoarding + fencing o Gates + turnstiles o Access roads + car parking o Laydown + hardstanding areas o Concrete truck washdown areas o Waste storage areas o Smoking areas o Civil works associated with services + utilities • Energy Plant MCC o Excavation + earthworks o Structure o Lifting support o Plinths/Pads/Bases o Doors o HT ducting o Demolition and removal of existing building o Civil works associated with services + utilities • Thermal Oil Primary Pump Room o Excavation + earthworks o Structure o Lifting support o Bund o Doors o Civil works associated with services + utilities • Thermal Oil Secondary o Floor strengthening o Bund o Civil works associated with services + utilities • Dryer MCC o Structure o Lifting support o Doors o HT ducting o Demolition of existing building o Civil works associated with services + utilities • Wet Fuel MCC o Excavation + earthworks o Structure o Lifting support o Doors o Modifications to existing building o Civil works associated with services + utilities • Energy Plant + ESP o Excavation + earthworks o Plinths/Pads/Bases for fans + pumps o Pads for energy plant o Pads for cyclo-filter o Pads for fill + drain o Pads for stack o Bases for ESP o Bases for HP blowers o Bases for hot gas duct o Pads for bottom ash conveyor o Bottom ash bunker o Fly ash bunker o Fill + drain bund o Emergency pumps bund o Structure o Conveyor support on existing boiler roof o Yards o Walls o Civil works associated with services + utilities • Energy Plant Walking Floor o Excavation + earthworks o Structure o Hardox plates in floor o Fuel conveyor + weigh belt bases o Roof o Civil works associated with services + utilities • Dryer Modifications o Floor strengthening o Floor modifications o Plinths/Pads/Bases o Doors • Dryer Roof o Demolition o Replacement • Wet Fuel o Excavation + earthworks o Wet fuel walking floor o Hardox plates in floor o Roof o Truck drive through works o Conveyor belts o Bases for 3nr. screens o 3nr. screen reject bunkers o 1nr. metal reject bunker o Base for hopper o Upper + lower yards o Vecoplan structural strengthening works o Civil works associated with services + utilities • Dry Fuel o Excavation + earthworks o Pad for edge trim silo o Pad for dust silo o Demolition + removal of existing dust silo o Civil works associated with services + utilities • Other Sundry CSA Works to facilitate the above **See Tender Document attached***
Contact
John.Browne@mdfosb.com- CompetitionType
- DublinLocation
- 45213250Main codeConstruction work for industrial buildings