Pre-qualification of Supply Cable for Nuijala Heat Station
Cancelled
The competition has been cancelled.
- Qualification deadline
- Aug 29, 2024Expired
- Procedure
- Competitive dialogueTwo stages
- Agreement
- Construction work
Brief
Fortum Power and Heat Oy is building a heat plant in Nuijala, Espoo and the connecting district heatinglines to distribute the heat to Espoo district heating network. Heat will be produced by electric boiler which is connected also to a heat accumulator (20 000m3), The heating capacity of the plant is approximately 50 MW (Megawatt).The new heat plant shall be ready for commercial operation in the end of 2025. The scope of supply comprises of the following ITEM(s) •ITEM 01: Installation of cable protection pipes for MV and HV-supply cables (cabling route length approx. 700m in urban area)oPermission administration, excavating works, traffic control, residual, reconstruction roadworks, excavating area restoration worksoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction site • ITEM 02: Installation of 20kV MV-supply cables between existing substation and existing medium voltage switchgear (20kV).oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site •ITEM 03: Installation of earthing continuity conductors and optical fibre pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction siteOPTION •ITEM 04: Installation of 110kV HV-supply cable between existing substation and existing main transformer 110/20kV.oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site All ITEM(s) include equipment and system design, permission administration, excavating works, traffic control, residual and reconstruction roadworks, procurement of material/equipment/devices/work, deliv-ery, installation, testing and commissioning works at construction site excavating area restoration works
Vei- og kabeltrekking
Result
- Reason for cancellationAlle tilbud, forespørsler å delta eller prosjekter ble trukket tilbake eller funnet inadmissible
- 0Number of bids
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Total price and EHS
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Fortum Power and Heat Oy
From the notice
Fortum Power and Heat Oy is building a heat plant in Nuijala, Espoo and the connecting district heatinglines to distribute the heat to Espoo district heating network. Heat will be produced by electric boiler which is connected also to a heat accumulator (20 000m3), The heating capacity of the plant is approximately 50 MW (Megawatt).The new heat plant shall be ready for commercial operation in the end of 2025. The scope of supply comprises of the following ITEM(s) •ITEM 01: Installation of cable protection pipes for MV and HV-supply cables (cabling route length approx. 700m in urban area)oPermission administration, excavating works, traffic control, residual, reconstruction roadworks, excavating area restoration worksoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction site • ITEM 02: Installation of 20kV MV-supply cables between existing substation and existing medium voltage switchgear (20kV).oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site •ITEM 03: Installation of earthing continuity conductors and optical fibre pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction siteOPTION •ITEM 04: Installation of 110kV HV-supply cable between existing substation and existing main transformer 110/20kV.oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site All ITEM(s) include equipment and system design, permission administration, excavating works, traffic control, residual and reconstruction roadworks, procurement of material/equipment/devices/work, deliv-ery, installation, testing and commissioning works at construction site excavating area restoration works
Contact
mikael.savola@fortum.com- Result · PrequalificationType
- 45232000Main codeAncillary works for pipelines and cables