PROCUREMENT OF FACTORY 02 PRE-ENGINEERING DESIGN SERVICES: A contract award notice
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Apr 3, 2025Expired
- Award
- QUALITY 40%
Brief
PROJECT OVERVIEW: The Factory 02 (F02) project involves the development of a facility on a 7.5-hectare site in the Nordics, with approximately 14,000 m² to be built in Phase 1. The site will be developed in two phases, each featuring six bioreactors. The full project cycle is estimated to take 47 months. OBJECTIVES AND STRUCTURE: The project follows a Front-End Loading (FEL) process to thoroughly understand the project and reduce changes during execution. This will take 12 months from January to December 2025,covering two key phases: alternative assessment and process design freeze, with the end goal of an advanced conceptual design package. SCOPE AND PROJECT DELIVERABLES: An advanced conceptual design package, cost estimate, and integrated project plans that cover permitting, engineering, procurement, and construction schedules.
Arkitekttjenester
Result
- BLUE PROJECTS INDUSTRIES SRLWinner
- 9Number of bids
- €626,832Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
The Contracting Entity will compare and score the prices based on the price given in Annex 3, tab “Team Estimate and Prices”. The comparison price is the price calculated in the section “price total € VAT 0 %”.
Evaluation Method
The cheapest tender in the comparison is assigned a comparison price score of 60.
Source
No source found in the documents. Check the weight against the tender documents.
Description
The Contracting Entity will compare and score the quality points based on the risk assessment described in Annex 2 (Risk Evaluation). The risk assessment is based on two (2) factors: 1. Annex 3 (Specification of procurement and Pricelist) submitted by the tenderer; and 2. Implementation plan submitted by the tenderer.
Evaluation Method
The quality points of the tender are calculated using a formula: (Tenderer’s score / the score of the tender with the lowest score) X (-40) points. Note! The quality points are negative (-). Finally, the price and quality comparison scores are summed up, and the tenderer with the best total score wins. In case of a tie, the winner is the tender with the most quality comparison scores.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at SOLAR FOODS OY
From the notice
PROJECT OVERVIEW: The Factory 02 (F02) project involves the development of a facility on a 7.5-hectare site in the Nordics, with approximately 14,000 m² to be built in Phase 1. The site will be developed in two phases, each featuring six bioreactors. The full project cycle is estimated to take 47 months. OBJECTIVES AND STRUCTURE: The project follows a Front-End Loading (FEL) process to thoroughly understand the project and reduce changes during execution. This will take 12 months from January to December 2025,covering two key phases: alternative assessment and process design freeze, with the end goal of an advanced conceptual design package. SCOPE AND PROJECT DELIVERABLES: An advanced conceptual design package, cost estimate, and integrated project plans that cover permitting, engineering, procurement, and construction schedules.
Contact
eveliina.roysky@ptcs.fi- ResultType
- 71240000Main codeArchitectural, engineering and planning services