Ireland: Tenders/Tuath Housing Association Ltd/Proposed Renovation of the existing Mount Saint Mary's Convent of Mercy Building (Protected Structure) to provide 18 no. Social Housing Apartments.
  1. Competition notice published

    Sep 8, 2025 7:48 AMSeptember 8, 2025 7:48 AM
  2. Questions deadline

    Oct 6, 2025 11:00 AMOctober 6, 2025 11:00 AM
  3. Qualification deadline

    Oct 16, 2025 11:00 AMOctober 16, 2025 11:00 AM
  4. Tender submission deadline

    Comes with the invitation

Brief

Proposed Renovation of the existing Mount Saint Mary's Convent of Mercy Building (Protected Structure) to provide 18 no. Social Housing Apartments.

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Oct 16, 2025Expired
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€6.5Mover 18 months

Brief

Tuath Housing Association Ltd needs renovation and extension works for the existing Mount Saint Mary's Convent of Mercy Building (a Protected Structure) to provide 18 social housing apartments, including 2 studios, 2 one-bedroom units, and 14 two-bedroom units. The total refurbishment area is approximately 1524 sqm, with an additional 150 sqm for the extension. The project also includes site works such as landscaped courtyards, drainage, retaining walls, planting, and an external bike and bin store. The contract has a maximum total value of 6,500,000 EUR and a duration of 18 months.

Anleggs- og infrastrukturbygging

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Tuath Housing Association Ltd

From the notice

  • Proposed Renovation of the existing Mount Saint Mary's Convent of Mercy Building (Protected Structure) to provide 18 no. Social Housing Apartments. The apartments mix will consist of 2 no. studios, 2 no one bedroom units and 14 no. two bedroom units. The total area for refurbishment is approximately 1524 sqm (of which approximately 35 sqm relates to the Chapel section of the building). To facilitate the above works to the fabric of the Protected Structure will also be undertaken. Proposed Extension to the Protected Structure to include a new lift, stairwells and connecting corridors. The area of the extension is approximately 150 sqm Proposed Site Works to include landscaped courtyards, drainage, retaining walls and planting. The works will also include an external bike and bin store.

  • Contact

    m.mcnamara@tuathhousing.ie
  • Type
    Competition · Prequalification
  • Main code
    Footpath construction work
    45233161
  • 45000000Construction work45111000Demolition, site preparation and clearance work45211100Construction work for houses45220000Engineering works and construction works45233253Surface work for footpaths45262800Building extension work45300000Building installation work45310000Electrical installation work45330000Plumbing and sanitary works45350000Mechanical installations45453100Refurbishment work

Similar active competitions

  • Good Shepherd Cork

    Boligbygg og boligprosjekter

    Domestic Violence Refuge and Social Housing at Evergreen Road, Turner’s Cross, Cork

    Good Shepherd Cork needs construction services for the renovation and extension of an existing convent building to provide a Domestic Violence Refuge with associated services and 20 accommodation units, as well as the construction of two new 4-storey residential blocks with 32 apartments and all associated parking, roads, and ancillary services. The project, located in Turner's Cross, Cork, has a maximum total value of 22,000,000 EUR and a duration of 30 months. Tenderers are required to submit three options, including a phased delivery and a "DVR only" option.

    Competition
    Nov 25, 2026(18 days)
    €22,000,000
  • Milltown Housing Association Ltd

    Doctor Mc Garry Housing Milltown Phase 2

    Milltown Housing Association Ltd needs construction services for a one-bedroom single-storey dwelling house and the creation of an apartment in part of the existing community centre, including all ancillary site development works, at Carton, Miltown, Co. Galway. The project has a maximum total value of 700,000 EUR and a duration of 15 months.

    Competition
    Nov 6, 2026(0 days)
    €700,000
  • Val Touraine Habitat

    Arkitekttjenester

    NOTRE DAME D'OE « Rue de la Bretonnière » - Mission de Maîtrise d'oeuvre pour la démolition, le désamiantage et la construction de 31 logements collectifs

    Val Touraine Habitat recherche une équipe de maîtrise d’œuvre pour une opération de 48 mois à Notre-Dame-d’Oé, en Indre-et-Loire, d’une valeur maximale totale de 4,857 millions d’euros. Le marché porte sur la démolition et le désamiantage, puis la construction de 31 logements collectifs (13 T2, 13 T3 et 5 T4), conformes à la RE 2020 avec un niveau de performance anticipé pour 2028 (Bbio -10 %) et une analyse du cycle de vie à fournir en phase AVP. La mission couvre les phases ESQ, APS, APD, PRO, AMT, VISA/EXE partielle, DET et AOR, ainsi que des prestations complémentaires de pré-étude BA, de traitement de la signalétique et de diagnostic PEMD.

    Competition
    Dec 3, 2026(26 days)