Public tender offshore wind PPA
Expired
The competition has expired without a winner being announced.
- Deadline
- Sep 30,Expired
- Award
- Price only
Brief
N.V. Nederlandse Gasunie needs electricity supplies from a new offshore wind farm for a duration of 10 years, starting either on 1-1-2029 or 1-1-2030. The contracted capacity is 40 MW for the full duration, with mutual options for an additional 10 MW for the EemsEnergyTerminal from 1-1-2029/30 until 2036 (with possible extension), and a maximum of 10 MW to be mutually agreed upon during the contract term for at least one year. The electricity, including associated and traceable Guarantees of Origin (GoOs), shall be physically delivered to Gasunie. The award criterion is the lowest all-in price for the delivery of electricity and GoOs, weighted at 100%.
Elektrisitet og energiforvaltning
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
The lowest all-in price for the delivery of electricity and GoO's will be awarded
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at N.V. Nederlandse Gasunie
From the notice
Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years. The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization: 1. Mutual option for EemsEnergyTerminal when FID is taken - 10 MW from 1-1-2029/30 till 2036 with the possibility to be extended till the end of the contract term. 2. Mutual option to facilitate minor portfolio increases: maximum of 10 MW to be mutually agreed upon during the contract term with a duration of at least one year The electricity shall be physcially delivered to Gasunie including the associated and traceable GoO's. For more information about the procedure, contract and how to receive the tender documents please refer to Ariba. 1-1-2029/30 - 2038/39: 40 MW 1-1-2029/30 - 2036: mutual option of 10 MW for EET During the contract term a maximum of 10 MW may be included based on mutual agreement
Contact
Annelieke van Engelenhovenannelieke.van.engelenhoven@gasunie.nl- CompetitionType
- 09310000Main codeElectricity