Search
  • Search


Ireland: Tenders/Raheen Group Water Scheme/Raheen Group Water Scheme Watermain Replacement
  1. Competition notice published

    Sep 28, 9:57 AMSeptember 28, 2026 9:57 AM
  2. Questions deadline

    Oct 22, 12:00 PMOctober 22, 2026 12:00 PM
  3. Change in competition

    Nov 11, 9:04 AMNovember 11, 2026 9:04 AM
  4. Tender submission deadline

    Jan 29, 2027 12:00 PMJanuary 29, 2027 12:00 PM
  5. Tender validity period

    May 29, 2027 12:00 PMMay 29, 2027 12:00 PM

Brief

Raheen Group Water Scheme Watermain Replacement

Deadline
Jan 29, 202777 days left
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€900Kover 4 months

Brief

Raheen Group Water Scheme needs works to replace approximately 2.3 km of existing watermain and install a new booster pump station, including ancillary works, in Ireland’s Mid-West region. The project has a maximum total value of €900,000 and a duration of 4 months.

Oppføring av bygninger

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Raheen Group Water Scheme

From the notice

  • The project involves the replacement of circa 2.3km of existing watermain, together with installation of new booster pump station and ancillary works

  • Contact

    raheengws2026@gmail.com
  • Type
    Competition
  • Location
    Mid-West
  • Main code
    Works for complete or part construction and civil engineering work
    45200000

Similar active competitions

  • Tooreen Aghamore GWS

    Rørlegger- og sanitærarbeid

    Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2

    Tooreen Aghamore GWS needs water network improvement works in Ireland’s Western Region over 6 months, with a maximum contract value of €500,000. The works comprise replacing and installing water distribution pipelines, consumer water meters and bulk flow meters, including data loggers. The contract will be awarded to the most economically advantageous tender based on quality and price.

    Competition
    Dec 11, 2026(28 days)
    €500,000
  • New Inn Group Water Scheme 2

    Rørlegger- og sanitærarbeid

    New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village

    New Inn Group Water Scheme 2 needs water-main construction works in Ireland, with a maximum total contract value of €350,000 and a 2-month duration. The project involves installing approximately 1,860 metres of 200 mm PE100 SDR11 rising water main in New Inn Village and carrying out work on approximately 2 km of the existing 63 mm PE80 SDR11 water main. The scheme supplies potable water to 350 houses, and the work is located in Ireland’s western region.

    Competition
    Nov 18, 2026(5 days)
    €350,000
  • Dunsallagh/Killernan GWS

    Prosjekteringstjenester

    Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure

    Dunsallagh/Killernan GWS needs consulting engineering services over 2 years for an infrastructure upgrade in the West of Ireland, with a maximum total contract value of €460,000. The project involves upgrading approximately 5 km of existing 2-inch watermain to 4-inch across two sections: about 2.6 km from Doonsallagh West to the R474, and about 2.5 km westward from the junction of Knockbrack Road and the R427. Services include surveying, design, tendering and evaluation, contract administration, site supervision, and performing the PSDP role.

    Competition
    Nov 16, 2026(3 days)
    €460,000