Find

  • All tenders
France: Tenders/SYNCHROTRON SOLEIL/Réalisation et fourniture de blocs d'aimants permanents en samarium-cobalt pour SOLEIL II

Réalisation et fourniture de blocs d'aimants permanents en samarium-cobalt pour SOLEIL II

Expired

The competition has expired without a winner being announced.

Deadline
27. juliExpired
Procedure
OpenSingle stage
Agreement
Buying goodsover 48 weeks

Brief

SYNCHROTRON SOLEIL a besoin de la fabrication, des essais, de l'emballage et de la livraison de 9 800 blocs d’aimants permanents en Samarium-Cobalt (Sm2Co17) pour les dipôles normaux longs et les dipôles superbend de l’anneau de stockage de SOLEIL II. Le contrat a une durée de 48 semaines.

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at SYNCHROTRON SOLEIL

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Fabrication, essais, emballage et livraison de 9 800 blocs d’aimants permanents en Samarium-Cobalt (Sm2Co17) pour les dipôles normaux longs et les dipôles superbend de l’anneau de stockage de SOLEIL II

  • Contact

    achats@synchrotron-soleil.fr
  • Type
    Competition
  • Location
    Essonne
  • Main code
    Magnets
    31630000

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    On site support activities and supply of Test Coils

    Fusion for Energy needs a framework contract for 8 years covering on-site support for ITER magnets—including preservation, preventive maintenance, cold testing and assembly—and the manufacture of test coils. The procurement is for supplies, with on-site work at ITER; the notice does not specify a contract value or award criteria.

    Framework agreement with qualification
    30. nov. 2026(6 days)
  • Paul Scherrer Institut (PSI)

    Magnet mit horizontaler Feldausrichtung und extrem breitem Strahlzugang für Neutronenstreuexperimente

    Paul Scherrer Institute (PSI) needs a custom high-field magnet system for neutron-scattering research at the Swiss Spallation Neutron Source (SINQ), to be installed in Aargau, Switzerland. The system must provide a maximum horizontal field strength of 6 T and at least 315° of cumulative horizontal beam access, with asymmetric openings allowing use across SINQ instruments. It is to be optimized for intensity mapping with large-area position-sensitive detectors on the CAMEA spectrometer and DMC and ZEBRA diffractometers.

    Competition
    22. des. 2026(28 days)
  • Ministère de la Transition énergétique

    Elektrisitet og energiforvaltning

    Appel d’offres portant sur la réalisation et l’exploitation d’installations de production d’électricité à partir de l’énergie solaire et situées dans les zones non interconnectées

    l’appel d’offres porte sur la réalisation et l’exploitation d’installations de production d’électricité à partir de l’énergie solaire et situées dans les zones non interconnectées. En vertu du 2º de l’article L. 311-12, les candidats retenus désignés par le ministre chargé de l’énergie bénéficient d’un contrat de complément de rémunération à l’électricité produite, établi selon les dispositions des articles L. 311-13-2 à L. 311-13-4 du code de l’énergie et selon les modalités précisées par le présent cahier des charges.

    Competition
    29. des. 2028(100+ days)