Find

  • All tenders
Tender search/Serbian Railway Infrastructure JSC/Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, section Stalac -Dunis. Lot 2

Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, section Stalac -Dunis. Lot 2

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Dec 17, 2025Expired
Award
Procedure
With prequalificationTwo stages
Agreement
Construction workover 68 months

Brief

„Serbian Railways Infrastructure“ JSC je dodelio ugovor konzorcijumu GULERMAK AGIR SANAYI İNSAAT VE TAAHHUT A.S. & YSE Yapı Sanayi ve Ticaret A.S. za radove na rekonstrukciji i modernizaciji postojeće železničke pruge i izgradnji drugog koloseka železničke pruge Beograd – Niš, deonica Stalać – Đuniš. Radovi obuhvataju projektovanje i izgradnju dvokolosečne pruge u dužini od 17,77 km, uključujući rekonstrukciju postojećeg i izgradnju drugog koloseka za maksimalnu brzinu od 160 km/h, izgradnju tunela 1, 2, 3 i 5 korišćenjem NATM metode, kao i izgradnju izlaza za hitne slučajeve za tunel broj 1. Ugovor, čija je vrednost 348.905.039 evra, trajaće 68 meseci.

Grunnarbeid og anleggsvirksomhet

Result

TED
  • Advanced Electrical Systems
    Winner
  • Number of tenders received
    3
  • Contract value
    €348,905,039

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Serbian Railway Infrastructure JSC

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    This is the lowest price of technically compliant tender.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Scope of the procurement includes design-build activities for reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, section Stalac -Dunis. The total length of the of the line is 17.77km of a double-track railway and will be consisted (but not limited to) of the following main activities: - Preparation of design documentation in accordance with the Serbian regulations - Reconstruction of the exiting railway track and construction of the second railway track for a maximum designed speed of 160km/h. - Construction of the tunnels 1, 2, 3 and 5 using the NATM design and construction method. - Construction of the Emergency Exit shafts for tunnel number 1 with two exist points on each side of the railway, - The scope of works includes all the necessary tunnelling and civil works, electrification, and temporary signalling and telecommunication.

  • Contact

    Janko KovljanicJanko.kovljanic@srbrail.rs
  • Type
    Result · Prequalification
  • Main code
    Railway construction works
    45234100

Similar active competitions

  • Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)

    Grunnarbeid og anleggsvirksomhet

    Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII

    Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI) needs construction services for approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, as part of Corridor VIII, over 84 months. The project includes the construction of Kriva Palanka station, Zidilovo halt/station, 21 tunnels (totaling approximately 8.5 km), 51 bridges/viaducts (totaling approximately 5 km), permanent way, earthworks, drainage, retaining structures, access roads, and associated civil and interface works. The railway will have a maximum design speed of 100 km/h. Participants must be duly constituted, incorporated, or registered in accordance with the laws of their country of establishment and provide evidence of their legal status and registration. They must also submit an undertaking to obtain any project-specific licenses, permits, certificates, or authorizations required by the Republic of North Macedonia if awarded the contract.

    Competition
    Jan 20, 2027(56 days)
  • Limited Liability Company “Putevi Srbije” Belgrade

    Rådgivende ingeniørtjenester for bygg og anlegg

    Supervision of Rehabilitation Works of Local Roads under SIRN

    LLC “Putevi Srbije” needs consulting services to supervise rehabilitation works on local roads under SIRN over 3 years, with a maximum total contract value of EUR 2.13 million. The procurement covers engineering and construction supervision; supplier qualifications are to be assessed against requirements in the procurement documents, including relevant professional education and qualifications. Price is not the sole award criterion; all evaluation criteria are specified in the procurement documents.

    Competition
    Dec 15, 2026(20 days)
    €2,130,000
  • Valsts akciju sabiedrība "Latvijas dzelzceļš"

    Jernbane- og infrastrukturbygging

    Dzelzceļa pasažieru infrastruktūras modernizācija 2.posms, Pārogre – Skrīveri (6 stacijas): būvniecība

    Valsts akciju sabiedrība “Latvijas dzelzceļš” iepērk būvdarbus dzelzceļa pasažieru infrastruktūras modernizācijas 2. posmam posmā Pārogre–Skrīveri, atjaunojot sešas stacijas. Darbi paredzēti Vidzemē, un līguma termiņš ir 1 gads. Piedāvājumus vērtēs pēc cenas (90%) un projekta vadītāja papildu pieredzes objektos (10%).

    Competition
    Jan 4, 2027(40 days)