All tenders/Transport Administration/Reconstruction of M2 Berane – tunnel “Lokve” - Rožaje

Reconstruction of M2 Berane – tunnel “Lokve” - Rožaje

Awarded

The competition has ended and a winner has been selected.

Award
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€59.7Mover 4 years

Brief

Uprava za saobraćaj je dodelila ugovor kompanijama Makimsan Asfalt Taahhut Insaat San. ve Tic. A.S. i XINGTAI Road and Bridge Construction Group Co. Ltd za rekonstrukciju glavnog puta M-2, od Berana do Rožaja, u ukupnoj dužini od 30,7 km, podeljenog u dve deonice. Rekonstrukcija obuhvata put, projektovanje i izgradnju 4 postojeća tunela, projektovanje i izgradnju 1 mosta, sanacione mere za 12 mostova, te rekonstrukciju/izgradnju 76 potpornih zidova. Ugovor je vredan 53.676.543 € i trajaće 48 meseci. Na tenderu su pristigle 4 ponude.

Road Construction and Asphalt Work

Result

TED
  • Jones Business Systems_10064
    Winner
  • div. Rahmenvertragspartner
    Winner
  • Number of tenders received
    4
  • Contract value
    €53,676,543

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Transport Administration

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Lowest price among technically compliant tenders.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The subject of this Contract is reconstruction of main road M-2, from Berane to Rožaje, in total length of 30.7km divided in two sections approximately of cca 15km length. Reconstruction includes reconstruction of the road, design and building of 4 existing tunnels, design and building of 1 bridge and remedial measures for 12 bridges, reconstruction/construction of 76 retaining walls.

  • Contact

    Milena Lopičićmilena.lopicic@uzs.gov.me
  • Type
    Result
  • Main code
    Construction work for highways, roads
    45233100

Similar active competitions

  • “Monteput” doo Podgorica

    Road Construction and Asphalt Work

    TEN-T Route 4, BBH, Smokovac-Tolosi Section (Podgorica Bypass)

    „Monteput“ doo Podgorica planira nabavku radova na projektovanju i izgradnji produžetka koridora Orijent/Istok-Mediteran: Putna ruta 4 – Auto-put Bar-Boljare – deonica Smokovac – Tološi (obilaznica Podgorice), u maksimalnoj vrednosti od 240 miliona EUR i predviđenom trajanju od 4 godine.

    Planning
    29. nov. 2026(2 days)
    €240,000,000
  • Railway Infrastructure of Montenegro JSC - Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)

    Groundwork and construction activities

    Rehabilitation of 11 Steel Bridges on the “Vrbnica – Bar” railway line in Montenegro

    Rehabilitation of eleven steel railway bridges on the Vrbnica – Bar railway line in Montenegro, carried out while the line remains in commercial operation; work that needs the track is done within the daily line closures set out in the Tender Document. The Works are divided into two Lots (Lot#1, nine bridges; Lot#2, two bridges), and a separate contract is signed for each Lot. Each Tender shall cover both Lots, and both contracts will be awarded to the same Tenderer. The contracts are financed by a loan of the European Investment Bank and by investment grants of the Western Balkans Investment Framework (WBIF), and each is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999, as amended by the Particular Conditions of Contract.

    Competition
    2. feb. 2027(67 days)
    €28,000,000
  • MINISTRSTVO ZA INFRASTRUKTURO IN ENERGETIKO, DIREKCIJA REPUBLIKE SLOVENIJE ZA INFRASTRUKTURO

    Road and Rail Infrastructure

    A-55/26; Regionalna cesta RT-927/5502 Žibovt-Sv. Duh-Podolševa; od km 2.936 do km 7.120

    Ministrstvo za infrastrukturo in energetiko, Direkcija Republike Slovenije za infrastrukturo, naroča gradbena dela na regionalni cesti RT-927/5502 Žibovt–Sv. Duh–Podolševa, na odseku od km 2,936 do km 7,120 v Savinjski regiji. Dela naj bi trajala 540 dni, vrednost naročila ni navedena, edino merilo za oddajo pa je cena; podrobnosti obsega in zahtev so določene v razpisni dokumentaciji.

    Competition
    9. des. 2026(12 days)