Rectangular blind flanges for the focal plane chambers of the SFRS
Awarded
The competition has ended and a winner has been selected.
- Award
- Production, weight 21 and 2 more
- Procedure
- OpenSingle stage
- Agreement
- Buying goodsover 6 months
Brief
FAIR - Facility for Antiproton and Ion Research in Europe GmbH hat einen Vertrag mit STREICHER, spol. s r.o. Plzen über die Lieferung von rechteckigen Blindflanschen für die Brennebenenkammern des Super-FRS in Darmstadt, Kreisfreie Stadt, Deutschland, für einen Zeitraum von 6 Monaten und einem Wert von 100.200 € abgeschlossen. Bei der Vergabe wurden die Produktionsbeschreibung, die Qualitätssicherung und die Einhaltung des Zeitplans bewertet.
Result
- STREICHER, spol. s r.o. PlzenWinner
- 2Number of tenders received
- €100,200Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
BGB company with joint and several liability with listing of all members and their authorised representatives incl. naming of an authorised representative who shall represent the consortium in a legally binding manner vis-à-vis the Contracting authority. The tender must be accompanied by a legally binding declaration signed by all joint members that the lead firm, as authorised representative, represents the joint members listed before the Contracting authority and is jointly and severally liable, having an effect on each member, for performing the service in accordance with the contract.
Documentation Requirement
Declaration signed by all joint members.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Consideration of the price through the valuation method "Preis-Quotient-Methode"
Source
No source found in the documents. Check the weight against the tender documents.
Description
- Description of how dimensional tolerances and technical requirements will be met. - Overwiev of production steps and technical equipment. - Confirmation of mechanical precision capability.
Source
No source found in the documents. Check the weight against the tender documents.
Description
- Explanation of QA processes applied to manufacturing and acceptance tests. - Compliance with FAIR quality standards and documentation. - Identification of potential project risks and mitigation strategies.
Source
No source found in the documents. Check the weight against the tender documents.
Description
- Clear commitment to delivery timeline with milestone planning. - Assessment of readiness: production, materials and supply chain. - Logistical planning: shipping, packaging and handling.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Construction and testing of rectangular blind flanges for beam-diagnostic insert ports located on the top of the Super-FRS focal-plane chambers
Contact
proekf35@gsi.de- ResultType
- Darmstadt, Kreisfreie StadtLocation
- 31643000Main codeParticle accelerators