Find

  • All tenders
All tenders: Ireland/The Rotunda Hospital/Refurbishment of Nurses’ Home Bathrooms and Shower Rooms

Refurbishment of Nurses’ Home Bathrooms and Shower Rooms

Expired

The competition has expired without a winner being announced.

Deadline
Oct 30, 2025Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€300Kover 6 months

Brief

The Rotunda Hospital needs refurbishment services for existing bathrooms, showers, and WC facilities in the Nurses’ Home (West Block) in Dublin, Ireland, over a period of 6 months, with a maximum total value of 300,000 EUR. The project includes demolition and removal of existing sanitary ware, partitions, cubicles, showers, baths, WHBs, risers, ceilings and finishes, and installation of new level-access showers, wall-hung WCs, wash hand basins, IPS panels, sanitary fittings, and associated pipework. It also involves provision of new Altro Aquarius R11 non-slip flooring, Whiterock finishes, and suspended ceilings with moisture-resistant tiles, as well as mechanical works (new hot/cold pipework, isolation valves, drainage, ventilation fans and connections to existing services) and electrical works (replacement of light fittings with IP-rated LED, testing and commissioning). Fire-stopping to risers and penetrations and general builder’s work, access and protection in a live acute hospital environment are also required. All works must be carried out to current Building Regulations, HBN/HTM guidance, and infection control standards, including Part M compliant level-access showers and sanitary fittings.

Construction - Erection, Renovation and Maintenance of Buildings

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The Rotunda Hospital

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The project comprises the refurbishment of existing bathrooms, showers, and WC facilities in the Nurses’ Home (West Block), Rotunda Hospital. Works include: Demolition and removal of existing sanitary ware, partitions, cubicles, showers, baths, WHBs, risers, ceilings and finishes. Installation of new level-access showers, wall-hung WCs, wash hand basins, IPS panels, sanitary fittings, and associated pipework. Provision of new Altro Aquarius R11 non-slip flooring, Whiterock finishes, and suspended ceilings with moisture-resistant tiles. Mechanical works including new hot/cold pipework, isolation valves, drainage, ventilation fans and connections to existing services. Electrical works including replacement of light fittings with IP-rated LED, testing and commissioning. Fire-stopping to risers and penetrations. General builder’s work, access and protection in a live acute hospital environment. Part M compliant level-access showers and sanitary fittings All works are to be carried out to current Building Regulations, HBN/HTM guidance, and infection control standards

  • Contact

    suemurphy@rotunda.ie
  • Type
    Competition
  • Location
    Dublin
  • Main code
    Building construction work
    45210000
  • 45211310Bathrooms construction work45310000Electrical installation work45330000Plumbing and sanitary works45430000Floor and wall covering work

Similar active competitions

  • Marymount University Hospital and Hospice

    Civil engineering and infrastructure construction

    FIRE REMEDIAL AND REINSTATEMENT WORKS AT MARYMOUNT UNIVERSITY HOSPITAL AND HOSPICE

    Marymount University Hospital and Hospice requires fire remedial and reinstatement works at its hospital and hospice in Ireland’s South-West region. The works contract has a duration of 1 year and a maximum total value of €8 million.

    Competition
    Dec 21, 2026(25 days)
    €8,000,000
  • Health Service Executive (HSE)

    Construction - Erection, Renovation and Maintenance of Buildings

    EST_MW - Maternity Emergency and Early Pregnancy Assessment Unit - University Maternity Hospital Limerick

    The Health Service Executive (HSE) needs construction works for an 18-month development at University Maternity Hospital Limerick in the Mid-West region of Ireland, with a maximum total contract value of €10 million. The project involves a new rapid-build facility of approximately 863 m² over two floors, including maternity emergency and assessment services, diagnostic scanning, labour induction, intensive care and procedure facilities, alongside staff and support areas. Works also include refurbishing approximately 263 m² of the existing main entrance and Medical Emergency Unit, upgrading the entrance and forecourt, landscaping, and constructing a replacement car park.

    Competition with qualification
    Dec 14, 2026(18 days)
    €10,000,000
  • Coimisiún na Meán

    Building work and installations

    Dynamic Purchasing System for Energy Efficiency Retrofitting Works

    The National Council for Special Education needs energy efficiency retrofitting works for a maximum total value of 130,000,000 EUR over 96 months. This Dynamic Purchasing System is established by the Local Government Operational Procurement Centre, acting as a central purchasing body under Kerry County Council, for various contracting authorities.

    Dynamic purchasing system
    Mar 30, 2029(100+ days)
    €130,000,000