The Rotunda Hospital needs refurbishment services for existing bathrooms, showers, and WC facilities in the Nurses’ Home (West Block) in Dublin, Ireland, over a period of 6 months, with a maximum total value of 300,000 EUR. The project includes demolition and removal of existing sanitary ware, partitions, cubicles, showers, baths, WHBs, risers, ceilings and finishes, and installation of new level-access showers, wall-hung WCs, wash hand basins, IPS panels, sanitary fittings, and associated pipework. It also involves provision of new Altro Aquarius R11 non-slip flooring, Whiterock finishes, and suspended ceilings with moisture-resistant tiles, as well as mechanical works (new hot/cold pipework, isolation valves, drainage, ventilation fans and connections to existing services) and electrical works (replacement of light fittings with IP-rated LED, testing and commissioning). Fire-stopping to risers and penetrations and general builder’s work, access and protection in a live acute hospital environment are also required. All works must be carried out to current Building Regulations, HBN/HTM guidance, and infection control standards, including Part M compliant level-access showers and sanitary fittings.