    Reinvestment in 200–300 MVA synchronous condensers within existing 400 kV HVDC stations - 25/17888

    Energinet Eltransmission A/S

    Reinvestment in 200–300 MVA synchronous condensers within existing 400 kV HVDC stations - 25/17888

    1. Planning notice published

      Mar 5, 9:09 AMMarch 5, 2026 9:09 AM
    2. Contract start date

      Oct 28, 2030 12:00 AMOctober 28, 2030 12:00 AM
    3. Planned competition start

      Oct 28, 2030 12:00 AMOctober 28, 2030 12:00 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Reinvestment in 200–300 MVA synchronous condensers within existing 400 kV HVDC stations - 25/17888

    Planned

    The competition has not been announced yet.

    Deadline
    Jul 5,Expired
    Agreement
    Buying goods

    Brief

    Energinet Eltransmission A/S planlægger geninvestering i tre eksisterende synkrone kondensatorer på 200-300 MVA, placeret ved 400 kV HVDC-stationer på Sjælland og Fyn, med fokus på enten fuld geninvestering eller udskiftning af statorer. Leverandører opfordres til at deltage i en markedsdialog for at give input til projektmodning, kvalificere løsningsretningen og vurdere leveringsevne inden for de kommende 3-5 år, herunder løsninger der kan integreres i eksisterende bygninger og minimere nedetid. EthosEnergy Poland SA har sandsynligvis en lignende kontrakt i dag.

    Elektrisk utstyr og belysning

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • Energinet is considering carrying out a reinvestment in three existing synchronous condensers located at HVDC high voltage stations on Zealand and Funen. As part of this process, Energinet wishes to engage in a market dialogue with up to 5 relevant suppliers regarding the possibility of procurement and delivery capability within the coming 3–5 years. The dialogue aims to support project maturation, qualify the final solution direction, and establish a solid foundation for the upcoming reinvestment decision. In the current phase of the project, two overall reinvestment scenarios are being examined: • Full reinvestment in the synchronous condensers, or • Replacement of the stators, if this is assessed to be technically and economically sufficient. It is assumed that new equipment can be integrated into existing buildings and station areas. If the market's proposals involve modifications to buildings or adjacent components, an assessment of the expected scope of required adaptations is requested. It should also be expected that the control and protection systems will need to be reinvested. A key and highly prioritised consideration for Energinet is the total outage time associated with the removal of the existing machines and the commissioning of the new units. Outage periods have significant impact on the operation of the power system, including security of supply, and Energinet therefore places particular emphasis on suppliers’ assessments of installation and commissioning processes, as well as measures to minimise the critical period during which the units are out of service. For reference, an overview of one of the existing machines’ main specifications is provided (note that the nominal power rating varies slightly between machines): • Machine code: SGEN 100A 2P • Speed: 3,000 rpm • Rated voltage UN: 15.75 kV (+5/–5%) • Rated current IN: 9,898 A • Rated power SN: 270 MVA • Insulation class: F • Temperature rise class: B • Duty rating: S1 • Connection: Y/Y – 48 bars, two layers, transposed Roebel bars • Stator insulation type: GVPI • Stator insulation system: Micalastic® MICA tapes In the next phase of the market dialogue, sketch drawings of the three relevant stations and synchronous condensers will be shared, and it will also be possible to visit one of the sites. Energinet wishes to understand suppliers’ ability to deliver equipment in accordance with the above description, as well as their ability to adapt solutions to existing installations. Energinet also seeks insight into the products and solutions currently available on the market or expected to become available within the next 3–5 years that may support Energinet’s needs. Finally, an indication of the expected economic magnitude of the procurement and indicative delivery times is requested.

    • Contact

      Procurement - Bprocurement@energinet.dk
    • Type
      Planning
    • Main code
      Electricity distribution and control apparatus
      31200000

    Similar active competitions

    • Energinet

      Kraftforsyning og reservestrøm

      Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023

      Energinet is planning the procurement of approximately 200 standardized Emergency Power Stations (EPS) for its stations across Denmark, which will include diesel-powered emergency generator systems delivered in compact technical buildings. Suppliers can provide feedback and input to the buyer by submitting written responses to the "Market dialogue Emergency Power Systems - Questions and answers" document, and Energinet may also conduct follow-up meetings with selected suppliers.

      Planning
    • KONSTANT Net A/S

      Elektrisk infrastruktur og veibelysning

      Kvalifikationsordning, Komponenter med tilknyttede ydelser til 60 kV anlæg

      KONSTANT Net A/S søger leverandører til en kvalifikationsordning for komponenter med tilknyttede ydelser til 60 kV anlæg, der skal leveres i hele KONSTANT Net A/S' forsyningsområde i Østjylland. Kvalifikationsordningen omfatter en række kategorier, herunder krafttransformere, shunt-reaktorer, slukkespoler, primære koblingsanlæg, måletransformere, adskillere og jordsluttere samt GIS og AIS anlæg. Der stilles krav om en soliditetsgrad på mindst 15% og positiv egenkapital i det senest afsluttede årsregnskab.

      Qualification system
      Dec 31, 2056(100+ days)
    • Banedanmark

      Elektrisk infrastruktur og veibelysning

      Upcoming procurement of two traction transformers for Kassø substation

      Banedanmark is planning the procurement of two single-phase traction transformers for the railway power supply at Kassø substation in southern Denmark, including transport, installation, site testing, and commissioning. Suppliers are invited to participate in a market dialogue to discuss lead times, technical feasibility, and commercial terms by contacting the provided contact person. Meetings with interested suppliers are expected to take place in week 37.

      Planning