Find

  • All tenders
All tenders: Ireland/Office of Public Works (OPW)/Remediation Works at Ardara Bridge National Monument Cadamstown Co. Offaly

Remediation Works at Ardara Bridge National Monument Cadamstown Co. Offaly

Expired

The competition has expired without a winner being announced.

Deadline
May 5,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€834.3Kover 5 months

Brief

The Office of Public Works (OPW) needs remediation works at Ardara Bridge National Monument in Cadamstown, Co. Offaly, with a maximum total value of 834,300 EUR over 5 months. The project involves stabilizing a failed slope, excavating the slope and removing existing gabion baskets, constructing a new foundation for a wing wall, extending soils and installing mesh to rebuild the embankment, installing horizontal drains, constructing a new masonry wing wall, extending existing walls, surface finishing, and general repair work. The works will be completed on the downstream side of the bridge only. The contractor is responsible for providing all labor, plant resources, temporary works, access, and materials.

Bygg og anlegg - Bruer og tunneler

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Office of Public Works (OPW)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Leverandøren må være registrert i et foretaksregister, faglig register eller et handelsregister i den staten leverandøren er etablert.

    Documentation Requirement

    Leverandøren skal fremlegge bevis på registrering.

    Source

    No source found in the documents. Check the requirement against the tender documents.

From the notice

  • In summary, the works involved in this project generally consist of the following: • Installation of self-drilling soil nails and mesh to stabilise the failed slope. • Excavation of failed slope and removal of the existing gabion baskets on site, including provision of temporary works propping to support steel arch frame which has one leg erected on the gabions. • Construction of a new foundation for the failed wing wall. • Extension of the soils and installation of mesh to re-build embankment to required height. This will be typical of a reinforced soil embankment with mesh finishing using a ‘bottom-up’ construction sequence • Installation of horizontal drains to allow groundwater to drain from the slope. • Construction of new masonry wing wall. • Extending top of existing walls on site. • Surface finishing. • Reinstatement, pointing and general repair work as required. The works will be completed on the downstream side of the bridge only with no disturbance to the existing conditions on the northern side which is considered in good condition. The Contractor shall provide all labour and plant resources for construction of the Works unless otherwise stated. All temporary works and access are the responsibility of the contractor The Contractor shall note that due to the requirement to work on steep side slopes considerable temporary works may be required to ensure the works are done in a safe manner. The Contractor shall supply all materials required for the temporary and permanent Works. The Contractor shall include for the costs of these temporary works, including design, in their rates and prices.

  • Contact

    ita.griffin@opw.ie
  • Type
    Competition
  • Location
    South-East
  • Main code
    Construction work for bridges
    45221100
  • 45000000Construction work45112300Infill and land-reclamation work45112400Excavating work45262210Foundation work45453000Overhaul and refurbishment work92522000Preservation services of historical sites and buildings92522100Preservation services of historical sites

Similar active competitions

  • Kildare County Council_385

    Anleggs- og infrastrukturbygging

    Newbridge Southern Ring Road and Bridge for Kildare County Council

    Kildare County Council needs civil engineering construction works for the Newbridge Southern Ring Road and Bridge, with a project duration of 18 months and a maximum total contract value of €18 million. The works comprise 790 metres of new road, including a five-span bridge approximately 170 metres long across the River Liffey, connections to existing roads and utilities, underground utilities, public lighting, and associated works. Construction will take place in a live environment in the Mid-East region of Ireland.

    Competition with qualification
    Nov 30, 2026(4 days)
    €18,000,000
  • Iarnród Eireann-Irish Rail

    Tekniske kontrolltjenester

    9146 Qualification System for Railway Bridge Assessment

    Iarnród Eireann-Irish Rail needs engineering consulting services for railway bridge assessments at various locations throughout the IE Rail Network in Ireland. The services involve regular monitoring and analysis of approximately 3000 railway bridges to ensure safety and reliability, assess structural performance for heavier loads, and advise on route clearances for rolling stock. The contract duration is 7 years. The buyer intends to issue a multi-party, multi-lot Framework Agreement from this Qualification System to qualified companies in the future.

    Qualification system
    Jan 28, 2031(100+ days)
  • Limerick City and County Council_103432

    Rådgivende ingeniørtjenester for bygg og anlegg

    Limerick City and County Council Consultancy Services for the inspection, design, procurement, construction and handover phases of Bridge Rehabilitation Works in County Limerick 2027 - 2031

    Limerick City and County Council needs consultancy services for bridge rehabilitation projects throughout County Limerick, covering inspection, planning, design, tender evaluation and procurement, construction, and handover. The contract is for 1 year, with three optional 1-year extensions (1+1+1+1), subject to funding and satisfactory performance, and has a maximum total value of €400,000. PUNCH Consulting Engineers holds the previous similar consultancy contract.

    Competition
    Dec 7, 2026(11 days)
    €400,000