Remediation Works at Ardara Bridge National Monument Cadamstown Co. Offaly
Expired
The competition has expired without a winner being announced.
- Deadline
- May 5,Expired
- Procedure
- OpenSingle stage
Brief
The Office of Public Works (OPW) needs remediation works at Ardara Bridge National Monument in Cadamstown, Co. Offaly, with a maximum total value of 834,300 EUR over 5 months. The project involves stabilizing a failed slope, excavating the slope and removing existing gabion baskets, constructing a new foundation for a wing wall, extending soils and installing mesh to rebuild the embankment, installing horizontal drains, constructing a new masonry wing wall, extending existing walls, surface finishing, and general repair work. The works will be completed on the downstream side of the bridge only. The contractor is responsible for providing all labor, plant resources, temporary works, access, and materials.
Bygg og anlegg - Bruer og tunneler
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Office of Public Works (OPW)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Leverandøren må være registrert i et foretaksregister, faglig register eller et handelsregister i den staten leverandøren er etablert.
Documentation Requirement
Leverandøren skal fremlegge bevis på registrering.
Source
No source found in the documents. Check the requirement against the tender documents.
From the notice
In summary, the works involved in this project generally consist of the following: • Installation of self-drilling soil nails and mesh to stabilise the failed slope. • Excavation of failed slope and removal of the existing gabion baskets on site, including provision of temporary works propping to support steel arch frame which has one leg erected on the gabions. • Construction of a new foundation for the failed wing wall. • Extension of the soils and installation of mesh to re-build embankment to required height. This will be typical of a reinforced soil embankment with mesh finishing using a ‘bottom-up’ construction sequence • Installation of horizontal drains to allow groundwater to drain from the slope. • Construction of new masonry wing wall. • Extending top of existing walls on site. • Surface finishing. • Reinstatement, pointing and general repair work as required. The works will be completed on the downstream side of the bridge only with no disturbance to the existing conditions on the northern side which is considered in good condition. The Contractor shall provide all labour and plant resources for construction of the Works unless otherwise stated. All temporary works and access are the responsibility of the contractor The Contractor shall note that due to the requirement to work on steep side slopes considerable temporary works may be required to ensure the works are done in a safe manner. The Contractor shall supply all materials required for the temporary and permanent Works. The Contractor shall include for the costs of these temporary works, including design, in their rates and prices.
Contact
ita.griffin@opw.ie- CompetitionType
- South-EastLocation
- 45221100Main codeConstruction work for bridges
- 45000000Construction work45112300Infill and land-reclamation work45112400Excavating work45262210Foundation work45453000Overhaul and refurbishment work92522000Preservation services of historical sites and buildings92522100Preservation services of historical sites