    RENEWAL OF ECONOMIZER TO KIVENLAHTI BIO-HEATING PLANT, ESPOO FINLAND

    Fortum Power and Heat Oy

    RENEWAL OF ECONOMIZER TO KIVENLAHTI BIO-HEATING PLANT, ESPOO FINLAND

    1. Competition notice published

      Jan 30, 2023 10:00 AMJanuary 30, 2023 10:00 AM
    2. Express interest deadline

      Feb 20, 2023 11:00 AMFebruary 20, 2023 11:00 AM
    3. Qualification deadline

      Not stated
    4. Tender submission deadline

      Feb 20, 2023 11:00 AMFebruary 20, 2023 11:00 AM
    5. Invitation to submit tender

      Feb 23, 2023 11:00 PMFebruary 23, 2023 11:00 PM
    6. Tender validity period

      May 20, 2023 10:00 AMMay 20, 2023 10:00 AM

    Brief

    Finland: Tenders/Fortum Power and Heat Oy/RENEWAL OF ECONOMIZER TO KIVENLAHTI BIO-HEATING PLANT, ESPOO FINLAND

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    Feb 20, 2023Expired
    Procedure
    Competitive dialogueTwo stages
    Agreement
    Buying goodsover 4 months

    Brief

    Turnkey delivery of economizer to Kivenlahti bio-heating plant. Kivenlahti K4-boiler was commissioned in 2020. The fuel power of the boiler is 49 MW. The fuel is solid wood fuels which consist of recycled wood, forest biomass (forest residues, hard wood chips) and industrial by-products (bark, saw dust). The boiler produces heat to the district heating network of Espoo. The boiler is connected to the district heating network with a heat exchanger. The boiler is a water boiler equipped with a stream drum. The steam is used only for the boiler’s own use. The design pressure and temperature of the boiler is 16 bar (g) and 204 °C.  The boiler has two economizers, both situated in the second pass of the boiler. The economizer to be renewed is the latter one in relation to flue gas flow, consisting of finned tubes: water going in approximately 110-130 °C and flue gas going out approximately 130-180 °C. The current tube material is P235GH or equivalent to this. The economizer needs to be renewed because of suspected damage done by steam soot blowers.

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Fortum Power and Heat Oy

    From the notice

    • Turnkey delivery of economizer to Kivenlahti bio-heating plant. Kivenlahti K4-boiler was commissioned in 2020. The fuel power of the boiler is 49 MW. The fuel is solid wood fuels which consist of recycled wood, forest biomass (forest residues, hard wood chips) and industrial by-products (bark, saw dust). The boiler produces heat to the district heating network of Espoo. The boiler is connected to the district heating network with a heat exchanger. The boiler is a water boiler equipped with a stream drum. The steam is used only for the boiler’s own use. The design pressure and temperature of the boiler is 16 bar (g) and 204 °C. The boiler has two economizers, both situated in the second pass of the boiler. The economizer to be renewed is the latter one in relation to flue gas flow, consisting of finned tubes: water going in approximately 110-130 °C and flue gas going out approximately 130-180 °C. The current tube material is P235GH or equivalent to this. The economizer needs to be renewed because of suspected damage done by steam soot blowers.

    • Contact

      Samu Väisänensamu.vaisanen@fortum.com
    • Type
      Competition · Prequalification
    • Main code
      Auxiliary plant for use with boilers
      42164000

    Similar active competitions

    • AMW Sinevia Sp. z o.o.

      Kjøle- og ventilasjonsteknologi

      3.2.2 KOMPLEKSOWA OBSŁUGA SYSTEMU CIEPŁOWNICZEGO

      AMW SINEVIA Sp. z o.o. planuje zamówienie kompleksowej obsługi systemów ciepłowniczych w różnych lokalizacjach, w tym w Lublinie, Tarnobrzegu, Lesku, Wólce Gościeradowskiej, Siemierowicach, Orzyszu, Węgorzewie, Giżycku, Szerokim Borze, Hajnówce, Osowcu, Kołobrzegu, Chełmnie, Grubnie, Bożenkowie, Gdyni, Darłowie, Bobolinie, Komprachcicach i Ostrej Górze. Zamówienie obejmuje również usługi serwisowe w kilku jednostkach wojskowych. Celem jest zapewnienie kompleksowej obsługi i serwisu systemów ciepłowniczych.

      Planning
      Dec 31, 2026(63 days)
    • AMW Sinevia Sp. z o.o.

      Engroshandel med rørleggerartikler og byggevarer

      2.2.7 NAJEM KOTŁOWNI KONTENEROWYCH

      AMW SINEVIA Sp. z o.o. planuje zamówienie na wynajem kotłowni kontenerowych wraz z magazynami oleju opałowego w różnych lokalizacjach, takich jak Tarnowskie Góry - Lasowice, Kuźnia Raciborska, Niedźwiedź, Kłaj, Gałkówek, Nowy Glinnik, Nowy Dwór Wejherowski, Gdynia Redłowo, Toruń i Darłowo. Zamówienie dotyczy dostaw i ma trwać 1 rok.

      Planning
      Dec 31, 2026(63 days)
    • Wörgl Wärme GmbH

      Wörgl Wärme GmbH - Generalunternehmer Kesseltechnik – Biomasseheizwerk Wörgl West

      Die Wörgl Wärme GmbH benötigt Generalunternehmer-Leistungen für die Kesseltechnik des Biomasseheizwerks Wörgl West in Tiroler Unterland. Der Vertrag hat eine Laufzeit von 12 Monaten. Die Vergabe erfolgt nach den Kriterien Preis (65%) und Qualität (35%).

      Competition with qualification
      Oct 30, 2026(1 day)