Replacement of emergency doors in the Great Belt Tunnel
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Jun 22, 2022Expired
- Award
- Design 25% and 2 more
Brief
The contract includes replacement of emergency doors in the Great Belt tunnel. The Great Belt Tunnel consists of two main pipes connected by 31 transverse tunnels, the two outermost of which are direct passage. The current emergency doors that were fitted in the mid-ninetieth are worn out and need to be replaced.
Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger
Result
- Ludwig Elkuch AGWinner
- 0Number of bids
- Not statedContract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Source
No source found in the documents. Check the weight against the tender documents.
Description
Design
Source
No source found in the documents. Check the weight against the tender documents.
Description
Detailed Time Schedule
Source
No source found in the documents. Check the weight against the tender documents.
Description
Service and Maintenance
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at A/S Storebælt
From the notice
The contract includes replacement of emergency doors in the Great Belt tunnel. The Great Belt Tunnel consists of two main pipes connected by 31 transverse tunnels, the two outermost of which are direct passage. The current emergency doors that were fitted in the mid-ninetieth are worn out and need to be replaced.
Contact
SBF - Louise Hilton Saggaulhi@SBF.DK- Result · PrequalificationType
- 44221220Main codeFire doors
- 35110000Firefighting, rescue and safety equipment51100000Installation services of electrical and mechanical equipment