Search

  • Search


    Request for Tender for the Installation and Insulation of Duct Work at SmartPly Europe DAC ‘25

    SmartPly Europe DAC

    Request for Tender for the Installation and Insulation of Duct Work at SmartPly Europe DAC ‘25

    1. Competition notice published

      Apr 11, 11:41 AMApril 11, 2025 11:41 AM
    2. Questions deadline

      Apr 25, 2:00 PMApril 25, 2025 2:00 PM
    3. Opening date

      May 1, 11:30 PMMay 1, 2025 11:30 PM
    4. Tender submission deadline

      May 2, 2:00 PMMay 2, 2025 2:00 PM

    Brief

    Ireland: Tenders/SmartPly Europe DAC/Request for Tender for the Installation and Insulation of Duct Work at SmartPly Europe DAC ‘25

    Expired

    The competition has expired without a winner being announced.

    Brief

    Rådgivende ingeniørtjenester for bygg og anlegg

    SMARTPLY Europe DAC is seeking suitably qualified Engineering Companies to install Ducting at our plant in Belview Port, Slieverue, via Waterford. It is envisaged that the works will take place during the SmartPly’s Annual Shutdown, 25th of August – 4th of September 2025. Please note that the successful Bidder is responsible for the Installation of the Ducting (Free Issue – Ducting will be Procured in advance by Smartply from the OEM), Including the supply, delivery and fitting of the Insulation material and lagging, as well as any materials, components, plant and labour to complete the works as set-out in the Scope of Works. Due to the nature of works as set out in this Tender and other maintenance + construction activity being carried out on site, these have been deemed to be ‘’CONSTRUCTION WORK’’ as per the HSA’s Safety Health and Welfare at Work (Construction) Regulations 2013. The successful Bidder will operate as “CONTRACTOR’’ and will be required to provide site specific Risk Assessments, Method Statements, Training + Induction Records and Plant Certification, or other requested Information associated with the works, too the PSCS. Client: SmartPly – Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux – 051 831 420 PSDP + PSCS: SmartPly - Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux – 051 831 420 The Contractor is responsible for the following… 1. Removal of existing Ducting and Insulation 2. Installation of 11 pieces of SS duct Ø710 (Free Issue) (Total length ~32m) 3. Source + supply Rockwool (150mm) insulation, galvanised wire netting and lagging and steel banding. 4. Fitting of insulation and lagging to new ducting 5. Managing construction site and traffic Management 6. All Lifting Equipment and Access platforms to carry out works. 7. Preliminaries and Insurance 8. Commissioning 9. Handover Documentation 10. Health + Safety General Description of Medite Facility Procedure Lockout-tag out (LOTO) or lock and tag is a safety procedure which is used in industry to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work. It requires that hazardous power sources be "isolated and rendered inoperative" before any repair procedure is started. "Lock and tag" work in conjunction with a lock usually locking the device or the power source with the HASP and placing it in such a position that no hazardous power sources can be turned on. The procedure requires that a tag be affixed to the locked device indicating that it should not be turned on. 1. Supply and Fit Insulation and lagging. It is recommended to, as far as practical, fitting the insulation and lagging prior to duct pieces installation. It is the contractor’s responsibility to complete the following works: • RockWool insulation (150mm) or 3 layers of 50mm (Ø710 x 33 meters) • Galvanised Metal netting to secure Insulation in place • Aluminium Lagging (Non painted) • Stainless Steel Banding to secure lagging in place. • Watertight joints between lagging sections 2. Removal of existing ducting and Installation of new ducting. It is the contractor’s responsibility to complete the following works: • Removal of existing insulation and ducting. (Existing ducting has deteriorated to a critical level. Extreme care should be taken when removing duct sections. – This should also be recorded in the RAMS for prior approval) • Installation of new SS304 Ducting including gaskets and bolts (All free issue) • Start-up Support (Gas Leaks, vibration, etc.) ** Please see the full and Completed Scope of Works in Tender Document attached **

    About the bid

      SMARTPLY Europe DAC is seeking suitably qualified Engineering Companies to install Ducting at our plant in Belview Port, Slieverue, via Waterford. It is envisaged that the works will take place during the SmartPly’s Annual Shutdown, 25th of August – 4th of September 2025. Please note that the successful Bidder is responsible for the Installation of the Ducting (Free Issue – Ducting will be Procured in advance by Smartply from the OEM), Including the supply, delivery and fitting of the Insulation material and lagging, as well as any materials, components, plant and labour to complete the works as set-out in the Scope of Works. Due to the nature of works as set out in this Tender and other maintenance + construction activity being carried out on site, these have been deemed to be ‘’CONSTRUCTION WORK’’ as per the HSA’s Safety Health and Welfare at Work (Construction) Regulations 2013. The successful Bidder will operate as “CONTRACTOR’’ and will be required to provide site specific Risk Assessments, Method Statements, Training + Induction Records and Plant Certification, or other requested Information associated with the works, too the PSCS. Client: SmartPly – Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux – 051 831 420 PSDP + PSCS: SmartPly - Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux – 051 831 420 The Contractor is responsible for the following… 1. Removal of existing Ducting and Insulation 2. Installation of 11 pieces of SS duct Ø710 (Free Issue) (Total length ~32m) 3. Source + supply Rockwool (150mm) insulation, galvanised wire netting and lagging and steel banding. 4. Fitting of insulation and lagging to new ducting 5. Managing construction site and traffic Management 6. All Lifting Equipment and Access platforms to carry out works. 7. Preliminaries and Insurance 8. Commissioning 9. Handover Documentation 10. Health + Safety General Description of Medite Facility Procedure Lockout-tag out (LOTO) or lock and tag is a safety procedure which is used in industry to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work. It requires that hazardous power sources be "isolated and rendered inoperative" before any repair procedure is started. "Lock and tag" work in conjunction with a lock usually locking the device or the power source with the HASP and placing it in such a position that no hazardous power sources can be turned on. The procedure requires that a tag be affixed to the locked device indicating that it should not be turned on. 1. Supply and Fit Insulation and lagging. It is recommended to, as far as practical, fitting the insulation and lagging prior to duct pieces installation. It is the contractor’s responsibility to complete the following works: • RockWool insulation (150mm) or 3 layers of 50mm (Ø710 x 33 meters) • Galvanised Metal netting to secure Insulation in place • Aluminium Lagging (Non painted) • Stainless Steel Banding to secure lagging in place. • Watertight joints between lagging sections 2. Removal of existing ducting and Installation of new ducting. It is the contractor’s responsibility to complete the following works: • Removal of existing insulation and ducting. (Existing ducting has deteriorated to a critical level. Extreme care should be taken when removing duct sections. – This should also be recorded in the RAMS for prior approval) • Installation of new SS304 Ducting including gaskets and bolts (All free issue) • Start-up Support (Gas Leaks, vibration, etc.) ** Please see the full and Completed Scope of Works in Tender Document attached **Main features of the procedureTender Document

      Contact phone
      051 831427
      Contact email
      John.Browne@mdfosb.com
      Address
      Bellview, X91 PX75 Slieveure

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    SmartPly Europe DAC
    Title
    Request for Tender for the Installation and Insulation of Duct Work at SmartPly Europe DAC ‘25
    Type
    CompetitionPrequalification
    Main code
    71333000Mechanical engineering services
    Supplemental codes
    45255400Fabrication work45351000Mechanical engineering installation works71300000Engineering services
    Location
    Dublin
    Estimated value
    €50,000.00

    Active similar competitions

    • SmartPly Europe DAC

      Veiskilt og trafikkutstyr

      Essential Upgrade Works at SmartPly Europe DAC 26

      SmartPly Europe DAC needs construction services for minor construction work packages at its manufacturing facility in Belview, Slieveure, Waterford, Ireland. The works, with a maximum total value of 400,000 EUR, are expected to be completed over approximately four months and primarily address Health and Safety, Environmental, and operational requirements across the production facility. The project is divided into four separate lots based on the nature and type of the projects.

      CompetitionOct 5, 2026
      Oct 26, 2026(17 days)
      €400,000