Search
  • Search


    Retendering - 25/11232 - In-line services of gas transmission pipeline

    Energinet Gastransmission A/S

    Retendering - 25/11232 - In-line services of gas transmission pipeline

    1. Competition notice published

      Sep 25, 2025 10:33 AMSeptember 25, 2025 10:33 AM
    2. Express interest deadline

      Oct 3, 2025 10:00 AMOctober 3, 2025 10:00 AM
    3. Qualification deadline

      Oct 3, 2025 10:00 AMOctober 3, 2025 10:00 AM
    4. Tender submission deadline

      Not stated

    Brief

    Denmark: Tenders/Energinet Gastransmission A/S/Retendering - 25/11232 - In-line services of gas transmission pipeline

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Deadline
    Oct 3, 2025Expired
    Agreement
    Buying services

    Brief

    Energinet Gastransmission A/S needs in-line services for a 115 km 10-inch gas transmission pipeline from Everdrup to Nakskov. The services include a cleaning and gauging survey to identify obstructions, followed by an in-line inspection to log the geometry and condition of the pipeline. The inspection must be performed by a single combined tool capable of logging both pipe geometry and anomalies like metal loss.

    Register interest in EU Supply

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Gastransmission A/S

    From the notice

    • This specification details the scope of work and the technical specifications for equipment, personnel and the reporting requirements when conducting in-line service of Energinet 115km 10in gas transmission pipe line from Everdrup to Nakskov hereinafter "The line". The Provider must perform in-line service comprising a cleaning and gauging survey, and a subsequent in-line inspection of The line. The cleaning and gauging survey shall clean and identify any obstructions in The line in advance of the in-line inspection. The in-line inspection shall log the geometry and condition of The line. The in-line inspection shall be performed by a single combined tool capable of logging both pipe geometry and anomalies (e.g. metal loss).

    • Type
      Competition
    • Main code
      Pipeline-inspection services
      76600000

    Similar active competitions

    • Gas Networks Ireland

      Rørinspeksjon og VA-vedlikehold

      25/002 - Provision of Onshore and or Nearshore Inspection Services

      The Contracting Entity is seeking applications from suitably experienced inspection companies to carry out offshore, nearshore and onshore inspection surveys of two submarine gas transmission pipelines each approximately 200km long, Scotland to Ireland from shore to shore, and one spur and one umbilical approximately 11km long to the Isle of Man. The network cathodic protection is provided by means of sacrificial aluminium alloy half shell bracelet anodes. The network entire lengths are either trenched, or rockdumped in lieu of trenching. The seabed is varied and includes sandwaves towards the Scottish end. The maximum water depth is approximately 140 metres. The inspection scope requires vessels equipped for visual inspection, acoustic examination, cathodic protection monitoring and the assessment of the disposition of the pipeline relative to the seabed. There is also a requirement for a capability for conducting intervention tasks involving the removal of seabed debris and/or freespan rectification and maintenance capability for a subsea tee in approximately 30 metres water depth. There is a further requirement for a capability to mobilise an offshore diving spread to conduct subsea intervention tasks using divers. There will also be a requirement to mobilise at short notice for unplanned debris surveys of the pipelines as required.

      Qualification system
      Jun 27, 2028(100+ days)
    • AB "Amber Grid"

      (VPP-1145) Magistralinio dujotiekio vamzdynų vidinės ertmės valymo įtaisų dalys

      AB „Amber Grid“ perka magistralinių dujotiekių vidinės ertmės valymo įtaisų dalis pagal 3 metų sutartį, kurios maksimali bendra vertė – 150 000 eurų. Dalys bus skirtos magistraliniams dujotiekiams valyti; tiekimo vieta – Vilniaus apskritis.

      Competition with qualification
      Nov 3, 2026(5 days)
      €150,000
    • Netz Niederösterreich GmbH

      Diverse konstruksjonsmateriell

      Prüfsystem Lieferung Rohre aus Polyethylen PE 100 für erdverlegte Gasleitungen DA 32 bis DA 225

      Netz Niederösterreich GmbH benötigt ein Prüfsystem für die Lieferung von Polyethylen-Rohren (PE 100) für erdverlegte Gasleitungen mit einem Außendurchmesser von DA 32 bis DA 225, die im Versorgungsgebiet von Netz Niederösterreich eingesetzt werden sollen.

      Qualification system
      Jul 28, 2029(100+ days)