Ireland: Tenders/The Rotunda Hospital/Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS

Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS

Expired

The competition has expired without a winner being announced.

Deadline
Oct 17, 2025Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€12Mover 1 year

Brief

The Rotunda Hospital needs enabling works for a new Critical Care Wing in Dublin, Ireland, with a maximum total value of 12,000,000 EUR over 1 year. This project involves extensive demolition, groundworks, piling, civils works, and essential services diversions, including the relocation of existing medical gases and HVAC plant, asbestos removal, installation of new services and ICT plant, and construction of a new permanent central concourse vehicular access ramp and pedestrian access stairs. The works are intended to maximize preparation for the main Critical Care Wing project.

Bygg og anlegg - Helsevesen, tinghus og demning

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The Rotunda Hospital

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Rotunda Hospital plans to develop a new Critical Care Wing on the existing Rotunda Hospital campus. This project will entail the construction of a new 4 storey over basement, 10,000m2 new build acute critical care wing and the refurbishment of approximately 2,000m2 of existing acute hospital facilities within the existing main hospital. The proposed location for the new Critical Care Wing is on the site of the existing single storey outpatient and diagnostics radiology department and the main entrance ramp and pedestrian stairs to the internal campus concourse. In addition, the nature of the proposed site for the location of the new Critical Care Wing, means that there are a significant number of existing live services and utilities including plant and equipment either within or adjacent to the proposed site that will need to be relocated. It is proposed that the new Critical Care Wing would be delivered under four separate contract phases including 1. New Outpatient Department - completed in an off-campus location in early 2025 2. Temporary Radiology Department Building currently under construction on campus 3. Critical Care Wing Enabling Works - subject of this SAQ 4. New Critical Care Wing and Associated Refurbishment Works planning granted August 2025 This SAQ is for the Critical Care Wing Enabling Works the purpose of which is maximise the extent of demolition, ground works, piling, civils works, and essential services diversions undertaken in advance of the main Critical Care Wing project. The outline scope and sequence of works required to be completed as part of the Critical Care Wing Enabling works is as follows 1. Services plant, services distribution and below ground utilities diversions from under the existing central concourse vehicular access ramp and to the north side of the existing campus including initial temporary followed by permanent diversions of services and associated civils works. 2. Relocation of existing medical gases and HVAC plant and equipment to newly constructed plant compound to north end of campus. 3. Removal and safe disposal of asbestos content lagging materials from pipework within existing services tunnel once pipework has been made redundant. 4. Install new services and ICT plant and equipment within existing live hospital building elsewhere on campus such as the 'Nurses Building' and 'Mortuary' to the north side of the campus. 5. Secant pile wall along eastern end of the proposed new Critical Care Wing building. 6. Construction of new permanent central concourse vehicular access ramp and pedestrian access stairs. 7. Demolition of existing single storey outpatient department building. 8. Demolition of existing concourse vehicular access ramp and pedestrian stairs. 9. Secant pile wall to northern, western and southern end of the proposed new Critical Care Wing building. 10. Bulk excavation of site of proposed new Critical Care Wing building

  • Contact

    suemurphy@rotunda.ie
  • Type
    Competition
  • Location
    Dublin
  • Main code
    Hospital facilities construction work
    45215140
  • 45000000Construction work45210000Building construction work

Similar active competitions

  • Health Service Executive (HSE)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    EST_MW - Maternity Emergency and Early Pregnancy Assessment Unit - University Maternity Hospital Limerick

    The Health Service Executive (HSE) needs construction works for an 18-month development at University Maternity Hospital Limerick in the Mid-West region of Ireland, with a maximum total contract value of €10 million. The project involves a new rapid-build facility of approximately 863 m² over two floors, including maternity emergency and assessment services, diagnostic scanning, labour induction, intensive care and procedure facilities, alongside staff and support areas. Works also include refurbishing approximately 263 m² of the existing main entrance and Medical Emergency Unit, upgrading the entrance and forecourt, landscaping, and constructing a replacement car park.

    Competition with qualification
    Dec 14, 2026(20 days)
    €10,000,000
  • Health Service Executive (HSE)

    Bedriftsrådgivning

    National Maternity Hospital at St Vincent’s University Hospital Programme Delivery Partner Services Prior Information Notice

    The Health Service Executive (HSE) is planning to procure delivery partner services for the National Maternity Hospital programme at St Vincent’s University Hospital in Dublin, supporting its team across construction, equipping, digital delivery, commissioning and transition to operations. The notice does not specify how suppliers can provide feedback or participate in the planning phase.

    Planning
    Feb 26, 2027(94 days)
    €0
  • Health Service Executive (HSE)

    Arkitekttjenester

    Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW04: Acute Healthcare Capital Works – project value €15M - €60M excl. VAT for Dublin North, Swords Office

    The Health Service Executive (HSE) seeks design team services through a four-year, multi-party framework for acute healthcare capital projects valued at €15 million–€60 million excluding VAT in the Dublin North area, administered by its Swords office. The initial indicative project is a new Adult Inpatient Unit at Connolly Hospital, Blanchardstown. The framework has a maximum total estimated value of €600 million and is divided into nine lots: architect (including planning and BIM information management), quantity surveyor, building services engineer, civil/structural engineer, fire safety consultant, Project Supervisor Design Process, Employer’s Representative, Energy Efficient Design Facilitator and Assigned Certifier. The procurement uses a restricted procedure, with expressions of interest invited from suitably qualified providers.

    Framework agreement with qualification
    Dec 3, 2026(9 days)
    €600,000,000