Search
  • Search


France: Tenders/DYNACITE/SEGNY Centre Village construction de 55 logements
  1. Competition notice published

    May 2, 2025 6:20 AMMay 2, 2025 6:20 AM
  2. Contract signed

    Jun 1, 12:00 AMJune 1, 2026 12:00 AM
  3. Result notice published

    Jun 17, 12:50 PMJune 17, 2026 12:50 PM

Brief

SEGNY Centre Village construction de 55 logements

Awarded

The competition has ended and a winner has been selected.

Deadline
Jun 16,Expired
Award
Organisation et méthodologie 21% and 1 more
Procedure
OpenSingle stage
Agreement
Construction workover 35 months

Brief

DYNACITE a attribué un contrat à ENTREPRISE BONGLET, DESBIOLLES, K2G, GIROD MORETTI, ORIGINAL TRAVAUX, ARBAN SARL, NINET GAVIN, SETO, STRM, TTB FACADES, MONTAGE THIRY MAINTENANCE, AIN CARRELAGES, ORONA et ENTREPRISE PAYSAGE ANDRE VERDET pour la construction de 55 logements à SEGNY Centre Village, en France. Le contrat a une durée de 35 mois et une valeur finale de 5 500 272 €. Les critères d'attribution incluaient la qualité de l'exécution du marché (évaluée sur la base du mémoire technique), l'organisation et la méthodologie du candidat pour le respect des délais et le bon déroulement des opérations (également évaluées sur la base du mémoire technique), et le prix des prestations.

Byggmester, tømrere- og snekker arbeid

Result

TED
  • AIN CARRELAGES
    Winner
  • ARBAN
    Winner
  • BONGLET SAS
    Winner
  • GIROD MORETTI
    Winner
  • K2G
    Winner
  • Number of tenders received
    1
  • Contract value
    €5,500,272

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    La qualité de l'exécution du marché, notée sur 200 points, est déterminée à partir du mémoire technique.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    L'organisation et la méthodologie du candidat permettant le respect des délais et un déroulement fluide des opérations, notées sur 200 points, sont déterminées à partir du mémoire technique.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Le prix des prestations, noté sur 200 points.

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at DYNACITE

From the notice

  • SEGNY Centre Village construction de 55 logements

  • Contact

    Pôle Commande Publiquei.favris@dynacite.fr
  • Type
    Result
  • Location
    Ain
  • Main code
    Construction work
    45000000
  • 45112500Earthmoving work45112700Landscaping work45223220Structural shell work45261100Roof-framing work45261420Waterproofing work45313100Lift installation work45330000Plumbing and sanitary works45410000Plastering work45421000Joinery work45431000Tiling work45443000Facade work

Similar active competitions

  • SEQENS SOCIETE ANONYME D'HABITATIONS A LOYER MODERE

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    TRAVAUX DE REHABILITATION DE 538 LOGEMENTS EN MILIEU OCCUPE - QUARTIER DES LOCHERES

    SEQENS SOCIETE ANONYME D'HABITATIONS A LOYER MODERE a besoin de travaux de réhabilitation pour 538 logements en milieu occupé dans le quartier des Lochères, Val-d’Oise, pour une durée de 18 mois. Les offres seront évaluées sur la base de la valeur technique (40%) et du prix des prestations (60%).

    Competition
    Nov 24, 2026(5 days)
  • OFFICE PUBLIC HABITAT COM AGGLO LA ROCHELLE

    Arkitekttjenester

    Mission de maîtrise d'oeuvre pour la construction de 30 logements – La Noue – Ars en Ré

    L’Office public de l’habitat de la communauté d’agglomération de La Rochelle recherche une équipe de maîtrise d’œuvre pour concevoir et accompagner la construction de 30 logements à La Noue, à Ars-en-Ré, en Charente-Maritime. La mission de services durera 32 mois. Les offres seront évaluées selon la valeur technique (60 %) et le prix (40 %).

    Competition
    Dec 8, 2026(19 days)
  • Morbihan Habitat (56)

    Boligbygg og boligprosjekter

    26S0108 RELANCE - Construction de 18 logements collectifs en BRS (Bât B), 43 logements locatifs sociaux (Bât A et C) et un pôle parents enfants (Bât D) – La Sitelle à VANNES

    Morbihan Habitat prévoit la construction à Vannes, dans le Morbihan, de 18 logements collectifs en bail réel solidaire, de 43 logements locatifs sociaux et d’un pôle parents-enfants, pour un chantier d’une durée de 26 mois. L’évaluation portera sur le prix (60 %), la qualité technique (30 %, dont les moyens humains et matériels affectés au chantier et la note méthodologique, à 15 % chacun) et la valorisation environnementale du chantier (10 %).

    Competition
    Nov 20, 2026(1 day)