SFRS Beam Cacher 1+2 inner shielding
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Dec 2, 2025Expired
- Award
Brief
In total two frames around a beam catcher chamber need to be filled. Each one contains about 100 plates of 100mm thickness. The shape must be cut to fit around a tube (d = 300mm) running inside the frame. There are around 14 different shapes. The total mass er frame is about 21 tons.
Result
- ASTURFEITO SAUWinner
- 7Number of tenders received
- €280,585Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Berücksichtigung des Preises durch die Wertungsmethode "Preis-Quotient-Methode"
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
In total two frames around a beam catcher chamber need to be filled. Each one contains about 100 plates of 100mm thickness. The shape must be cut to fit around a tube (d = 300mm) running inside the frame. There are around 14 different shapes. The total mass er frame is about 21 tons.
Contact
b.neumayer@gsi.de- ResultType
- Darmstadt, Kreisfreie StadtLocation
- 31643000Main codeParticle accelerators