    Speciliazed WTG Support

    Ørsted Wind Power A/S

    Speciliazed WTG Support

    1. Contract signed

      29. mars kl. 00:0029. mars 2021 kl. 00:00
    2. Result notice published

      12. april kl. 08:0012. april 2021 kl. 08:00

    Brief

    Denmark: Tenders/Ørsted Wind Power A/S/Speciliazed WTG Support

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Rådgivende ingeniørtjenester for bygg og anlegg

    The overall scope of services is to perform • endoscopic inspections of components inside the nacelle, especially of detailed parts in gear boxes as bearing rollers and outer/inner rings in planetary stage and HSS bearings; • endoscopic inspections of main bearings, especially on SGRE DD6.0, for documenting abnormality of rollers, roller cache and inner/outer ring, but also the bearing sealing for leaks; • generator inspections, especially on 3.6, 4.0, DD6.0, V164 turbines for abnormalities on stator/rotor and connections inside; • uptower exchanges of components in generators and gear boxes. At Ørsted’s Offshore Wind Farms in UK, Germany, Denmark and the Netherlands that are currently in operation. The length of the framework agreements are until 31 December 2023 with an option of extension for 1 year.

    Result

    Number of bids
    0
    Contract value
    Not stated

    About the bid

      The overall scope of services is to perform • endoscopic inspections of components inside the nacelle, especially of detailed parts in gear boxes as bearing rollers and outer/inner rings in planetary stage and HSS bearings; • endoscopic inspections of main bearings, especially on SGRE DD6.0, for documenting abnormality of rollers, roller cache and inner/outer ring, but also the bearing sealing for leaks; • generator inspections, especially on 3.6, 4.0, DD6.0, V164 turbines for abnormalities on stator/rotor and connections inside; • uptower exchanges of components in generators and gear boxes. At Ørsted’s Offshore Wind Farms in UK, Germany, Denmark and the Netherlands that are currently in operation. The length of the framework agreements are until 31 December 2023 with an option of extension for 1 year.

      Contact name
      Morten Baaner
      Contact phone
      +45 24638122
      Contact email
      morba@orsted.dk
      Address
      Kraftvaerksvej 53, DK-7000 Fredericia

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Ørsted Wind Power A/S
    Title
    Speciliazed WTG Support
    Type
    ResultFramework agreementPrequalification
    Main code
    71315400Building-inspection services
    Supplemental codes

    No supplemental codes from buyer…

    Active similar competitions

    • Trianel Windkraftwerk Borkum GmbH & Co. KG

      Subsea Inspections 2027+

      Trianel Windkraftwerk Borkum GmbH & Co. KG needs subsea inspection services for offshore foundations and scour surveys of the seabed for 3 years (2027, 2028, 2029) with an optional prolongation for an additional 2+1 years. The services involve yearly ROV inspections. Award criteria are Quality (30%) and Price (70%). Suppliers must provide references on specified services.

      Competition with qualification21. sep. 2026
      21. okt. 2026(13 days)
    • WINDFARM SANKT-VITH

      Reparasjon og vedlikehold

      Operation and maintenance services for the Saint-Vith wind farm / Services d’exploitation et de maintenance du parc éolien de Saint-Vith

      WINDFARM SANKT-VITH needs operation and maintenance services for the 5 wind turbines (Vestas V90-2.0 MW Mk7, total capacity 10 MW) of the Saint-Vith wind farm for 8 years. The services include preventive and corrective maintenance, 24/7 remote monitoring, spare parts management, and monitoring data integration. The project location is Arr. Verviers — communes francophones.

      Framework agreement27. sep. 2026