St. Ciaran's Community School Kells

Expired

The competition has expired without a winner being announced.

Deadline
Aug 13,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€250Kover 7 months

Brief

St. Ciaran’s Community School (Kells) needs works for the decommissioning and replacement of existing emergency lighting and fire alarm systems, and the installation of new compliant systems, along with associated electrical and builder's works, over a period of 7 months, with a maximum total value of 250,000 EUR. The project involves remedial works to electrical boards, installation of a new cable carrier system, and thorough cleaning of the building upon completion. The contractor will also act as Project Supervisor Construction Stage.

Elektrisk infrastruktur og veibelysning

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Tailte Éireann

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • St. Ciaran’s Community School is a primary school that is located in Kells, Co. Dublin. The school is a two storey building consisting of classrooms, GP hall and technology block extending to 5,000m2. This project entails works in decommissioning and replacing the existing emergency lighting and fire alarm system installations throughout the building. Refer to the drawings for further information on the works to be carried out. The scope of the works will be as follows: • Remedial works to the existing electrical boards throughout the building to cater for the new emergency lighting installation. • Decommissioning and replacing of the existing emergency lighting installation throughout the building and installation of a new emergency lighting installation that shall be compliant with I.S. 3217:2023 throughout the building. • Decommissioning and replacing of the existing fire alarm installation throughout the building and installation of a new fire alarm installation that shall be compliant with I.S. 3218:2024 throughout the building. • Supply and installation of a new cable carrier system throughout the school building to cater for the proposed new fire alarm and emergency lighting installation to be installed. • The existing ICT system installation, intruder alarm system, PA system and CCTV system installation shall be retained throughout the building. • All electrical works as highlighted on the drawings and the specifications. • Thorough cleaning of the building via contract cleaners once all works are completed so that the building is clean and tidy for re-opening of the building for the new term. • All associated preliminaries for the project. Unit A6, M4 Business Park, Maynooth Road, Celbridge, Co. Kildare, W23 VFY7 (Tel: 01-6274103) ____________________________________________________________________________________________________________________________ _________________________________________________________________________________ • All associated decommissioning works. • All builders’ works associated with the above. See ‘Builders Work Schedule’ in ‘Volume C1 – Pricing Schedule’ for further details. • Acting as Project Supervisor Construction Stage for the project. • Carrying out all works in compliance with current health and safety regulations. • Any other works as identified on the drawings and the specifications.

  • Contact

    etenders@stciaranscs.ie
  • Type
    Competition
  • Location
    Mid-East
  • Main code
    Electrical installation work
    45310000

Similar active competitions

  • City of Dublin Education and Training Board

    Elektrisk infrastruktur og veibelysning

    Ballyfermot FET College South Campus – Emergency Electrical Upgrade and Fire Improvement Works - Phase 1

    City of Dublin Education and Training Board requires emergency electrical upgrade and fire improvement works at the operational Ballyfermot Further Education College South Campus in Dublin, under a 2-year contract with a maximum total value of €3 million. The works include phased electrical strip-out and rewiring; replacement of electrical distribution, lighting, fire alarms, ICT and Wi-Fi infrastructure, CCTV, access control and lightning protection; and fire compartmentation, fire stopping, fire doors and associated builders’ work, testing, commissioning, certification and reinstatement of finishes. Delivery must be phased to keep the College operating while maintaining life-safety systems, emergency routes and essential services.

    Competition
    Nov 27, 2026(5 days)
    €3,000,000
  • The High Court of Ireland

    and 2 others

    Ratoath Junior National School

    The High Court of Ireland requires electrical installation works throughout Ratoath Junior National School, to be completed over 9 months. The work includes power and general services, lighting and emergency lighting, protective systems, a new three-phase ESB supply, and two new ESB meters serving the Junior and Senior Schools; the project is located in Ireland’s Mid-East region.

    Competition
    Dec 16, 2026(24 days)
    €0
  • St. Brigid's National School (Singland)

    Byggeteknisk konsulentvirksomhet

    ST BRIGIDS NS LIMERICK APPOINTMENT OF DESIGN CONSULTANTS FOR SUMMER WORKS SCHEME

    St. Brigid’s National School (Singland) in Limerick needs a suitably qualified Chartered Building Services Engineering consultancy to lead the design team for a 1-year Climate Action Summer Works Scheme project, with a maximum total contract value of €81,300. The work includes upgrades to heating systems, domestic water services, electrical installations and building management controls, together with associated works. The consultant will develop designs and specifications, manage tendering and contract administration, inspect and certify the works, and coordinate a multidisciplinary design team as required. The project is located in Ireland’s Mid-West region.

    Competition
    Dec 7, 2026(15 days)
    €81,300