Find

  • All tenders

Search results

  • Tailte Éireann

    Elektrisk infrastruktur og veibelysning

    St. Ciaran's Community School Kells

    St. Ciaran’s Community School (Kells) needs works for the decommissioning and replacement of existing emergency lighting and fire alarm systems, and the installation of new compliant systems, along with associated electrical and builder's works, over a period of 7 months, with a maximum total value of 250,000 EUR. The project involves remedial works to electrical boards, installation of a new cable carrier system, and thorough cleaning of the building upon completion. The contractor will also act as Project Supervisor Construction Stage.

    CompetitionJul 23, 2026
    Aug 13, 2026(Expired)
    €250,000
  • Tailte Éireann

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Multi Party Framework Agreement for Construction Contracts with an estimated value of between €2,000,000 and €12,500,000

    The Irish Prison Service needs construction contracts for a multi-party framework agreement over 4 years, with an estimated total value between €2,000,000 and €12,500,000, and a maximum total value of €100,000,000. The agreement covers a range of projects within secure Justice sites in both the Open and Closed Estate, located in Midland.

    Framework agreement with qualificationNov 20, 2025
    Dec 22, 2025(Expired)
    €100,000,000
  • Tailte Éireann

    Anleggs- og infrastrukturbygging

    Multi Party Framework Agreement for Construction Contracts with an estimated value above €12,500,000

    The Irish Prison Services is seeking to establish a Multi Party Framework Agreement for Construction Contracts with an estimated value above €12,500,000. IPS require general Design and Build Contractors to deliver a range of projects within secure Justice sites in both the Open and Closed Estate. The Design and Build contractor will be required to develop the IPS concept designs to final design and fabrication with all necessary approvals and certification, excluding planning, through a process of engagement with the IPS Employers Representative’s, Resident Engineers and Clerk of Works for the turnkey solution. The framework agreement will be established on foot of an initial contract for a Design and Build Contract for Works at Cloverhill D Wing. Please refer to the documents for more details

    Framework agreement with qualificationJul 31, 2025
    Aug 15, 2025(Expired)
    €400,000,000
  • Tailte Éireann

    Trykksaker og design

    Personalised Bulk Print and Post Services

    The provision of personalised bulk print and post services related to the National Revaluation Programme.

    ResultJun 25, 2025
    Jun 24, 2025(Expired)
    €35,000
  • Tailte Éireann

    Programvareprodukter og lisenser

    Provision of and on-going support of a Customer Relationship Management SaaS Solution

    In summary, the Services comprise: configuration, installation, hosting, on-going support and training of a secured Customer Relationship Management (CRM) SaaS solution for the support of marketing, sales and operational activities.

    ResultDec 23, 2024
    Dec 22, 2024(Expired)
  • Tailte Éireann

    Systemutvikling og programmering

    HCL Domino/Notes development, support and related services

    The Courts Service has a significant inventory of HCL Notes based applications serving all areas of the organisation and are operational customer facing and back-office in nature. This tender seeks responses to provision of HCL Domino/Notes development, support and related services over the life of the contract.

    ResultAug 27, 2024
    Aug 26, 2024(Expired)
    €750,000
  • Tailte Éireann

    Mekaniske installasjoner

    West Wing Project, National Library of Ireland, Kildare Street, Dublin 2 (Mechanical Installation)

    Works shall include the installation of new stand alone Mechanical space heating and cooling system comprising of a multi function heat pump, providing low temperature hot water central heating and chilled water cooling to the West wing and proposed circulation space extension. Ventilation to be provided through a hybrid air handling unit plant with heat recovery function, distribution ductwork to all habitable spaces in the West wing as well as extract systems from areas that are prone to elevated levels of humidity and contaminants such as toilets, wet rooms, kitchens and storage areas. Mechanical smoke extract system to be installed in extension. Water services infrastructure in the existing building to be extended to serve the West wing and above ground drainage from all sanitary ware, appliances and above ground surface drainage. Fire fighting and protective services to be installed in compliance with regulations. A building management system is to be provided to monitor, meter and control mechanical plant and utilities as well as monitor internal environmental conditions (temperature, humidity, CO2 levels) while logging information on the central building management system in the existing building and on the cloud. The existing fire protection sprinkler system is to be extended from the existing system infrastructure in the main NLI building. Fire sprinkler to be installed and commissioned by suitably qualified contractor to also take design responsibility of system.

    Competition with qualificationJun 13, 2024
    Jul 5, 2024(Expired)
    €0
  • Tailte Éireann

    Elektrisk infrastruktur og veibelysning

    The Development of the West Wing of the National Library of Ireland, Kildare Street, Dublin 2

    Complete electrical installation for the refurbishment of the West Wing and ancilliary areas at the National Library of Ireland. Stage one of two stage restricted tender process. Stage one is call for expression of interest by submittal of SAQ's.

    Competition with qualificationJun 13, 2024
    Jul 5, 2024(Expired)
    €0