Ireland: Tenders/St. Muredach's College/St Muredach’s College, Ballina, Co Mayo (RN: 64510J) – Heating Centre Upgrade Works
  1. Competition notice published

    Mar 24, 11:24 AMMarch 24, 2026 11:24 AM
  2. Questions deadline

    Apr 17, 4:00 PMApril 17, 2026 4:00 PM
  3. Tender submission deadline

    Apr 23, 2:00 PMApril 23, 2026 2:00 PM
  4. Opening date

    Apr 23, 2:30 PMApril 23, 2026 2:30 PM
  5. Tender validity period

    Oct 20, 2:00 PMOctober 20, 2026 2:00 PM

Brief

St Muredach’s College, Ballina, Co Mayo (RN: 64510J) – Heating Centre Upgrade Works

Expired

The competition has expired without a winner being announced.

Deadline
Apr 23,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€70Kover 2 years

Brief

St. Muredach's College needs works for the isolation, disconnection, removal, and disposal of an existing boiler unit, and the supply and installation of a new floor-mounted condensing gas boiler/burner unit, including alterations and additions to pipework, a new twin-wall stainless steel flue system, changing over the gas governor, and alterations and additions to the existing BMS system, testing, commissioning, and associated builder's attendances and electrical works. The contract has a maximum total value of 70,000 EUR and a duration of 2 years.

Kjøle- og ventilasjonsteknologi

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at St. Muredach's College

From the notice

  • The works covered under this contract include the isolation, disconnection, removal and proper disposal of an existing “De-Dietrich” GT-409 sectional cast iron boiler unit (Boiler No 1), including the supply and installation of a new floor mounted Condensing Gas boiler /Burner Unit, including the alterations and additions to the existing main floor and return pipework connections to the main flow and return header, including the provision of a new twin wall stainless steel flue system from the new boiler (Boiler No 1) to roof level, including changing over the gas governor from Boiler No 1 to Boiler No 2, including some alterations and additions to the existing BMS system, testing and commissioning, including all associated builder’s attendances and electrical works, etc.

  • Contact

    wayne.walsh@stmuredachscollege.ie
  • Type
    Competition
  • Location
    West
  • Main code
    Heating plant construction work
    45251200
  • 45259300Heating-plant repair and maintenance work45331000Heating, ventilation and air-conditioning installation work45331100Central-heating installation work50720000Repair and maintenance services of central heating

Similar active competitions

  • Salesian College (Celbridge)_1840

    Kjøle- og ventilasjonsteknologi

    Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

    Salesian College in Celbridge, County Kildare, requires mechanical works to decommission and replace the existing space-heating installation and heating centre in its main building. The works are to be carried out in Ireland’s Mid-East region over 8 months, with a maximum total contract value of €491,611.50.

    Competition
    Nov 24, 2026(11 days)
    €491,611
  • Midleton CBS Primary School

    Mekaniske installasjoner

    Midleton CBS Primary School, Rosary Place, Midleton, Co. Cork – EWS 2no. Boiler Plant Replacement

    Midleton CBS Primary School requires boiler plant replacement works at its Rosary Place site in Midleton, County Cork, over 1 year, with a maximum total contract value of €200,000. The works include removing the existing plant from both boiler houses and installing wall-mounted boilers, pipework, valves, pumps, headers, a heat exchanger, insulation and boiler-house controls.

    Competition
    Nov 24, 2026(11 days)
    €200,000
  • Mayo Sligo and Leitrim ETB

    Elektrisk infrastruktur og veibelysning

    Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 1 (MSLETB)

    Mayo Sligo and Leitrim ETB requires the supply, delivery, installation and commissioning of modular, containerised biomass cabins, followed by 15 years of wood-pellet fuel supply and delivery, heat sales, and full operation, maintenance, repair and replacement of the equipment. The project covers six school sites—four in County Mayo and two in County Roscommon—and has a maximum total value of €4.55 million. The works and long-term fuel and heat services will be covered by two separate contracts; biomass heating installation will be carried out by a separately appointed Biomass Contractor.

    Competition
    Nov 20, 2026(7 days)
    €4,550,000