Superheater outlet steam headers at Avedøre Power Plant in Denmark.
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- 14. juniExpired
- Procedure
- Without prior noticeTwo stages
- Agreement
- Buying goods
Brief
Ørsted Bioenergy & Thermal Power A/S har indgået en aftale med Burmeister & Wain Energy ApS om levering af erstatningsudløbsdamprør, overgangsstykker og dele af forbindelsesrør til overhedningsapparatet HT3 på Avedøreværket i Københavns omegn. Kontrakten, der har en værdi af 7,3 millioner DKK, omfatter fremstilling, test og levering af 28 komplette udløbsrør samt detaljeret ingeniørarbejde, materialeforsyning, produktion, svejsning, projektledelse, varmebehandling, NDT-inspektion, trykprøvning, NoBo-inspektion, værkstedsbesøg under fremstilling, FAT-overvågning, midlertidig korrosionsbeskyttelse og transport til stedet. Formålet er at genoprette trykintegriteten og reducere risikoen for yderligere højtryksdampudslip efter en damplækage.
Industrimaskiner
Result
- Burmeister & Wain Energy ApSWinner
- 0Number of bids
- DKK 7,300,000Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ørsted Bioenergy & Thermal Power A/S
From the notice
The contract covers manufacture, testing and delivery of replacement outlet steam headers, transition pieces and part of connection tubes or the superheater HT3 outlet located at Avedøre Power Plant. The replacement is required following a steam leak incident and subsequent inspections where cracking indications were identified in dissimilar metal transition welds at the superheater HT3 outlet. The replacement is intended to restore pressure integrity and reduce the risk of further high pressure steam releases. A steam header is a thick walled manifold/collector that gathers steam from multiple tubes and distributes it onward, operating at very high pressure and temperature. Specifically, the contract covers the following supplies and services: Supply: • Complete 28 outlet headers according to BWE’s drawings, including transition pieces and part of connection tubes • Manufacturing activities including design, materials, welding, NDT, pressure testing and delivery Services: • Detail engineering • Supply of materials • Production and welding • Project management • PTS for purchase of materials • PMA for ASME SA-335 gr. P92 • PMA for ASME SA213 TP347HFG (if needed) • Heat treatment • NDT inspection according to WTP and applicable boiler standards (as per DKF) • Pressure testing • NoBo inspection • Workshop visits during manufacturing • FAT supervision • Temporary corrosion protection • Transportation to site
Contact
Ebru Kelesebrke@orsted.com- Result · PrequalificationType
- Københavns omegnLocation
- 42162000Main codeSteam-generating boilers