Find

  • All tenders
Tender search/Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)/Supervision Services for Reconstruction of the section Bar-Golubovci on the “Vrbnica-Bar" railway line in Montenegro

Supervision Services for Reconstruction of the section Bar-Golubovci on the “Vrbnica-Bar" railway line in Montenegro

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Feb 24,Expired
Award
Procedure
With prequalificationTwo stages
Agreement
Buying services
Estimated value
€4.5Mover 52 months

Brief

Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG) treba usluge nadzora (FIDIC inženjer) za rekonstrukciju deonice pruge Bar-Golubovci (oko 40 km otvorene pruge) u Crnoj Gori, uključujući zamenu gornjeg stroja, obnovu objekata, radove na zaštiti kosina, zamenu kontaktne mreže i ETS sistema, kao i modernizaciju signalizacije. Ugovor je vredan do 4,5 miliona evra i trajaće 52 meseca. Kandidati moraju imati prosečan godišnji promet od najmanje 2,5 miliona evra u poslednje tri finansijske godine (2022, 2023, 2024) i pozitivne finansijske rezultate u istom periodu (pozitivna neto vrednost i koeficijent likvidnosti veći od 1).

Byggeteknisk konsulentvirksomhet

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    The average annual turnover must be at least EUR 2.5m for the last 3 financial years (i.e. 2022, 2023 and 2024). In the case of applications submitted by a joint venture (JV), the JV shall collectively meet this criterion, while the lead partner shall meet not less than 60% of this criterion on its own. The experience and financial record of any proposed sub-consultant shall not be taken into consideration.

    Documentation Requirement

    Not specified.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Net worth shall be positive in each of the last three financial years (i.e. 2022, 2023 and 2024). All JV partners shall meet this criterion individually. The experience and financial record of any proposed sub-consultant shall not be taken into consideration.

    Documentation Requirement

    Not specified.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Liquidity ratio shall be more than 1 (one) in each of the last three financial years (i.e. 2022, 2023 and 2024). All JV partners shall meet this criterion individually. The experience and financial record of any proposed sub-consultant shall not be taken into consideration.

    Documentation Requirement

    Not specified.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Price is not the only award criterion and all criteria are stated only in the procurement documents

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Services to act as FIDIC Engineer for the reconstruction of the section Bar-Golubovci (around 40 km of open railway line), including replacement of the permanent way, refurbishment of structures, slope protection works, replacement of OHL and ETS plus modernization of signalling.

  • Contact

    Mr. Dragan Radevićprojects@zicg.me
  • Type
    Competition · Prequalification
  • Main code
    Construction consultancy services
    71530000

Similar active competitions

  • Ministry of Education, Science and Innovation

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of design and supervision services for the reconstruction works of kindergarten in Zabjelo, Podgorica, Kotor and Momisici, Podgorica.

    Montenegro’s Ministry of Education, Science and Innovation needs design and construction-supervision consultancy services for the reconstruction of kindergartens in Zabjelo, Kotor and Momišići, Podgorica. The contract will run for 29 months and has a maximum total value of EUR 480,844. Quality accounts for 80% of the award score and price for 20%.

    Competition
    Dec 4, 2026(11 days)
    €480,844
  • Limited Liability Company “Putevi Srbije” Belgrade

    Rådgivende ingeniørtjenester for bygg og anlegg

    Supervision of Rehabilitation Works of Local Roads under SIRN

    LLC “Putevi Srbije” needs consulting services to supervise rehabilitation works on local roads under SIRN over 3 years, with a maximum total contract value of EUR 2.13 million. The procurement covers engineering and construction supervision; supplier qualifications are to be assessed against requirements in the procurement documents, including relevant professional education and qualifications. Price is not the sole award criterion; all evaluation criteria are specified in the procurement documents.

    Competition
    Dec 15, 2026(22 days)
    €2,130,000
  • PKP Polskie Linie Kolejowe S.A.

    "Pełnienie nadzoru inżynierskiego nad realizacją projektu wykonawczego branży srk oraz kompleksowych robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów-Szczyrzyc" w ramach Projektu pn.” Budowa nowej linii kolejowej Podłęże-Szczyrzyc-Tymbark/Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka-Nowy Sącz – Etap II

    PKP Polskie Linie Kolejowe S.A. poszukuje usług inżyniera kontraktu i nadzoru nad projektem wykonawczym branży sterowania ruchem kolejowym (srk) oraz kompleksowymi robotami budowlanymi na linii kolejowej nr 622, na odcinku Gdów–Szczyrzyc w województwie małopolskim; usługi mają być świadczone przez 38 miesięcy. Zakres obejmuje zarządzanie kontraktem i jego rozliczeniami, monitoring i sprawozdawczość rzeczowo-finansową, nadzór techniczny i inwestorski oraz nadzór środowiskowy i przyrodniczy. Zamawiający wymaga co najmniej jednej odpowiedniej referencji dotyczącej nadzoru nad budową lub przebudową zelektryfikowanej linii kolejowej, przy wartości robót co najmniej 500 mln zł brutto, obejmującej rozbudowany zakres prac kolejowych, obiektów inżynieryjnych i urządzeń srk, a także dokumentacji projektowej srk. Wymagany jest stały zespół złożony m.in. z inżyniera projektu, inżyniera rezydenta, koordynatora przeglądu dokumentacji oraz inspektorów nadzoru tunelowego i mostowego. Oferty będą oceniane według ceny (60%), dodatkowych kwalifikacji personelu (30%) oraz doświadczenia zespołu we wspólnej realizacji podobnych nadzorów (10%).

    Competition
    Dec 3, 2026(10 days)