Supplier Qualification System for Geoscience Services
Geotekniske undersøkelser
Energinet etablerer et leverandørkvalifikationssystem (SQS) for indkøb af geofysiske og geotekniske ydelser både på land og offshore. Systemet omfatter syv kategorier: Offshore Geofysiske Stedundersøgelser, Offshore Geotekniske Stedundersøgelser, Offshore Ruteundersøgelser, Onshore Stedundersøgelser, Offshore UXO Undersøgelser, Offshore UXO Rådgivning og Offshore Kabel- og Rørsporing. For at blive optaget i SQS skal ansøgeren opfylde minimumskravene i den seneste årsrapport, som beskrevet i "Guide til SQS" (dok. nr. 20/02476-2) afsnit 3.2.1.1, hvor minimumskravene varierer mellem de forskellige kategorier.
About the bid
- Contact name
- Procurement - S
- Contact phone
- +45 70 10 22 44
- Contact email
- procurement@energinet.dk
- Address
- Tonne Kjærsvej 65, 7000 Fredericia
Energinet intends to establish a Supplier Qualification System (“SQS”) for the procurement of Geophysical and Geotechnical work onshore and offshore. The SQS is intended for the procurement of seven categories: • Category 1: Offshore Geophysical Site Investigations • Category 2: Offshore Geotechnical Site Investigations • Category 3: Offshore Route Survey • Category 4: Onshore Site Investigations • Category 5: Offshore UXO Investigations • Category 6: Offshore UXO Consultancy • Category 7: Offshore Cable and Pipeline Tracking See more details in doc. no. 20/02476-2 “Guide to SQS”.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Description
For admittance to the SQS, the Applicant must meet the minimum requirements in the latest annual report listed in the “Guide to SQS” (doc. no. 20/02476) section 3.2.1.1. Please note that the minimum requirements are different in the different categories.
Documentation Requirement
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Energinet
- Title
- Supplier Qualification System for Geoscience Services
- Type
- Main code
- Supplemental codes