Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
Planned
The competition has not been announced yet.
- Deadline
- Jun 29,Expired
- Agreement
- Buying goods
- Estimated value
- €1.1Mover 4 years
Brief
The European Commission, DG JRC - Joint Research Centre, is planning the procurement of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. This includes the design, manufacturing, delivery, installation, and commissioning of a 50 Nm3/h electrolyser (upgradable to 100 Nm3/h) that delivers hydrogen at 30 barg, along with external components and a comprehensive service package. The purpose is to produce green hydrogen using renewable energy from the JRC Ispra site's photovoltaic plant for self-consumption and blending into the natural gas pipeline.
Industrimaskiner
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at European Commission, DG JRC - Joint Research Centre
From the notice
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX-classified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: - An MV/LV transformer - A thermal management system (dry cooler) - A low-pressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 - A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for self-consumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's co-generators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the co-generators across current and future PV expansion scenarios.
Contact
jrc-ispra-dir-r-procurement@ec.europa.eu- PlanningType
- 42980000Main codeGas generators
- 24111600Hydrogen45251100Construction work for power plant45253100Demineralisation plant construction work45255800Gas-production plant construction work45259000Repair and maintenance of plant45310000Electrical installation work45317200Electrical installation work of transformers51100000Installation services of electrical and mechanical equipment71320000Engineering design services