Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
Industrimaskiner
The European Commission, DG ENV - Environment, needs the supply, installation, and maintenance of a Proton Exchange Membrane (PEM) electrolyser for hydrogen production at the JRC Ispra site in Italy. The contract has a maximum total value of 1,100,000 EUR and a duration of 74 months. The core of the system is a 50 Nm3/h electrolyser (upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg, with the main equipment delivered in a containerized/skid version. The procurement also includes external components such as an MV/LV transformer, a thermal management system, a low-pressure hydrogen storage system, and a gas blender. Additionally, a comprehensive service package covering Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract is required. The purpose is to produce green hydrogen using excess energy from the JRC Ispra site's photovoltaic plant, which will then be blended into the natural gas pipeline to feed the site's co-generators. Offers will be evaluated based on quality (60%) and price (40%).
About the bid
- Contact phone
- +32 2 299 11 11
- Contact email
- jrc-ispra-dir-r-procurement@ec.europa.eu
- Address
- Avenue d' Auderghem 19, BRE2 10/DCS, B-1040 Brussels
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogenerators across current and future PV expansion scenarios
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Please consult the procurement documents.
Description
Please consult the procurement documents.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- European Commission, DG ENV - Environment
- Title
- Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
- Type
- Main code
- Supplemental codes
- Estimated value
- €1,100,000.00
- Duration
- 74 months