Supply of the Upgraded Injector of the Linear IFMIF Prototype Accelerator (LIPAc)

Cancelled

The competition has been cancelled.

Qualification deadline
6. okt. 2025Expired
Award
Financial score, weight 40
Procedure
With negotiationTwo stages
Agreement
Buying goods
Estimated value
€6Mover 4 years

Brief

The scope of the contract consists of the design, manufacturing, and validation activities to complete the procurement and the testing up to CW operation in nominal conditions of an upgraded Injector for the IFMIF accelerators—i.e., LIPAc and/or IFMIF-DONES.

Electrical equipment and lighting

Result

TED
  • Reason for cancellation
    All tenders, requests to participate or projects were withdrawn or found inadmissible
  • Number of tenders received
    1

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at European Joint Undertaking for ITER and the Development of Fusion Energy (F4E)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Technical score

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Financial score

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The scope of the contract consists of the design, manufacturing, and validation activities to complete the procurement and the testing up to CW operation in nominal conditions of an upgraded Injector for the IFMIF accelerators—i.e., LIPAc and/or IFMIF-DONES.

  • Contact

    Nadia MERLINadia.Merli@f4e.europa.eu
  • Type
    Result · Prequalification
  • Main code
    Linear accelerators
    31643100

Similar active competitions

  • European Joint Undertaking for ITER and the Development of Fusion Energy (F4E)

    Fire and safety services

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (Fusion for Energy) needs services and hardware for the JT-60SA actively cooled divertor over a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes the production and/or acquisition of Langmuir probes, halo-current coils, thermocouples, gas-injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water-pipe caps. Offers will be assessed on technical quality (60%) and price (40%).

    Competition with qualification
    10. des. 2026(12 days)
  • SCK•CEN

    Electrical equipment and lighting

    Beam Loss Monitors (BLMs) for the SC Linac

    SCK•CEN needs beam loss monitors (BLMs) for the 100 MeV proton linear accelerator in MYRRHA Phase I (MINERVA), with a 3-year contract for delivery in the Turnhout district of Belgium. The monitors will be used with the superconducting linear accelerator (SC Linac).

    Competition
    2. des. 2026(4 days)
  • SCK•CEN

    Electrical equipment and lighting

    Beam Loss Monitors (BLMs) for the NC Linac

    SCK•CEN needs beam loss monitor supplies for the MYRRHA Phase I (MINERVA) 100 MeV proton linear accelerator, over a 3-year contract. The equipment is intended for the NC Linac and will be delivered in the Turnhout district of Belgium.

    Competition
    2. des. 2026(4 days)