European Joint Undertaking for ITER and the Development of Fusion Energy (F4E)
Supply and Onsite Support for the Maintenance of the Cryogenic Systems for JT-60SA
The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) has modified a contract with AIR LIQUIDE CRYOGENIC SERVICES for the supply and onsite support for the maintenance of the Cryogenic Systems for JT-60SA. The services, which include preventive maintenance, corrective maintenance, cryogenic system upgrades, and the procurement of spare parts, will be delivered in Barcelona over a period of 8 months.
Supply of cryopumps for the ITER Heating and Diagnostic Neutral Beam System
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') necesita el suministro de 3 criobombas (2 para el sistema ITER HNB y 1 para el sistema ITER DNB) con un valor total máximo de 18.066.000 EUR y una duración de 60 meses. La evaluación de las ofertas se basará en el precio y la calidad, según se detalla en los documentos de la licitación.
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') está planificando la adquisición de 2 criobombas para el ITER HNB, 1 criobomba para el ITER DNB, 1 cubículo eléctrico, componentes de repuesto y herramientas, y componentes de cubículo I&C.
Manufacturing of the Drift Duct for ITER Neutral Beam Injectors
Engineering, manufacturing design, manufacturing qualifications, material procurement, manufacturing, factory acceptance tests and delivery at site of the 2 (two) Drift Ducts for neutral beam injectors 1 and 2.
Supply of the Upgraded Injector of the Linear IFMIF Prototype Accelerator (LIPAc)
The scope of the contract consists of the design, manufacturing, and validation activities to complete the procurement and the testing up to CW operation in nominal conditions of an upgraded Injector for the IFMIF accelerators—i.e., LIPAc and/or IFMIF-DONES.
Maintenance and Optimization of the Radio Frequency Power System modules SSPA
The scope of this envisaged framework is for Maintenance and Optimization of the Radio Frequency Power System modules SSPA part of the IFMIF/EVEDA project. The scope of the work includes the procurement of spare parts and the supporting services to ensure the availability and the maintenance of this system.
Support for Cold Cathode Gauge (CCG) Testing
The purpose of this contract is to secure the test facility with all the necessary personnel, skills, equipment and consumables to perform tests on multiple CCG sensors.
Maintenance and Optimization of the PSYS, LLRF, BPM digitizers, WR systems and prototyping and supply of new PSYS for the LIPAc RFPS
The scope of this envisaged framework is for Maintenance and Optimization of the PSYS, LLRF, BPM digitizers, WR systems and prototyping and supply of new PSYS for the LIPAc Frequency Power System modules part of the IFMIF/EVEDA project. The scope of the work includes the procurement of spare parts and the supporting services to ensure the availability and the maintenance of this system.
Service Framework Contract for a Logistic Provider for Broader Approach
This service framework contract is for a logistics provider to arrange for Fusion for Energy the transport of any conventionally-sized package within Europe, from Europe to Japan and from Japan to Europe, under the Broader Approach agreement.
Maintenance and Optimization of the Radio Frequency Power Supply Systems Modules and the Superconducting Magnets Power Supplies (SCMPS)
The scope of this contract is the provision of maintenance support services, including the provision of spare parts and improvements of the Radio Frequency Power System (RFPS) of IFMIF/EVEDA and the Magnet Power Supply Systems (MPS) of JT-60SA.
SUPPORT SERVICES ON HEALTH & SAFETY MATTERS FOR ON-SITE INSTALLATION, COMMISSIONING AND TESTING ACTIVITIES FOR BROADER APPROACH
The scope of the Framework Contract is to provide the services of ‘On‐site Health and Safety Consultant’ (OSH&SC) in support to the F4E On-site Representative. The Framework Contract shall be implemented through specific contracts based on specific Task Orders on a typical timeframe of 4‐12 months. For each specific contract, the work consists of providing support and consultancy to the F4E On-site Representative in preparation and during the activities of on‐site installation, commissioning and testing of systems and components procured under the responsibility of F4E in the frame of the Broader Approach.
Design, procurement, installation, test and commissioning of the Radiological Environmental Monitoring System (REMS) for the ITER First Plasma Stage
Descoping of TKC (Tokamak Complex) RMS (Release Monitoring System) procurement for First Plasma and inclusion to contract scope of a suitability analysis for TKC ((Tokamak Complex) REMS (Radiological and Environmental Monitoring System) manufacturers.
SUPPLY OF THE HE LEAK LOCALIZATION SYSTEMS FOR ITER
The subject matter of the Contract is the supply of a Helium Leak Localization System and Magnet Feeder Gauges System.
Maintenance and Improvements of the Magnet Power Supply System of JT-60SA
The activities and services to be performed under this framework contract are aimed at ensuring the maintenance of the Magnet Power Supply Systems (MPS) of JT-60SA, in order to ensure their availability to perform timely the experimental campaign of JT-60SA. The scope of supply includes the delivery of hardware (i.e. spare parts, new developments) and associated software as well the needed maintenance, installation and commissioning services which encompass project management and engineering support services.
Elements of Preliminary Design of the HCCP-TBM Set – Part 3
This is the fourth Specific Contract of Lot #1. The objective of this SC #4 is to advance in the second phase of preliminary design phase for the HCCP TBM box. The activities of this Specific Contract are organized in the following tasks: Thermomechanical and fluid-dynamic analyses: validation of the reference design and complementary analysis; Implementation and integration of Heaters,Pipes and instrumentation for the TBM set; CAD Activities supporting.
The procurement of the Heating Neutral Beam (HNB) Drift Ducts (DD) consists in the Drift Duct Bellows and the Drift Duct Liner and is based on a Build-to-Print (BtP). Additional tools necessary for the Factory Acceptance Tests are also part of the procurement and are designed up to built-to-print level by IO. Finally, few equipment (tools, jigs, fixtures, test bench, but also the Mineral Insulated cables) will be designed and delivered by the supplier. The DD parts have been designed and shall be manufactured in accordance with (EN 14917) for the bellows, SDC-IC for the DD Liner (the manufacturing requirements are defined in the Annex B) and RCC-MR 2007 (class 2). The NB DD is classified ITER Quality Class 1 and ITER Safety Class 1, PED Cat I and ESPN Level N3. The main dimensions and weight of the Drift Duct are Diameter: 2900 mm, Length: 1900 mm and Weight: 6.7 t. Based on these Build-to-Print specifications, the scope of work of the supplier includes, mainly: 1. Manufacturing engineering; 2. Procurement; 3. Manufacturing, testing and cleaning; 4. Factory acceptance testing; 5. Packaging and shipment to a Site in the European Union; 6. Documentation.